首页 | 本学科首页   官方微博 | 高级检索  
文章检索
  按 检索   检索词:      
出版年份:   被引次数:   他引次数: 提示:输入*表示无穷大
  收费全文   354篇
  免费   77篇
  国内免费   6篇
  2021年   3篇
  2019年   12篇
  2018年   5篇
  2017年   16篇
  2016年   19篇
  2015年   18篇
  2014年   23篇
  2013年   73篇
  2012年   17篇
  2011年   25篇
  2010年   24篇
  2009年   26篇
  2008年   24篇
  2007年   33篇
  2006年   21篇
  2005年   17篇
  2004年   19篇
  2003年   12篇
  2002年   16篇
  2001年   14篇
  2000年   14篇
  1999年   3篇
  1998年   2篇
  1996年   1篇
排序方式: 共有437条查询结果,搜索用时 15 毫秒
101.
Measuring the relative importance of components in a mechanical system is useful for various purposes. In this article, we study Birnbaum and Barlow‐Proschan importance measures for two frequently studied system designs: linear consecutive k ‐out‐of‐ n and m ‐consecutive‐ k ‐out‐of‐ n systems. We obtain explicit expressions for the component importance measures for systems consisting of exchangeable components. We illustrate the results for a system whose components have a Lomax type lifetime distribution. © 2013 Wiley Periodicals, Inc. Naval Research Logistics, 2013  相似文献   
102.
Demand forecasting performance is subject to the uncertainty underlying the time series an organization is dealing with. There are many approaches that may be used to reduce uncertainty and thus to improve forecasting performance. One intuitively appealing such approach is to aggregate demand in lower‐frequency “time buckets.” The approach under concern is termed to as temporal aggregation, and in this article, we investigate its impact on forecasting performance. We assume that the nonaggregated demand follows either a moving average process of order one or a first‐order autoregressive process and a single exponential smoothing (SES) procedure is used to forecast demand. These demand processes are often encountered in practice and SES is one of the standard estimators used in industry. Theoretical mean‐squared error expressions are derived for the aggregated and nonaggregated demand to contrast the relevant forecasting performances. The theoretical analysis is supported by an extensive numerical investigation and experimentation with an empirical dataset. The results indicate that performance improvements achieved through the aggregation approach are a function of the aggregation level, the smoothing constant, and the process parameters. Valuable insights are offered to practitioners and the article closes with an agenda for further research in this area. © 2013 Wiley Periodicals, Inc. Naval Research Logistics 60: 479–498, 2013  相似文献   
103.
When customers buy a product, they are often eligible for free repairs for a certain warranty period. In this article, we study some important aspects, which are often overlooked in the literature but are of interest to the manufacturer, in estimating both warranty and post‐warranty repair demands. We consider that the installed base of the product (i.e., the number of units of the product actually in use) varies with time due to both new sales and units being taken out of service. When estimating warranty and post‐warranty repair demands, we explicitly address the fact that customers may not always request repairs for failed units. For the case where the product failure time distribution is exponential, we derive the closed‐form expressions for both types of repair demands of a single unit and of the time‐varying installed base. The insights into some risk‐related quantities are also presented. Furthermore, the proposed model is extended by considering delayed warranty claims that are frequently seen in practice. Numerical examples illustrate that understanding both types of repair demands and the related decision variables is important for managing the obligatory and profitable repair services. © 2013 Wiley Periodicals, Inc. Naval Research Logistics 60: 499–511, 2013  相似文献   
104.
By running life tests at higher stress levels than normal operating conditions, accelerated life testing (ALT) quickly yields information on the lifetime distribution of a test unit. The lifetime at the design stress is then estimated through extrapolation using a regression model. In constant‐stress testing, a unit is tested at a fixed stress level until failure or the termination time point of test, whereas step‐stress testing allows the experimenter to gradually increase the stress levels at some prefixed time points during the test. In this work, the optimal k‐level constant‐stress and step‐stress ALTs are compared for the exponential failure data under complete sampling and Type‐I censoring. The objective is to quantify the advantage of using the step‐stress testing relative to the constant‐stress one. Assuming a log‐linear life–stress relationship with the cumulative exposure model for the effect of changing stress in step‐stress testing, the optimal design points are determined under C/D/A‐optimality criteria. The efficiency of step‐stress testing to constant‐stress one is then discussed in terms of the ratio of optimal objective functions based on the information matrix. © 2013 Wiley Periodicals, Inc. Naval Research Logistics 00: 000–000, 2013  相似文献   
105.
