排序方式: 共有139条查询结果,搜索用时 15 毫秒
11.
机械抖动激光陀螺捷联惯性导航系统中通常要对陀螺信号进行预滤波处理以消除抖动偏频,数据滤波后其幅值和相位的变化引入了附加的姿态算法误差.为了减小此误差,研究了抖动解调滤波器的特性以及数据滤波对系统姿态算法精度的影响,推导了与滤波器匹配的姿态算法优化公式.优化算法仅修正了传统算法系数,不增加算法实现难度.仿真和实验表明,优化算法能有效减小滤波器引入的附加姿态算法误差,明显改善算法精度,有很高的工程实用价值. 相似文献
12.
在等概率抽样群体的条件下,讨论了演化算法的隐合并行性,得到了算法每代隐含处理的模式长度不超过ls(0≤ls≤l)的不同模式期望数的精确表达,并估计了其上下界. 相似文献
13.
14.
进化规划算法中变异是唯一的操作,因此变异算子对进化规划算法的性能有决定性的影响。文中以高斯变异算子为例,研究了变异算子在进化进程的作用,分析了进化规划算法不收敛的原因以及变异算子与进化代数、收敛精度间的关系。对传统进化规划算法和多群进化规划算法的性能进行了仿真研究,仿真结果表明了分析结果的正确性。 相似文献
15.
在(1+1)EAs中,采用马尔可夫链推移时间分析法,推导出了平均首次命中时间的表达式。从理论上分析了变异概率对平均首次命中时间的影响。结果表明适当的变异概率会缩短平均首次命中时间,加快进化算法的寻优时间。 相似文献
16.
17.
We consider the problem of scheduling a set of n jobs on a single batch machine, where several jobs can be processed simultaneously. Each job j has a processing time pj and a size sj. All jobs are available for processing at time 0. The batch machine has a capacity D. Several jobs can be batched together and processed simultaneously, provided that the total size of the jobs in the batch does not exceed D. The processing time of a batch is the largest processing time among all jobs in the batch. There is a single vehicle available for delivery of the finished products to the customer, and the vehicle has capacity K. We assume that K = rD, where and r is an integer. The travel time of the vehicle is T; that is, T is the time from the manufacturer to the customer. Our goal is to find a schedule of the jobs and a delivery plan so that the service span is minimized, where the service span is the time that the last job is delivered to the customer. We show that if the jobs have identical sizes, then we can find a schedule and delivery plan in time such that the service span is minimum. If the jobs have identical processing times, then we can find a schedule and delivery plan in time such that the service span is asymptotically at most 11/9 times the optimal service span. When the jobs have arbitrary processing times and arbitrary sizes, then we can find a schedule and delivery plan in time such that the service span is asymptotically at most twice the optimal service span. We also derive upper bounds of the absolute worst‐case ratios in both cases. © 2015 Wiley Periodicals, Inc. Naval Research Logistics 62: 470–482, 2015 相似文献
18.
We develop the first approximation algorithm with worst‐case performance guarantee for capacitated stochastic periodic‐review inventory systems with setup costs. The structure of the optimal control policy for such systems is extremely complicated, and indeed, only some partial characterization is available. Thus, finding provably near‐optimal control policies has been an open challenge. In this article, we construct computationally efficient approximate optimal policies for these systems whose demands can be nonstationary and/or correlated over time, and show that these policies have a worst‐case performance guarantee of 4. We demonstrate through extensive numerical studies that the policies empirically perform well, and they are significantly better than the theoretical worst‐case guarantees. We also extend the analyses and results to the case with batch ordering constraints, where the order size has to be an integer multiple of a base load. © 2014 Wiley Periodicals, Inc. Naval Research Logistics 61: 304–319, 2014 相似文献
19.
基于小波变换和进化网络提出一种有效的常规雷达目标识别方法。即首先利用 Mallat算法对雷达目标一维距离像进行特征提取和压缩 ,然后在进化规划的基础上提出一种混合进化算法来优化设计由多层前向网络构成的分类器。实验结果表明 ,整个目标识别系统的结构简单 ,同时具有较好的推广能力 相似文献
20.
We consider a short‐term capacity allocation problem with tool and setup constraints that arises in the context of operational planning in a semiconductor wafer fabrication facility. The problem is that of allocating the available capacity of parallel nonidentical machines to available work‐in‐process (WIP) inventory of operations. Each machine can process a subset of the operations and a tool setup is required on a machine to change processing from one operation to another. Both the number of tools available for an operation and the number of setups that can be performed on a machine during a specified time horizon are limited. We formulate this problem as a degree‐constrained network flow problem on a bipartite graph, show that the problem is NP‐hard, and propose constant factor approximation algorithms. We also develop constructive heuristics and a greedy randomized adaptive search procedure for the problem. Our computational experiments demonstrate that our solution procedures solve the problem efficiently, rendering the use of our algorithms in real environment feasible. © 2005 Wiley Periodicals, Inc. Naval Research Logistics, 2005 相似文献