首页 | 本学科首页   官方微博 | 高级检索  
文章检索
  按 检索   检索词:      
出版年份:   被引次数:   他引次数: 提示:输入*表示无穷大
  收费全文   172篇
  免费   80篇
  国内免费   6篇
  258篇
  2023年   2篇
  2022年   2篇
  2021年   5篇
  2020年   9篇
  2019年   3篇
  2018年   4篇
  2017年   9篇
  2016年   12篇
  2015年   12篇
  2014年   13篇
  2013年   12篇
  2012年   15篇
  2011年   18篇
  2010年   6篇
  2009年   15篇
  2008年   10篇
  2007年   9篇
  2006年   18篇
  2005年   18篇
  2004年   14篇
  2003年   7篇
  2002年   6篇
  2001年   6篇
  2000年   12篇
  1999年   7篇
  1998年   10篇
  1997年   1篇
  1995年   1篇
  1994年   1篇
  1991年   1篇
排序方式: 共有258条查询结果,搜索用时 0 毫秒
161.
Polling systems have been widely studied, however most of these studies focus on polling systems with renewal processes for arrivals and random variables for service times. There is a need driven by practical applications to study polling systems with arbitrary arrivals (not restricted to time-varying or in batches) and revealed service time upon a job's arrival. To address that need, our work considers a polling system with generic setting and for the first time provides the worst-case analysis for online scheduling policies in this system. We provide conditions for the existence of constant competitive ratios, and competitive lower bounds for general scheduling policies in polling systems. Our work also bridges the queueing and scheduling communities by proving the competitive ratios for several well-studied policies in the queueing literature, such as cyclic policies with exhaustive, gated or l-limited service disciplines for polling systems.  相似文献   
162.
This article presents a flexible days‐on and days‐off scheduling problem and develops an exact branch and price (B&P) algorithm to find solutions. The main objective is to minimize the size of the total workforce required to cover time‐varying demand over a planning horizon that may extend up to 12 weeks. A new aspect of the problem is the general restriction that the number of consecutive days on and the number of consecutive days off must each fall within a predefined range. Moreover, the total assignment of working days in the planning horizon cannot exceed some maximum value. In the B&P framework, the master problem is stated as a set covering‐type problem whose columns are generated iteratively by solving one of three different subproblems. The first is an implicit model, the second is a resource constrained shortest path problem, and the third is a dynamic program. Computational experiments using both real‐word and randomly generated data show that workforce reductions up to 66% are possible with highly flexible days‐on and days‐off patterns. When evaluating the performance of the three subproblems, it was found that each yielded equivalent solutions but the dynamic program proved to be significantly more efficient. © 2013 Wiley Periodicals, Inc. Naval Research Logistics 60: 678–701, 2013  相似文献   
163.
雷达、通信、电子战等多功能一体化是未来作战平台电子系统的发展方向之一,任务优化调度技术是多功能电子系统的关键技术。针对多功能电子系统射频任务调度问题,在建立任务调度数学模型的基础上,采用了改进的遗传算法对模型进行了求解,提出了任务列表和随机键结合的编码方式,设计了以执行时间最短和任务丢失率最小为目标的多目标适应度函数,采用轮盘赌选择、改进型双点交叉和对称交换变异方式设计遗传操作。通过仿真实验,验证了所设计任务调度方法的有效性和优越性。  相似文献   
164.
In a master surgery scheduling (MSS) problem, a hospital's operating room (OR) capacity is assigned to different medical specialties. This task is critical since the risk of assigning too much or too little OR time to a specialty is associated with overtime or deficit hours of the staff, deferral or delay of surgeries, and unsatisfied—or even endangered—patients. Most MSS approaches in the literature focus only on the OR while neglecting the impact on downstream units or reflect a simplified version of the real‐world situation. We present the first prediction model for the integrated OR scheduling problem based on machine learning. Our three‐step approach focuses on the intensive care unit (ICU) and reflects elective and urgent patients, inpatients and outpatients, and all possible paths through the hospital. We provide an empirical evaluation of our method with surgery data for Universitätsklinikum Augsburg, a German tertiary care hospital with 1700 beds. We show that our model outperforms a state‐of‐the‐art model by 43% in number of predicted beds. Our model can be used as supporting tool for hospital managers or incorporated in an optimization model. Eventually, we provide guidance to support hospital managers in scheduling surgeries more efficiently.  相似文献   
165.
