排序方式: 共有188条查询结果,搜索用时 31 毫秒
101.
We consider a simple two‐stage supply chain with a single retailer facing i.i.d. demand and a single manufacturer with finite production capacity. We analyze the value of information sharing between the retailer and the manufacturer over a finite time horizon. In our model, the manufacturer receives demand information from the retailer even during time periods in which the retailer does not order. To analyze the impact of information sharing, we consider the following three strategies: (1) the retailer does not share demand information with the manufacturer; (2) the retailer does share demand information with the manufacturer and the manufacturer uses the optimal policy to schedule production; (3) the retailer shares demand information with the manufacturer and the manufacturer uses a greedy policy to schedule production. These strategies allow us to study the impact of information sharing on the manufacturer as a function of the production capacity, and the frequency and timing in which demand information is shared. © 2003 Wiley Periodicals, Inc. Naval Research Logistics, 2003 相似文献
102.
通过对不同功率白炽灯引燃100%棉质材料的研究,分析了白炽灯引燃棉质材料引发火灾的危险性。利用半导体点温计分别对不同功率白炽灯表面及棉布的温度进行记录,根据温度随时间的变化情况、可燃物被引燃情况,分析了不同功率白炽灯对棉布的引燃性能。 相似文献
103.
李文华 《兵团教育学院学报》2009,19(1):67-70
随着高等教育的大众化,社会对会计人才需求呈现出多层次的特点,现代会计教育已进入素质教育的新阶段。注重学生创造性思维的培养,注重学生能力与素质的提高应成为各高校今后会计教学改革的方向。本文从科学发展观的视角,在分析了会计本科教学现状的基础上,理性地提出了要实现会计教学培养目标,必须转变教育观念,适应科学发展观的要求,推动会计教学改革。 相似文献
104.
依据舵减摇状态空间模型,推导舵减横摇广义预测控制律,在舵角舵速约束的条件下,采用二次型规划计算控制量进行减横摇控制.对某一船舶在典型航行工况下进行了系统仿真,仿真结果表明,该方法不但可取得35%~45%的减摇效果,而且对横摇角速度与横摇角加速度也有40%左右的减小效果. 相似文献
105.
106.
为了更合理地制定导弹的战术指标和作战任务规划,对多脉冲导弹可达域进行研究。通过引入加权的纵程和横程的组合性能指标函数,将可达域的优化问题转化为最优控制问题,建立以飞行攻角和侧滑角为双优化设计变量的多阶段多约束优化模型,采用hp自适应伪谱法对其进行求解,并着重分析多脉冲导弹发动机参数和终端约束条件对导弹可达域的影响。仿真结果表明,hp自适应伪谱法能有效解决多阶段多约束的多脉冲导弹可达域优化问题,且多脉冲导弹脉冲发动机时间间隔越小,推力比越大,装药比越小,导弹的可达域越大,相比于终端速度对可达域的影响,终端弹道倾角对可达区域的影响较小。 相似文献
107.
数字化部队作战能力评估指标体系构建 总被引:3,自引:0,他引:3
探讨了数字化部队作战能力评估的指导思想和原则,从现代战争系统模型分解图的指标构建思想出发,以系统科学与工程理论为指导,构建数字化部队战争系统模型分解图,将现代战争系统分解成部队与武器子系统、电子信息子系统、指挥决策子系统和综合保障子系统,并分别对各子系统的能力指标内涵进行了详细解释,用信息系统描述了各指标体系的能力构成。 相似文献
108.
To meet customer demand, delivery companies are offering an increasing number of time‐definite services. In this article, we examine the strategic design of delivery networks which can efficiently provide these services. Because of the high cost of direct connections, we focus on tree‐structured networks. As it may not be possible to identify a tree‐structured network that satisfies all of the delivery guarantees, we allow these guarantees to be violated but seek to minimize the sum of the violations. We establish the complexity of the problem and exploit an empirically identified solution structure to create new neighborhoods which improve solution values over more general neighborhood structures. © 2008 Wiley Periodicals, Inc. Naval Research Logistics, 2008 相似文献
109.
We consider a supply chain in which a retailer faces a stochastic demand, incurs backorder and inventory holding costs and uses a periodic review system to place orders from a manufacturer. The manufacturer must fill the entire order. The manufacturer incurs costs of overtime and undertime if the order deviates from the planned production capacity. We determine the optimal capacity for the manufacturer in case there is no coordination with the retailer as well as in case there is full coordination with the retailer. When there is no coordination the optimal capacity for the manufacturer is found by solving a newsvendor problem. When there is coordination, we present a dynamic programming formulation and establish that the optimal ordering policy for the retailer is characterized by two parameters. The optimal coordinated capacity for the manufacturer can then be obtained by solving a nonlinear programming problem. We present an efficient exact algorithm and a heuristic algorithm for computing the manufacturer's capacity. We discuss the impact of coordination on the supply chain cost as well as on the manufacturer's capacity. We also identify the situations in which coordination is most beneficial. © 2008 Wiley Periodicals, Inc. Naval Research Logistics, 2008 相似文献
110.
We develop a risk‐sensitive strategic facility sizing model that makes use of readily obtainable data and addresses both capacity and responsiveness considerations. We focus on facilities whose original size cannot be adjusted over time and limits the total production equipment they can hold, which is added sequentially during a finite planning horizon. The model is parsimonious by design for compatibility with the nature of available data during early planning stages. We model demand via a univariate random variable with arbitrary forecast profiles for equipment expansion, and assume the supporting equipment additions are continuous and decided ex‐post. Under constant absolute risk aversion, operating profits are the closed‐form solution to a nontrivial linear program, thus characterizing the sizing decision via a single first‐order condition. This solution has several desired features, including the optimal facility size being eventually decreasing in forecast uncertainty and decreasing in risk aversion, as well as being generally robust to demand forecast uncertainty and cost errors. We provide structural results and show that ignoring risk considerations can lead to poor facility sizing decisions that deteriorate with increased forecast uncertainty. Existing models ignore risk considerations and assume the facility size can be adjusted over time, effectively shortening the planning horizon. Our main contribution is in addressing the problem that arises when that assumption is relaxed and, as a result, risk sensitivity and the challenges introduced by longer planning horizons and higher uncertainty must be considered. Finally, we derive accurate spreadsheet‐implementable approximations to the optimal solution, which make this model a practical capacity planning tool.© 2008 Wiley Periodicals, Inc. Naval Research Logistics, 2008 相似文献