全文获取类型
收费全文 | 832篇 |
免费 | 194篇 |
国内免费 | 109篇 |
出版年
2024年 | 2篇 |
2023年 | 3篇 |
2022年 | 10篇 |
2021年 | 6篇 |
2020年 | 16篇 |
2019年 | 13篇 |
2018年 | 2篇 |
2017年 | 42篇 |
2016年 | 51篇 |
2015年 | 41篇 |
2014年 | 45篇 |
2013年 | 47篇 |
2012年 | 75篇 |
2011年 | 67篇 |
2010年 | 49篇 |
2009年 | 97篇 |
2008年 | 62篇 |
2007年 | 71篇 |
2006年 | 83篇 |
2005年 | 65篇 |
2004年 | 57篇 |
2003年 | 42篇 |
2002年 | 27篇 |
2001年 | 23篇 |
2000年 | 19篇 |
1999年 | 12篇 |
1998年 | 18篇 |
1997年 | 16篇 |
1996年 | 12篇 |
1995年 | 9篇 |
1994年 | 7篇 |
1993年 | 9篇 |
1992年 | 7篇 |
1991年 | 12篇 |
1990年 | 14篇 |
1989年 | 2篇 |
1988年 | 2篇 |
排序方式: 共有1135条查询结果,搜索用时 31 毫秒
41.
42.
43.
44.
45.
Extended warranties provide “piece of mind” to a consumer in that product failures which occur after the base warranty expires are rectified at little or no cost. They also provide an additional source of revenue for manufacturers or third‐party providers, such as retailers or insurance providers, and help cultivate consumer loyalty. In this article, we analyze a number of extended warranty contracts which differ in design, including restrictions on deferrals and renewals. With the use of dynamic programming, we compute the optimal strategy for a consumer with perfect information and determine the optimal pricing policy for the provider given the consumer's risk characterization. We also provide insight into when different contracts should be issued. Finally, we illustrate how profits can be dramatically increased by offering menus of warranty contracts, as opposed to stand alone contracts, with the use of integer programming. Surprisingly, risk‐taking consumers provide the greatest benefit to offering menus. These insights can help a company develop a comprehensive warranty planning strategy for given products or product lines. © 2009 Wiley Periodicals, Inc. Naval Research Logistics 2009 相似文献
46.
47.
48.
The “gold‐mining” decision problem is concerned with the efficient utilization of a delicate mining equipment working in a number of different mines. Richard Bellman was the first to consider this type of a problem. The solution found by Bellman for the finite‐horizon, continuous‐time version of the problem with two mines is not overly realistic since he assumed that fractional parts of the same mining equipment could be used in different mines and this fraction could change instantaneously. In this paper, we provide some extensions to this model in order to produce more operational and realistic solutions. Our first model is concerned with developing an operational policy where the equipment may be switched from one mine to the other at most once during a finite horizon. In the next extension we incorporate a cost component in the objective function and assume that the horizon length is not fixed but it is the second decision variable. Structural properties of the optimal solutions are obtained using nonlinear programming. Each model and its solution is illustrated with a numerical example. The models developed here may have potential applications in other areas including production of items requiring the same machine or choosing a sequence of activities requiring the same resource. © 2002 Wiley Periodicals, Inc. Naval Research Logistics 49: 186–203, 2002; DOI 10.1002/nav.10008 相似文献
49.
50.
舰船主动力装置系统可靠性的模糊分配 总被引:3,自引:1,他引:2
利用模糊数学理论中的综合评判方法 ,综合考虑多方面的模糊因素 ,对舰船主动力装置系统进行可靠性分配 .这种方法概念清楚、思路清晰 ,为舰船主动力装置初步设计阶段系统可靠性分配的较好方法 相似文献