首页 | 本学科首页   官方微博 | 高级检索  
文章检索
  按 检索   检索词:      
出版年份:   被引次数:   他引次数: 提示:输入*表示无穷大
  收费全文   127篇
  免费   16篇
  国内免费   21篇
  2022年   1篇
  2019年   4篇
  2018年   1篇
  2017年   6篇
  2016年   16篇
  2015年   3篇
  2014年   10篇
  2013年   6篇
  2012年   18篇
  2011年   11篇
  2010年   6篇
  2009年   12篇
  2008年   12篇
  2007年   11篇
  2006年   17篇
  2005年   6篇
  2004年   6篇
  2003年   3篇
  2002年   2篇
  2001年   2篇
  2000年   1篇
  1999年   1篇
  1998年   1篇
  1997年   3篇
  1996年   3篇
  1993年   1篇
  1992年   1篇
排序方式: 共有164条查询结果,搜索用时 15 毫秒
161.
In due‐window assignment problems, jobs completed within a designated time interval are regarded as being on time, whereas early and tardy jobs are penalized. The objective is to determine the location and size of the due‐window, as well as the job schedule. We address a common due‐window assignment problem on parallel identical machines with unit processing time jobs. We show that the number of candidate values for the optimal due‐window starting time and for the optimal due‐window completion time are bounded by 2. We also prove that the starting time of the first job on each of the machines is either 0 or 1, thus introducing a fairly simple, constant‐time solution for the problem. © 2004 Wiley Periodicals, Inc. Naval Research Logistics, 2004  相似文献   
162.
分析了影响防空C4ISR系统目标分配质量的主要因素,并以此定义了5个基本指标.利用线性加权法给出了一架歼击机对一架目标机的分配能力的计算方法,以此为基础提出了不同机场的多类歼击机对多批目标的分配能力的算法.最后通过实例计算验证了模型的正确性和实用性.  相似文献   
163.
Scheduling IT projects and assigning the project work to human resources are an important and common tasks in almost any IT service company. It is particularly complex because human resources usually have multiple skills. Up to now only little work has considered IT‐specific properties of the project structure and human resources. In this article, we present an optimization model that simultaneously schedules the activities of multiple IT projects with serial network structures and assigns the project work to multiskilled internal and external human resources with different efficiencies. The goal is to minimize costs. We introduce a metaheuristic that decomposes the problem into a binary scheduling problem and a continuous staffing problem where the latter is solved efficiently by exploiting its underlying network structure. For comparison, we solve the mixed–binary linear program with a state–of–the–art commercial solver. The impacts of problem parameters on computation time and solution gaps between the metaheuristic and the solver are assessed in an experimental study. Our results show that the metaheuristic provides very favorable results in considerable less time than the solver for midsize problems. For larger problems, it shows a similar performance while the solver fails to return feasible solutions. © 2012 Wiley Periodicals, Inc. Naval Research Logistics 59: 111–127, 2012  相似文献   
164.
常规的特征结构配置(EA)方法不能同时满足系统频域设计指标和鲁棒稳定性的要求,而H_∞鲁棒控制理论在设计控制器时,并没有考虑系统时域性能。为此,基于特征结构配置和H_∞鲁棒控制,设计一种直观的控制器。该控制器以特征结构配置作为内环控制器,以H_∞鲁棒控制器作为外环控制器,使闭环系统能同时获得较好的时域动态特性、鲁棒稳定性以及指令跟踪性能力。通过对某无人机横侧向飞行控制的仿真,进一步验证了该方法的有效性。  相似文献   
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号