全文获取类型
收费全文 | 295篇 |
免费 | 219篇 |
国内免费 | 17篇 |
专业分类
531篇 |
出版年
2023年 | 4篇 |
2022年 | 2篇 |
2021年 | 6篇 |
2020年 | 9篇 |
2019年 | 3篇 |
2018年 | 6篇 |
2017年 | 17篇 |
2016年 | 18篇 |
2015年 | 20篇 |
2014年 | 21篇 |
2013年 | 32篇 |
2012年 | 26篇 |
2011年 | 24篇 |
2010年 | 12篇 |
2009年 | 17篇 |
2008年 | 14篇 |
2007年 | 13篇 |
2006年 | 22篇 |
2005年 | 31篇 |
2004年 | 17篇 |
2003年 | 7篇 |
2002年 | 13篇 |
2001年 | 11篇 |
2000年 | 17篇 |
1999年 | 10篇 |
1998年 | 14篇 |
1997年 | 1篇 |
1995年 | 62篇 |
1994年 | 80篇 |
1991年 | 1篇 |
1990年 | 1篇 |
排序方式: 共有531条查询结果,搜索用时 0 毫秒
31.
Sunkyo Kim 《海军后勤学研究》2005,52(5):399-408
In this paper, we present the heavy‐traffic bottleneck phenomenon under multiclass deterministic routing and discuss how it can be addressed by decomposition approximation. Examples show that Bitran and Tirupati's method and Whitt's enhancements for deterministic routing may not properly account for this phenomenon. We propose refinements to these methods based on Whitt's variability functions. Results of numerical experiments on simple networks and semiconductor manufacturing process show significant improvement in the approximation of expected waiting time at bottleneck stations. © 2005 Wiley Periodicals, Inc. Naval Research Logistics, 2005. 相似文献
32.
The coordination of production, supply, and distribution is an important issue in logistics and operations management. This paper develops and analyzes a single‐machine scheduling model that incorporates the scheduling of jobs and the pickup and delivery arrangements of the materials and finished jobs. In this model, there is a capacitated pickup and delivery vehicle that travels between the machine and the storage area, and the objective is to minimize the makespan of the schedule. The problem is strongly NP‐hard in general but is solvable in polynomial time when the job processing sequence is predetermined. An efficient heuristic is developed for the general problem. The effectiveness of the heuristic is studied both analytically and computationally. © 2005 Wiley Periodicals, Inc. Naval Research Logistics, 2005. 相似文献
33.
李文伟 《兵团教育学院学报》2006,16(1):27-29
农膜的应用对农业发展做出了不可估量的贡献,但是,长期过量使用化肥、农药和塑料农膜将导致土壤板结,地力下降,水体污染和负营养化,破坏自然生态系统的结构和功能。如何合理使用塑料农膜,确保农业生产可持续发展,是摆在每一位环境保护工作者面前的重要课题。 相似文献
34.
基于蚁群算法的试验流程优化研究 总被引:2,自引:2,他引:2
水中兵器的海上试验涉及许多人员、兵力、被试产品、测量设备等,试验周期长、消耗大,因此如何缩短试验周期是亟待研究解决的问题.文中首先将试验流程优化问题转化为车间调度问题,建立了相应的数学模型,再应用蚁群算法转移规则得到中间结果并进行排队以对各种资源约束进行处理.最后将结果利用局部搜索算法优化后作为蚁群算法信息素更新的基础.实例计算结果表明,该方法优化效果良好. 相似文献
35.
C2组织结构设计:平台-任务关系设计 总被引:2,自引:0,他引:2
以联合作战战役为例建立作战平台和任务模型,对C2(Command and Control)组织结构设计中平台-任务关系设计问题分析了传统多维动态列表规划算法(Multidimensional Dynamic List Scheduling,MDLS)在解决作战平台资源调度(平台-任务分配)问题的不足,提出了在平台-任务分配过程中采用任务选择平台组、平台选择任务以及两者选择冲突消除改进的MDLS算法,以解决MDLS算法的不足,并对不同方法的结果进行了比较. 相似文献
36.
讨论作业具有线性加工时间,作业间具有链约束的两台处理机流水作业排序问题,目标函数为极小化完工时间。在作业加工时间简单线性恶化下,提出作业的非负开始和停止延迟恶化率,构造了满足约束条件的复合作业。在此基础上,给出作业间具有平行链约束的两台处理机流水作业排序问题的最优多项式算法。 相似文献
37.
Minoru Okamura † 《Defence and Peace Economics》2013,24(4):309-330
Probing the technology in the production of US national defence by using a dynamic cost‐function model with adjustment costs, this paper evaluates the effect of reducing the level of national defence on the defence budget saving. Our inquiry involves estimating the defence production structure without output data for non‐market goods that are normally unavailable. Our findings include: (i) the United States behaves rationally to minimize cost in the production of national defence; (ii) the adjustment costs are larger in disarmament than in military build‐up; (iii) due to the adjustment costs peculiar to disarmament, the defence budget saving from disarmament appears small, but cutbacks allow great savings on the defence budget. 相似文献
38.
This paper models the interactions between the defense needs of the USA and Western Europe, which produce several heterogeneous defense goods, and the defense industry market structure. The results show that net defense costs of the USA and Europe are lower when the number of defense firms in each arms‐producing country is small and when the world prices of the defense goods are high. The model predicts that the increase in world prices will crowd‐out countries in the developing world from the market for modern weapon systems and may force them to develop and use ‘cheap and dirty’ weapon systems. 相似文献
39.
40.
The client‐contractor bargaining problem addressed here is in the context of a multi‐mode resource constrained project scheduling problem with discounted cash flows, which is formulated as a progress payments model. In this model, the contractor receives payments from the client at predetermined regular time intervals. The last payment is paid at the first predetermined payment point right after project completion. The second payment model considered in this paper is the one with payments at activity completions. The project is represented on an Activity‐on‐Node (AON) project network. Activity durations are assumed to be deterministic. The project duration is bounded from above by a deadline imposed by the client, which constitutes a hard constraint. The bargaining objective is to maximize the bargaining objective function comprised of the objectives of both the client and the contractor. The bargaining objective function is expected to reflect the two‐party nature of the problem environment and seeks a compromise between the client and the contractor. The bargaining power concept is introduced into the problem by the bargaining power weights used in the bargaining objective function. Simulated annealing algorithm and genetic algorithm approaches are proposed as solution procedures. The proposed solution methods are tested with respect to solution quality and solution times. Sensitivity analyses are conducted among different parameters used in the model, namely the profit margin, the discount rate, and the bargaining power weights. © 2009 Wiley Periodicals, Inc. Naval Research Logistics, 2009 相似文献