首页 | 本学科首页   官方微博 | 高级检索  
文章检索
  按 检索   检索词:      
出版年份:   被引次数:   他引次数: 提示:输入*表示无穷大
  收费全文   354篇
  免费   77篇
  国内免费   6篇
  2021年   3篇
  2019年   12篇
  2018年   5篇
  2017年   16篇
  2016年   19篇
  2015年   18篇
  2014年   23篇
  2013年   73篇
  2012年   17篇
  2011年   25篇
  2010年   24篇
  2009年   26篇
  2008年   24篇
  2007年   33篇
  2006年   21篇
  2005年   17篇
  2004年   19篇
  2003年   12篇
  2002年   16篇
  2001年   14篇
  2000年   14篇
  1999年   3篇
  1998年   2篇
  1996年   1篇
排序方式: 共有437条查询结果,搜索用时 31 毫秒
51.
In scheduling problems with two competing agents, each one of the agents has his own set of jobs to be processed and his own objective function, and both share a common processor. In the single‐machine problem studied in this article, the goal is to find a joint schedule that minimizes the total deviation of the job completion times of the first agent from a common due‐date, subject to an upper bound on the maximum deviation of job completion times of the second agent. The problem is shown to be NP‐hard even for a nonrestrictive due‐date, and a pseudopolynomial dynamic program is introduced and tested numerically. For the case of a restrictive due‐date (a sufficiently small due‐date that may restrict the number of early jobs), a faster pseudopolynomial dynamic program is presented. We also study the multiagent case, which is proved to be strongly NP‐hard. A simple heuristic for this case is introduced, which is tested numerically against a lower bound, obtained by extending the dynamic programming algorithm. © 2013 Wiley Periodicals, Inc. Naval Research Logistics 61: 1–16, 2014  相似文献   
52.
This article presents two meta‐ranking models that minimize or nearly minimize violations of past game results while predicting future game winners as well as or better than leading current systems—a combination never before offered for college football. Key to both is the development and integration of a highly predictive ensemble probability model generated from the analysis of 36 existing college football ranking systems. This ensemble model is used to determine a target ranking that is used in two versions of a hierarchical multiobjective mixed binary integer linear program (MOMBILP). When compared to 75 other systems out‐of‐sample, one MOMBILP was the leading predictive system while getting within 0.64% of the retrodictive optimum; the other MOMBILP minimized violations while achieving a prediction total that was 2.55% lower than the best mark. For bowls, prediction sums were not statistically significantly different from the leading value, while achieving optimum or near‐optimum violation counts. This performance points to these models as potential means of reconciling the contrasting perspectives of predictiveness versus the matching of past performance when it comes to ranking fairness in college football. © 2013 Wiley Periodicals, Inc. Naval Research Logistics 61: 17–33, 2014  相似文献   
53.
Service systems such as call centers and hospital emergency rooms typically have strongly time‐varying arrival rates. Thus, a nonhomogeneous Poisson process (NHPP) is a natural model for the arrival process in a queueing model for performance analysis. Nevertheless, it is important to perform statistical tests with service system data to confirm that an NHPP is actually appropriate, as emphasized by Brown et al. [8]. They suggested a specific statistical test based on the Kolmogorov–Smirnov (KS) statistic after exploiting the conditional‐uniform (CU) property to transform the NHPP into a sequence of i.i.d. random variables uniformly distributed on [0,1] and then performing a logarithmic transformation of the data. We investigate why it is important to perform the final data transformation and consider what form it should take. We conduct extensive simulation experiments to study the power of these alternative statistical tests. We conclude that the general approach of Brown et al. [8] is excellent, but that an alternative data transformation proposed by Lewis [22], drawing upon Durbin [10], produces a test of an NHPP test with consistently greater power. We also conclude that the KS test after the CU transformation, without any additional data transformation, tends to be best to test against alternative hypotheses that primarily differ from an NHPP only through stochastic and time dependence. © 2014 Wiley Periodicals, Inc. Naval Research Logistics 61: 66–90, 2014  相似文献   
54.
We develop the first approximation algorithm with worst‐case performance guarantee for capacitated stochastic periodic‐review inventory systems with setup costs. The structure of the optimal control policy for such systems is extremely complicated, and indeed, only some partial characterization is available. Thus, finding provably near‐optimal control policies has been an open challenge. In this article, we construct computationally efficient approximate optimal policies for these systems whose demands can be nonstationary and/or correlated over time, and show that these policies have a worst‐case performance guarantee of 4. We demonstrate through extensive numerical studies that the policies empirically perform well, and they are significantly better than the theoretical worst‐case guarantees. We also extend the analyses and results to the case with batch ordering constraints, where the order size has to be an integer multiple of a base load. © 2014 Wiley Periodicals, Inc. Naval Research Logistics 61: 304–319, 2014  相似文献   
55.
