首页 | 本学科首页   官方微博 | 高级检索  
文章检索
  按 检索   检索词:      
出版年份:   被引次数:   他引次数: 提示:输入*表示无穷大
  收费全文   134篇
  免费   32篇
  国内免费   5篇
  2022年   1篇
  2021年   2篇
  2020年   4篇
  2019年   8篇
  2018年   1篇
  2017年   6篇
  2016年   5篇
  2015年   2篇
  2014年   1篇
  2013年   13篇
  2012年   12篇
  2011年   10篇
  2010年   9篇
  2009年   14篇
  2008年   8篇
  2007年   11篇
  2006年   12篇
  2005年   8篇
  2004年   8篇
  2003年   5篇
  2002年   6篇
  2001年   5篇
  2000年   3篇
  1999年   4篇
  1998年   2篇
  1997年   1篇
  1995年   3篇
  1993年   1篇
  1992年   2篇
  1990年   2篇
  1989年   1篇
  1988年   1篇
排序方式: 共有171条查询结果,搜索用时 15 毫秒
131.
We study a class of new scheduling problems which involve types of teamwork tasks. Each teamwork task consists of several components, and requires a team of processors to complete, with each team member to process a particular component of the task. Once the processor completes its work on the task, it will be available immediately to work on the next task regardless of whether the other components of the last task have been completed or not. Thus, the processors in a team neither have to start, nor have to finish, at the same time as they process a task. A task is completed only when all of its components have been processed. The problem is to find an optimal schedule to process all tasks, under a given objective measure. We consider both deterministic and stochastic models. For the deterministic model, we find that the optimal schedule exhibits the pattern that all processors must adopt the same sequence to process the tasks, even under a general objective function GC = F(f1(C1), f2(C2), … , fn(Cn)), where fi(Ci) is a general, nondecreasing function of the completion time Ci of task i. We show that the optimal sequence to minimize the maximum cost MC = max fi(Ci) can be derived by a simple rule if there exists an order f1(t) ≤ … ≤ fn(t) for all t between the functions {fi(t)}. We further show that the optimal sequence to minimize the total cost TC = ∑ fi(Ci) can be constructed by a dynamic programming algorithm. For the stochastic model, we study three optimization criteria: (A) almost sure minimization; (B) stochastic ordering; and (C) expected cost minimization. For criterion (A), we show that the results for the corresponding deterministic model can be easily generalized. However, stochastic problems with criteria (B) and (C) become quite difficult. Conditions under which the optimal solutions can be found for these two criteria are derived. © 2004 Wiley Periodicals, Inc. Naval Research Logistics, 2004  相似文献   
132.
借助于趋势分析法进行效费权衡 ,分析了装备系统效能和费用随性能指标变化的发展趋势 ,确定了性能指标的变化对效能与费用的影响大小 ,进而可为装备的研制发展提供有价值的权衡依据 .  相似文献   
133.
Operating costs per unit of input or output are often claimed to grow faster in defence than elsewhere in the economy. In this paper, we outline several possible reasons as to why operating costs increase at higher rates in defence, including differences in the input factor mix and productivity growth, the technological complexity required to maintain the relative effect of weapon systems and a gradual reduction in the number of units and activity. We investigate whether operating costs grow at a faster rate than elsewhere in the economy, by estimating growth in real output unit costs in the Norwegian Armed Forces for the period 1994–2013, using activity as a measure of output. We find no increase beyond general inflation in structural (fixed) costs, whereas activity-based (variable) costs per unit of activity increase significantly.  相似文献   
134.
This article provides conditions under which total‐cost and average‐cost Markov decision processes (MDPs) can be reduced to discounted ones. Results are given for transient total‐cost MDPs with transition rates whose values may be greater than one, as well as for average‐cost MDPs with transition probabilities satisfying the condition that there is a state such that the expected time to reach it is uniformly bounded for all initial states and stationary policies. In particular, these reductions imply sufficient conditions for the validity of optimality equations and the existence of stationary optimal policies for MDPs with undiscounted total cost and average‐cost criteria. When the state and action sets are finite, these reductions lead to linear programming formulations and complexity estimates for MDPs under the aforementioned criteria.© 2017 Wiley Periodicals, Inc. Naval Research Logistics 66:38–56, 2019  相似文献   
135.
机载电子设备研制费的估算是飞机费用预测的一大难题。近年来出现的基于设备静态效能的统计方法,将机载电子设备众多的特征参数综合成一个静态效能指数,并利用该指数和设备的重量(体积)、可靠性指标等参数进行统计分析。但是在实际应用中,常用的效能评估方法考虑因素不全面,且受主观性影响较大;同时,电子设备的效能指数和重量一般都表现出较强的相关性,不能并列作为费用估算变量。为此,在提出能力综合评估法代替常用的效能指数法的基础上,采用"效重比"作为一个综合性参数的思想,建立了基于"效重比"的机载火控雷达研制费用估算模型;并通过机载火控雷达研制费用的估算实例验证了模型的可用性。  相似文献   
136.
作业成本法在包装成本管理中的应用   总被引:2,自引:0,他引:2  
我国的市场竞争日趋激烈,产品的复杂程度越来越高,传统成本计算方法已无法满足对成本精确性的要求.鉴于作业成本法(ABC法)在成本管理领域中的日益普及,重点探讨ABC法在包装成本管理中的运用.通过对某企业包装成本进行实例计算和作业分析,说明应用ABC法可以得到相对准确的包装成本信息,并找出影响包装成本的主要因素及相应的解决方法,为包装成本管理提供了依据.  相似文献   
137.
寿命周期费用数据采集是寿命周期费用分析的关键问题之一。简要介绍了寿命周期费用的概念,探讨了寿命周期费用数据采集的目的与要求、费用数据的来源、内容、采集形式,以及对费用数据的处理等与寿命周期费用数据采集有关的问题。目的在于为寿命周期费用的数据采集提供一般性指导方法。  相似文献   
138.
装备维修宏观调控指标体系研究   总被引:3,自引:0,他引:3  
在对大量历史数据的统计分析基础上 ,科学确定了全军装备维修宏观管理所需的调控指标 ,并建立了计量经济学模型和回归模型 ,为装备维修宏观调控提供了基本依据。  相似文献   
139.
在装备再制造周期及再制造费用基本概念的基础上,给出了再制造费用参数的相关内容,并阐述了工程估算法、专家判断估算法、参数估算法、类比估算法等4种装备再制造费用分析及预测估算的方法,构建了基于工程估算法的再制造费用分解结构,并对再制造费用分析流程进行了详细描述,可为形成正确的再制造设计方案提供费用决策依据。  相似文献   
140.
少数民族教育是我国教育的重要组成部分。发展少数民族教育,提高民族素质具有重要意义。本文从经济学中的效率与公平、供给与需求、成本与效益三个方面理论来分析我国的少数民族教育,从而更好地发展少数民族教育。  相似文献   
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号