全文获取类型
收费全文 | 293篇 |
免费 | 24篇 |
国内免费 | 11篇 |
出版年
2023年 | 1篇 |
2022年 | 1篇 |
2021年 | 1篇 |
2020年 | 3篇 |
2019年 | 4篇 |
2018年 | 2篇 |
2017年 | 12篇 |
2016年 | 18篇 |
2015年 | 12篇 |
2014年 | 23篇 |
2013年 | 18篇 |
2012年 | 26篇 |
2011年 | 26篇 |
2010年 | 16篇 |
2009年 | 23篇 |
2008年 | 14篇 |
2007年 | 12篇 |
2006年 | 16篇 |
2005年 | 17篇 |
2004年 | 17篇 |
2003年 | 9篇 |
2002年 | 5篇 |
2001年 | 6篇 |
2000年 | 10篇 |
1999年 | 6篇 |
1998年 | 5篇 |
1997年 | 1篇 |
1996年 | 1篇 |
1995年 | 6篇 |
1994年 | 2篇 |
1993年 | 3篇 |
1992年 | 1篇 |
1991年 | 4篇 |
1990年 | 7篇 |
排序方式: 共有328条查询结果,搜索用时 15 毫秒
221.
We study joint preventive maintenance (PM) and production policies for an unreliable production‐inventory system in which maintenance/repair times are non‐negligible and stochastic. A joint policy decides (a) whether or not to perform PM and (b) if PM is not performed, then how much to produce. We consider a discrete‐time system, formulating the problem as a Markov decision process (MDP) model. The focus of the work is on the structural properties of optimal joint policies, given the system state comprised of the system's age and the inventory level. Although our analysis indicates that the structure of optimal joint policies is very complex in general, we are able to characterize several properties regarding PM and production, including optimal production/maintenance actions under backlogging and high inventory levels, and conditions under which the PM portion of the joint policy has a control‐limit structure. In further special cases, such as when PM set‐up costs are negligible compared to PM times, we are able to establish some additional structural properties. © 2005 Wiley Periodicals, Inc. Naval Research Logistics, 2005. 相似文献
222.
223.
以涡轮轴发动机工作特性建模为中心,对某系列直升机飞行性能进行仿真研究,力争实现对直升机实施"基于状态的维修"。讨论了直升机飞行性能和涡轮轴发动机特性的表述方法,建立了涡轮轴发动机的数学模型,并讨论了其解法与应用。基于发动机台架性能仿真程序对该模型进行简化,得到涡轮轴发动机工作过程的热力学模型。对发动机性能进行计算完成飞行性能仿真,应用结果表明该方法是可信、高效的。 相似文献
224.
The majority of scheduling literature assumes that the machines are available at all times. In this paper, we study single machine scheduling problems where the machine maintenance must be performed within certain intervals and hence the machine is not available during the maintenance periods. We also assume that if a job is not processed to completion before the machine is stopped for maintenance, an additional setup is necessary when the processing is resumed. Our purpose is to schedule the maintenance and jobs to minimize some performance measures. The objective functions that we consider are minimizing the total weighted job completion times and minimizing the maximum lateness. In both cases, maintenance must be performed within a fixed period T, and the time for the maintenance is a decision variable. In this paper, we study two scenarios concerning the planning horizon. First, we show that, when the planning horizon is long in relation to T, the problem with either objective function is NP-complete, and we present pseudopolynomial time dynamic programming algorithms for both objective functions. In the second scenario, the planning horizon is short in relation to T. However, part of the period T may have elapsed before we schedule any jobs in this planning horizon, and the remaining time before the maintenance is shorter than the current planning horizon. Hence we must schedule one maintenance in this planning horizon. We show that the problem of minimizing the total weighted completion times in this scenario is NP-complete, while the shortest processing time (SPT) rule and the earliest due date (EDD) rule are optimal for the total completion time problem and the maximum lateness problem respectively. © 1999 John Wiley & Sons, Inc. Naval Research Logistics 46: 845–863, 1999 相似文献
225.
226.
227.
分析了传统的统一调度下和电力市场环境下发电厂机组检修计划的不同,在此基础上提出不同于以往的检修计划方法。以检修费用、电价收益损失和违约金之和最小为目标函数,然后采用0-1整数规划的直接枚举法求解。最后通过算例论证了该方法的可行性。 相似文献
228.
一种基于模糊可靠度确定雷达故障检测间隔期的方法 总被引:4,自引:0,他引:4
将雷达装备参数漂移的动态范围模糊化 ,并基于数理统计中参数估计的理论 ,建立了雷达装备的参数模糊可靠度预计模型。把该模型应用于确定雷达电参数的故障检测周期 ,并通过实例论证此方法的优越性和实用性。 相似文献
229.
使用与维修工作分析与保障资源需求确定 总被引:2,自引:0,他引:2
详细描述了使用与维修工作分析、保障设备需求确定、备品备件需求确定、技术资料内容确定、人员与技术等级需求确定的主要内容及使用与维修工作分析与保障资源需求确定之间的关系,为在研制阶段确定出保障资源提供一种科学而适用的方法. 相似文献
230.
影响武器装备维修质量的基本要素分析 总被引:4,自引:0,他引:4
制约、影响维修质量的因素是多方面的.从武器装备系统的全寿命过程出发,将影响维修质量的基本要素概括为7个方面即维修人员素质、维修设备与设施的状况、装配工艺、维修生产环境、原材料、备品备件的质量、维修管理制度等.通过具体研究、分析影响维修质量的这些因素及其特征量,指明这是实现维修质量管理和评定目标的必经之路,只有影响因素明确了,才能有的放矢地对维修质量进行管理、控制与评定. 相似文献