全文获取类型
收费全文 | 791篇 |
免费 | 221篇 |
国内免费 | 22篇 |
出版年
2023年 | 7篇 |
2022年 | 5篇 |
2021年 | 11篇 |
2020年 | 10篇 |
2019年 | 21篇 |
2018年 | 7篇 |
2017年 | 38篇 |
2016年 | 54篇 |
2015年 | 28篇 |
2014年 | 49篇 |
2013年 | 96篇 |
2012年 | 36篇 |
2011年 | 45篇 |
2010年 | 54篇 |
2009年 | 58篇 |
2008年 | 50篇 |
2007年 | 63篇 |
2006年 | 55篇 |
2005年 | 47篇 |
2004年 | 48篇 |
2003年 | 30篇 |
2002年 | 35篇 |
2001年 | 34篇 |
2000年 | 40篇 |
1999年 | 17篇 |
1998年 | 19篇 |
1997年 | 13篇 |
1996年 | 22篇 |
1995年 | 8篇 |
1994年 | 4篇 |
1993年 | 6篇 |
1992年 | 6篇 |
1991年 | 5篇 |
1990年 | 7篇 |
1989年 | 2篇 |
1988年 | 3篇 |
1987年 | 1篇 |
排序方式: 共有1034条查询结果,搜索用时 15 毫秒
151.
Allocation of scarce common components to finished product orders is central to the performance of assembly systems. Analysis of these systems is complex, however, when the product master schedule is subject to uncertainty. In this paper, we analyze the cost—service performance of a component inventory system with correlated finished product demands, where component allocation is based on a fair shares method. Such issuing policies are used commonly in practice. We quantify the impact of component stocking policies on finished product delays due to component shortages and on product order completion rates. These results are used to determine optimal base stock levels for components, subject to constraints on finished product service (order completion rates). Our methodology can help managers of assembly systems to (1) understand the impact of their inventory management decisions on customer service, (2) achieve cost reductions by optimizing their inventory investments, and (3) evaluate supplier performance and negotiate contracts by quantifying the effect of delivery lead times on costs and customer service. © 2001 John Wiley & Sons, Inc. Naval Research Logistics 48:409–429, 2001 相似文献
152.
采用数值模拟的方法对燃油喷射系统的工作过程作了简要的理论分析 .以典型的 135型柴油机燃油喷射系统为研究对象 ,在合理假设的基础上 ,建立了燃油喷射系统的数学模型 ,并应用特征线法和改进欧拉法 ,对其工作过程进行了初步的数值求解计算 ,模拟了燃油喷射系统部分常见故障时的工况 相似文献
153.
Fangruo Chen 《海军后勤学研究》2000,47(5):422-439
Consider a distribution system with a central warehouse and multiple retailers. Customer demand arrives at each of the retailers continuously at a constant rate. The retailers replenish their inventories from the warehouse which in turn orders from an outside supplier with unlimited stock. There are economies of scale in replenishing the inventories at both the warehouse and the retail level. Stockouts at the retailers are backlogged. The system incurs holding and backorder costs. The objective is to minimize the long‐run average total cost in the system. This paper studies the cost effectiveness of (R, Q) policies in the above system. Under an (R, Q) policy, each facility orders a fixed quantity Q from its supplier every time its inventory position reaches a reorder point R. It is shown that (R, Q) policies are at least 76% effective. Numerical examples are provided to further illustrate the cost effectiveness of (R, Q) policies. © 2000 John Wiley & Sons, Inc. Naval Research Logistics 47: 422–439, 2000 相似文献
154.
