首页 | 本学科首页   官方微博 | 高级检索  
文章检索
  按 检索   检索词:      
出版年份:   被引次数:   他引次数: 提示:输入*表示无穷大
  收费全文   269篇
  免费   32篇
  国内免费   2篇
  2023年   1篇
  2021年   3篇
  2020年   7篇
  2019年   6篇
  2018年   7篇
  2017年   12篇
  2016年   12篇
  2015年   7篇
  2014年   28篇
  2013年   23篇
  2012年   15篇
  2011年   36篇
  2010年   20篇
  2009年   23篇
  2008年   15篇
  2007年   13篇
  2006年   16篇
  2005年   15篇
  2004年   11篇
  2003年   11篇
  2002年   6篇
  2001年   1篇
  2000年   4篇
  1999年   3篇
  1998年   2篇
  1997年   2篇
  1992年   1篇
  1990年   3篇
排序方式: 共有303条查询结果,搜索用时 15 毫秒
61.
The combination of uncertain demand and lead times for installing capacity creates the risk of shortage during the lead time, which may have serious consequences for a service provider. This paper analyzes a model of capacity expansion with autocorrelated random demand and a fixed lead time for adding capacity. To provide a specified level of service, a discrete time expansion timing policy uses a forecast error‐adjusted minimum threshold level of excess capacity position to trigger an expansion. Under this timing policy, the expansion cost can be minimized by solving a deterministic dynamic program. We study the effects of demand characteristics and the lead time length on the capacity threshold. Autocorrelation acts similarly to randomness in hastening expansions but has a smaller impact, especially when lead times are short. However, the failure either to recognize autocorrelation or to accurately estimate its extent can cause substantial policy errors. © 2003 Wiley Periodicals, Inc. Naval Research Logistics, 2003  相似文献   
62.
微分对策界栅理论在舰艇作战能力评估中的应用   总被引:1,自引:0,他引:1  
作战能力是表征战斗舰艇战术技术性能的一项重要指标,如何正确评价舰艇的作战能力一直是军事运筹研究的热点.利用定性微分对策的界栅理论研究了一类作战问题,通过构造捕获区面积和咽喉区域面积,并以此作为动态评估舰艇作战能力的衡量指标.研究结果可为综合评价舰艇作战能力提供一条新途径.  相似文献   
63.
对新疆构建天山北坡城市带的设想   总被引:1,自引:0,他引:1  
新世纪,新疆为推动经济的发展,提出了大力发展天山北坡经济带的战略。而经济带的发展必须以城市带为载体,二者是相辅相成关系,文中从构建城市带的意义入手,对城市带建立中存在问题以及思路作了阐述。  相似文献   
64.
阐明了潜艇承载力图谱的一种新算法,分析了危险舵卡的基本挽回方法及其衡准,论述了当前水下动力抗沉的实用方法及评价指标.  相似文献   
65.
高层公寓的火灾特点不同于普通的高层住宅,其火灾危险性高于普通住宅。分析了高层公寓的火灾特点,并从消防车作业面、安全疏散、防火分隔、防排烟、灭火设施、内装修等方面提出了高层公寓防火设计应注意的问题。  相似文献   
66.
消防部队抢险救援战斗力评估   总被引:1,自引:0,他引:1  
以消防部队参与抢险救援战斗实例引出消防抢险救援战斗力的评估问题,并对评估的意义从组织指挥、消防员的安全、特勤队伍的发展角度进行了论述,重点剖析了影响战斗力评估的人员、装备、自然、组织等因素,对评估的组织从专家组成和制度建设两个方面提出了具体的建议。  相似文献   
67.
本文利用四种时间序列模型,即自回归模型、组合模型、疏系数自回归模型、门限自回归模型,分别对时间序列分析中一组有名数据,即加拿大山猫数据,进行模型拟合,并对得到的四个模型及预报结果进行了分析和比较。  相似文献   
68.
An important aspect of supply chain management is dealing with demand and supply uncertainty. The uncertainty of future supply can be reduced if a company is able to obtain advance capacity information (ACI) about future supply/production capacity availability from its supplier. We address a periodic‐review inventory system under stochastic demand and stochastic limited supply, for which ACI is available. We show that the optimal ordering policy is a state‐dependent base‐stock policy characterized by a base‐stock level that is a function of ACI. We establish a link with inventory models that use advance demand information (ADI) by developing a capacitated inventory system with ADI, and we show that equivalence can only be set under a very specific and restrictive assumption, implying that ADI insights will not necessarily hold in the ACI environment. Our numerical results reveal several managerial insights. In particular, we show that ACI is most beneficial when there is sufficient flexibility to react to anticipated demand and supply capacity mismatches. Further, most of the benefits can be achieved with only limited future visibility. We also show that the system parameters affecting the value of ACI interact in a complex way and therefore need to be considered in an integrated manner. © 2011 Wiley Periodicals, Inc. Naval Research Logistics, 2011  相似文献   
69.
We present a tactical decision model for order acceptance and capacity planning that maximizes the expected profits from accepted orders, allowing for aggregate regular as well as nonregular capacity. The stream of incoming order arrivals is the main source of uncertainty in dynamic order acceptance and the company only has forecasts of the main properties of the future incoming projects. Project proposals arrive sequentially with deterministic interarrival times and a decision on order acceptance and capacity planning needs to be made each time a proposal arrives and its project characteristics are revealed. We apply stochastic dynamic programming to determine a profit threshold for the accept/reject decision as well as to deterministically allocate a single bottleneck resource to the accepted projects, both with an eye on maximizing the expected revenues within the problem horizon. We derive a number of managerial insights based on an analysis of the influence of project and environmental characteristics on optimal project selection and aggregate capacity usage. © 2007 Wiley Periodicals, Inc. Naval Research Logistics, 2007  相似文献   
70.
We study the problem of capacity exchange between two firms in anticipation of the mismatch between demand and capacity, and its impact on firm's capacity investment decisions. For given capacity investment levels of the two firms, we demonstrate how capacity price may be determined and how much capacity should be exchanged when either manufacturer acts as a Stackelberg leader in the capacity exchange game. By benchmarking against the centralized system, we show that a side payment may be used to coordinate the capacity exchange decisions. We then study the firms' capacity investment decisions using a biform game framework in which capacity investment decisions are made individually and exchange decisions are made as in a centralized system. We demonstrate the existence and uniqueness of the Nash equilibrium capacity investment levels and study the impact of firms' share of the capacity exchange surplus on their capacity investment levels.© 2007 Wiley Periodicals, Inc. Naval Research Logistics, 2007  相似文献   
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号