We consider the problem of scheduling a set of jobs on a single machine subject to random breakdowns. We focus on the preemptive‐repeat model, which addresses the situation where, if a machine breaks down during the processing of a job, the work done on the job prior to the breakdown is lost and the job will have to be started from the beginning again when the machine resumes its work. We allow that (i) the uptimes and downtimes of the machine follow general probability distributions, (ii) the breakdown process of the machine depends upon the job being processed, (iii) the processing times of the jobs are random variables following arbitrary distributions, and (iv) after a breakdown, the processing time of a job may either remain a same but unknown amount, or be resampled according to its probability distribution. We first derive the optimal policy for a class of problems under the criterion to maximize the expected discounted reward earned from completing all jobs. The result is then applied to further obtain the optimal policies for other due date‐related criteria. We also discuss a method to compute the moments and probability distributions of job completion times by using their Laplace transforms, which can convert a general stochastic scheduling problem to its deterministic equivalent. The weighted squared flowtime problem and the maintenance checkup and repair problem are analyzed as applications. © 2004 Wiley Periodicals, Inc. Naval Research Logistics, 2004  相似文献   
56.
There is a finite cyclic graph. The hider chooses one of all nodes except the specified one, and he hides an (immobile) object there. At the beginning the seeker is at the specified node. After the seeker chooses an ordering of the nodes except the specified one, he examines each nodes in that order until he finds the object, traveling along edges. It costs an amount when he moves from a node to an adjacent one and also when he checks a node. While the hider wishes to maximize the sum of the traveling costs and the examination costs which are required to find the object, the seeker wishes to minimize it. The problem is modeled as a two‐person zero‐sum game. We solve the game when unit costs (traveling cost + examination cost) have geometrical relations depending on nodes. Then we give properties of optimal strategies of both players. © 2004 Wiley Periodicals, Inc. Naval Research Logistics, 2004.  相似文献   
57.
Products with short life cycles are becoming increasingly common in many industries, such as the personal computer (PC) and mobile phone industries. Traditional forecasting methods and inventory policies can be inappropriate for forecasting demand and managing inventory for a product with a short life cycle because they usually do not take into account the characteristics of the product life cycle. This can result in inaccurate forecasts, high inventory cost, and low service levels. Besides, many forecasting methods require a significant demand history, which is available only after the product has been sold for some time. In this paper, we present an adaptive forecasting algorithm with two characteristics. First, it uses structural knowledge on the product life cycle to model the demand. Second, it combines knowledge on the demand that is available prior to the launch of the product with actual demand data that become available after the introduction of the product to generate and update demand forecasts. Based on the forecasting algorithm, we develop an optimal inventory policy. Since the optimal inventory policy is computationally expensive, we propose three heuristics and show in a numerical study that one of the heuristics generates near‐optimal solutions. The evaluation of our approach is based on demand data from a leading PC manufacturer in the United States, where the forecasting algorithm has been implemented. © 2004 Wiley Periodicals, Inc. Naval Research Logistics, 2004.  相似文献   
58.
We consider the problem of scheduling customer orders in a flow shop with the objective of minimizing the sum of tardiness, earliness (finished goods inventory holding), and intermediate (work‐in‐process) inventory holding costs. We formulate this problem as an integer program, and based on approximate solutions to two different, but closely related, Dantzig‐Wolfe reformulations, we develop heuristics to minimize the total cost. We exploit the duality between Dantzig‐Wolfe reformulation and Lagrangian relaxation to enhance our heuristics. This combined approach enables us to develop two different lower bounds on the optimal integer solution, together with intuitive approaches for obtaining near‐optimal feasible integer solutions. To the best of our knowledge, this is the first paper that applies column generation to a scheduling problem with different types of strongly ????‐hard pricing problems which are solved heuristically. The computational study demonstrates that our algorithms have a significant speed advantage over alternate methods, yield good lower bounds, and generate near‐optimal feasible integer solutions for problem instances with many machines and a realistically large number of jobs. © 2004 Wiley Periodicals, Inc. Naval Research Logistics, 2004.  相似文献   
59.
An age‐dependent repair model is proposed. The notion of the “calendar age” of the product and the degree of repair are used to define the virtual age of the product. The virtual failure rate function and the virtual hazard function related to the lifetime of the product are discussed. Under a nonhomogeneous Poisson process scenario the expected warranty costs for repairable products associated with linear pro‐rata, nonrenewing free replacement and renewing free replacement warranties are evaluated. Illustration of the results is given by numerical and graphical examples. © 2004 Wiley Periodicals, Inc. Naval Research Logistics, 2004.  相似文献   
60.
Extending Sastry's result on the uncapacitated two‐commodity network design problem, we completely characterize the optimal solution of the uncapacitated K‐commodity network design problem with zero flow costs for the case when K = 3. By solving a set of shortest‐path problems on related graphs, we show that the optimal solutions can be found in O(n3) time when K = 3, where n is the number of nodes in the network. The algorithm depends on identifying a list of “basic patterns”; the number of basic patterns grows exponentially with K. We also show that the uncapacitated K‐commodity network design problem can be solved in O(n3) time for general K if K is fixed; otherwise, the time for solving the problem is exponential. © 2004 Wiley Periodicals, Inc. Naval Research Logistics, 2004  相似文献   
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号