We consider the single server Markovian queue subject to Poisson generated catastrophes. Whenever a catastrophe occurs, all customers are forced to abandon the system, the server is rendered inoperative and an exponential repair time is set on. During the repair time new arrivals are allowed to join the system. We assume that the arriving customers decide whether to join the system or balk, based on a natural linear reward‐cost structure with two types of rewards: A (usual) service reward for those customers that receive service and a (compensation) failure reward for those customers that are forced to abandon the system due to a catastrophe. We study the strategic behavior of the customers regarding balking and derive the corresponding (Nash) equilibrium strategies for the observable and unobservable cases. We show that both types of strategic behavior may be optimal: to avoid the crowd or to follow it. The crucial factor that determines the type of customer behavior is the relative value of the service reward to the failure compensation. © 2013 Wiley Periodicals, Inc. Naval Research Logistics, 2013  相似文献   
106.
在对备件需求时间序列研究的基础上,结合指数平滑法和Croston法的特点,分析了指数平滑法与两步法的原理,通过对指数平滑法和两步法方差的研究,得到两步法是指数平滑法的一般形式的结论,为两步法的进一步研究提供一定的理论支撑。  相似文献   
107.
We consider a two‐echelon inventory system with a manufacturer operating from a warehouse supplying multiple distribution centers (DCs) that satisfy the demand originating from multiple sources. The manufacturer has a finite production capacity and production times are stochastic. Demand from each source follows an independent Poisson process. We assume that the transportation times between the warehouse and DCs may be positive which may require keeping inventory at both the warehouse and DCs. Inventory in both echelons is managed using the base‐stock policy. Each demand source can procure the product from one or more DCs, each incurring a different fulfilment cost. The objective is to determine the optimal base‐stock levels at the warehouse and DCs as well as the assignment of the demand sources to the DCs so that the sum of inventory holding, backlog, and transportation costs is minimized. We obtain a simple equation for finding the optimal base‐stock level at each DC and an upper bound for the optimal base‐stock level at the warehouse. We demonstrate several managerial insights including that the demand from each source is optimally fulfilled entirely from a single distribution center, and as the system's utilization approaches 1, the optimal base‐stock level increases in the transportation time at a rate equal to the demand rate arriving at the DC. © 2011 Wiley Periodicals, Inc. Naval Research Logistics, 2011  相似文献   
108.
In this article, we consider the performance evaluation of a multicomponent, multiproduct assemble‐to‐order (ATO) system. Each component is managed independently using a base‐stock policy at a supply facility with limited production capacity and an infinite buffer. The arrivals of demands follow a multivariate Poisson process and unfilled demands are backlogged. Because exact analysis of the proposed system is not feasible, we propose two approximation methods which provide upper and lower bounds for various performance measures such as fill rate, average waiting time, and average number of backorders of the proposed system. Our computational experiments demonstrate the effectiveness of the two approximation methods under various system settings. © 2011 Wiley Periodicals, Inc. Naval Research Logistics, 2011  相似文献   
109.
We introduce a multi‐period tree network maintenance scheduling model and investigate the effect of maintenance capacity restrictions on traffic/information flow interruptions. Network maintenance refers to activities that are performed to keep a network operational. For linear networks with uniform flow between every pair of nodes, we devise a polynomial‐time combinatorial algorithm that minimizes flow disruption. The spiral structure of the optimal maintenance schedule sheds insights into general network maintenance scheduling. The maintenance problem on linear networks with a general flow structure is strongly NP‐hard. We formulate this problem as a linear integer program, derive strong valid inequalities, and conduct a polyhedral study of the formulation. Polyhedral analysis shows that the relaxation of our linear network formulation is tight when capacities and flows are uniform. The linear network formulation is then extended to an integer program for solving the tree network maintenance scheduling problem. Preliminary computations indicate that the strengthened formulations can solve reasonably sized problems on tree networks and that the intuitions gained from the uniform flow case continue to hold in general settings. Finally, we extend the approach to directed networks and to maintenance of network nodes. © 2011 Wiley Periodicals, Inc. Naval Research Logistics, 2011  相似文献   
110.
This study addresses cyclic scheduling in robotic flowshops with bounded work‐in‐process (WIP) levels. The objective is to minimize the cycle time or, equivalently, to maximize the throughput, under the condition that the WIP level is bounded from above by a given integer number. We present several strongly polynomial algorithms for the 2‐cyclic robotic flowshop scheduling problems for various WIP levels. © 2010 Wiley Periodicals, Inc. Naval Research Logistics 58: 1–16, 2011  相似文献   
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号