One of the achievements of scheduling theory is its contribution to practical applications in industrial settings. In particular, taking finiteness of the available production capacity explicitly into account, has been a major improvement of standard practice. Availability of raw materials, however, which is another important constraint in practice, has been largely disregarded in scheduling theory. This paper considers basic models for scheduling problems in contemporary manufacturing settings where raw material availability is of critical importance. We explore single scheduling machine problems, mostly with unit or all equal processing times, and Lmax and Cmax objectives. We present polynomial time algorithms, complexity and approximation results, and computational experiments. © 2005 Wiley Periodicals, Inc. Naval Research Logistics, 2005.  相似文献   
166.
Some properties of the geometric process are studied along with those of a related process which we propose to call the α‐series process. It is shown that the expected number of counts at an arbitrary time does not exist for the decreasing geometric process. The decreasing version of the α‐series process does have a finite expected number of counts, under certain conditions. This process also has the same advantages of tractability as the geometric process; it exhibits some properties which may make it a useful complement to the increasing geometric process. In addition, it may be fit to observed data as easily as the geometric process. Applications in reliability and stochastic scheduling are considered in order to demonstrate the versatility of the alternative model. © 2005 Wiley Periodicals, Inc. Naval Research Logistics, 2005  相似文献   
167.
把改进的蚁群算法应用到云计算任务调度中,通过将任务在虚拟机上的一次分配作为蚂蚁的一次成功搜索,实现了虚拟机的负载均衡和调度时间的优化,提高云计算资源分配的效率。通过在Cloud Sim平台下进行仿真测试,结果显示,改进蚁群算法在负载均衡性能和总的任务调度时间方面均优于基本的蚁群算法。  相似文献   
168.
We consider a parallel‐machine scheduling problem with jobs that require setups. The duration of a setup does not depend only on the job just completed but on a number of preceding jobs. These setup times are referred to as history‐dependent. Such a scheduling problem is often encountered in the food processing industry as well as in other process industries. In our model, we consider two types of setup times—a regular setup time and a major setup time that becomes necessary after several “hard‐to‐clean” jobs have been processed on the same machine. We consider multiple objectives, including facility utilization, flexibility, number of major setups, and tardiness. We solve several special cases assuming predetermined job sequences and propose strongly polynomial time algorithms to determine the optimal timing of the major setups for given job sequences. We also extend our analysis to develop pseudopolynomial time algorithms for cases with additional objectives, including the total weighted completion time, the total weighted tardiness, and the weighted number of tardy jobs. © 2012 Wiley Periodicals, Inc. Naval Research Logistics, 2012  相似文献   
169.
A national recycling and waste management company provides periodic services to its customers from over 160 service centers. The services are performed periodically in units of weeks over a planning horizon. The number of truck‐hours allocated to this effort is determined by the maximum weekly workload during the planning horizon. Therefore, minimizing the maximum weekly workload results in minimum operating expenses. The perfectly periodic service scheduling (PPSS) problem is defined based on the practices of the company. It is shown that the PPSS problem is strongly NP‐hard. Attempts to solve large instances by using an integer programming formulation are unsuccessful. Therefore, greedy BestFit heuristics with three different sorting schemes are designed and tested for six real‐world PPSS instances and 80 randomly generated data files. The heuristics provide effective solutions that are within 2% of optimality on average. When the best found BestFit schedules are compared with the existing schedules, it is shown that operational costs are reduced by 18% on average. © 2012 Wiley Periodicals, Inc. Naval Research Logistics 59: 160–171, 2012  相似文献   
170.
This article treats the problem of subdividing an area for storing containers such that the workload is evenly shared among the cranes operating the resulting subareas. We consider two crane sets: while noncrossing constraints between cranes of the same set need to be observed, cranes of different sets do not interfere. Such a problem setting is, for instance, relevant for scheduling the (un‐)loading of vessels by parallel quay cranes operating on opposing berths or in container yards with cross‐over cranes. We formalize the resulting optimization problem, prove computational complexity, and present exact and heuristic solution procedures. © 2012 Wiley Periodicals, Inc. Naval Research Logistics, 2012  相似文献   
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号