This paper develops and applies a nonparametric bootstrap methodology for setting inventory reorder points and a simple inequality for identifying existing reorder points that are unreasonably high. We demonstrate that an empirically based bootstrap method is both feasible and calculable for large inventories by applying it to the 1st Marine Expeditionary Force General Account, an inventory consisting of $20–30 million of stock for 10–20,000 different types of items. Further, we show that the bootstrap methodology works significantly better than the existing methodology based on mean days of supply. In fact, we demonstrate performance equivalent to the existing system with a reduced inventory at one‐half to one‐third the cost; conversely, we demonstrate significant improvement in fill rates and other inventory performance measures for an inventory of the same cost. © 2000 John Wiley & Sons, Inc. Naval Research Logistics 47: 459–478, 2000 相似文献
155.
The opportunistic maintenance of a k‐out‐of‐n:G system with imperfect preventive maintenance (PM) is studied in this paper, where partial failure is allowed. In many applications, the optimal maintenance actions for one component often depend on the states of the other components and system reliability requirements. Two new (τ, T) opportunistic maintenance models with the consideration of reliability requirements are proposed. In these two models, only minimal repairs are performed on failed components before time τ and the corrective maintenance (CM) of all failed components are combined with PM of all functioning but deteriorated components after τ; if the system survives to time T without perfect maintenance, it will be subject to PM at time T. Considering maintenance time, asymptotic system cost rate and availability are derived. The results obtained generalize and unify some previous research in this area. Application to aircraft engine maintenance is presented. © 2000 John Wiley & Sons;, Inc. Naval Research Logistics 47: 223–239, 2000 相似文献
156.
In this paper, two different kinds of (N, T)‐policies for an M/M/m queueing system are studied. The system operates only intermittently and is shut down when no customers are present any more. A fixed setup cost of K > 0 is incurred each time the system is reopened. Also, a holding cost of h > 0 per unit time is incurred for each customer present. The two (N, T)‐policies studied for this queueing system with cost structures are as follows: (1) The system is reactivated as soon as N customers are present or the waiting time of the leading customer reaches a predefined time T, and (2) the system is reactivated as soon as N customers are present or the time units after the end of the last busy period reaches a predefined time T. The equations satisfied by the optimal policy (N*, T*) for minimizing the long‐run average cost per unit time in both cases are obtained. Particularly, we obtain the explicit optimal joint policy (N*, T*) and optimal objective value for the case of a single server, the explicit optimal policy N* and optimal objective value for the case of multiple servers when only predefined customers number N is measured, and the explicit optimal policy T* and optimal objective value for the case of multiple servers when only predefined time units T is measured, respectively. These results partly extend (1) the classic N or T policy to a more practical (N, T)‐policy and (2) the conclusions obtained for single server system to a system consisting of m (m ≥ 1) servers. © 2000 John Wiley & Sons, Inc. Naval Research Logistics 47: 240–258, 2000 相似文献
157.
In this short note we study a two‐machine flowshop scheduling problem with the additional no‐idle feasibility constraint and the total completion time criterion function. We show that one of the few papers which deal with this special problem contains incorrect claims and suggest a way how these claims can be rectified. © 2000 John Wiley & Sons, Inc. Naval Research Logistics 47:353–358, 2000 相似文献
158.
论述主汽轮齿轮机组主要部件及主要系统准备时的故障形式、特征、原因和处理对策 .涉及的部件包括汽轮机、减速器、冷凝器、隔音联轴节、各种轴承 ,涉及的系统包括调节控制保安系统、滑油系统、冷凝系统和辅助冷凝装置 . 相似文献
159.
基于知识的雷达装备故障诊断方法 总被引:4,自引:1,他引:3
根据雷达的特点 ,将装备的深层原理知识引入到诊断中来 ,提出了一种面向对象的基于信号传输通道搜索的层次诊断模型和基于框架的层次分布式知识组织形式。具体分析了建立模型和组织知识的方法 ,给出了诊断推理策略和控制策略 ,并通过对某雷达装备的故障诊断 ,验证了其正确性。 相似文献
160.
在统计概率基础上建立了信息神经网络 ,探讨了利用该网络诊断内燃机故障的方法 ;并在 1 2 1 50L内燃机上进行了模拟故障的诊断试验。试验结果表明 ,该方法是可行的。 相似文献