全文获取类型
收费全文 | 152篇 |
免费 | 20篇 |
国内免费 | 5篇 |
出版年
2023年 | 1篇 |
2022年 | 2篇 |
2021年 | 6篇 |
2020年 | 5篇 |
2019年 | 6篇 |
2018年 | 1篇 |
2017年 | 6篇 |
2016年 | 3篇 |
2015年 | 5篇 |
2014年 | 13篇 |
2013年 | 17篇 |
2012年 | 13篇 |
2011年 | 14篇 |
2010年 | 13篇 |
2009年 | 12篇 |
2008年 | 10篇 |
2007年 | 11篇 |
2006年 | 8篇 |
2005年 | 4篇 |
2004年 | 5篇 |
2003年 | 3篇 |
2002年 | 3篇 |
2001年 | 5篇 |
2000年 | 2篇 |
1999年 | 3篇 |
1997年 | 1篇 |
1996年 | 1篇 |
1993年 | 1篇 |
1990年 | 3篇 |
排序方式: 共有177条查询结果,搜索用时 15 毫秒
91.
基于马尔科夫链的一种评价方法 总被引:3,自引:0,他引:3
应用了数理统计与随机过程理论,从分析动态系统的状态以及状态转移情况给出了一种合理的评价方法,经过实例验证,该方法效果较好. 相似文献
92.
93.
An important phenomenon often observed in supply chain management, known as the bullwhip effect, implies that demand variability increases as one moves up the supply chain, i.e., as one moves away from customer demand. In this paper we quantify this effect for simple, two‐stage, supply chains consisting of a single retailer and a single manufacturer. We demonstrate that the use of an exponential smoothing forecast by the retailer can cause the bullwhip effect and contrast these results with the increase in variability due to the use of a moving average forecast. We consider two types of demand processes, a correlated demand process and a demand process with a linear trend. We then discuss several important managerial insights that can be drawn from this research. © 2000 John Wiley & Sons, Inc. Naval Research Logistics 47: 269–286, 2000 相似文献
94.
基于马尔可夫分析理论,给出了人才拥有量预测的马尔可夫模型,并且讨论了模型中转移概率的确定及模型的预测质量等问题. 相似文献
95.
This paper analyzes the simultaneous production of market‐specific products tailored to the needs of individual regions and a global product that could be sold in many regions. We assume that the global product costs more to manufacture, but allows the decision concerning the allocation of products to regions to be delayed until after the manufacturing process has been completed. We further assume that there is additional demand after the region allocation but prior to delivery, extending the two‐stage stochastic program with recourse to include additional stochastic demand after the recourse. This scenario arises, for example, when there is additional uncertainty during a delivery delay which might occur with transoceanic shipments. We develop conditions for optimality assuming a single build‐allocate‐deliver cycle and stochastic demand during both the build and deliver periods. The optimal policy calls for the simultaneous production of market‐specific and global products, even when the global product is substantially more costly than the market‐specific product. In addition, we develop bounds on the performance of the optimal policy for the multicycle problem. © 2003 Wiley Periodicals, Inc. Naval Research Logistics 50: 438–461, 2003 相似文献
96.
打击链是分析武器和系统等作战要素有效性的一种方法.针对当前智能武器概念缺乏一致定义的问题,本文提出了基于打击链作战方式的智能武器判定方法.针对智能武器认定困难引发的军控措施争论,分析了智能武器两方面的失控风险:人失去对自主武器的控制权与自主武器本身存在不可控因素和缺陷;以及智能武器的问责困境:如何在指挥者、编程者与智能... 相似文献
97.
98.
This article addresses the concept of quality risk in outsourcing. Recent trends in outsourcing extend a contract manufacturer's (CM's) responsibility to several functional areas, such as research and development and design in addition to manufacturing. This trend enables an original equipment manufacturer (OEM) to focus on sales and pricing of its product. However, increasing CM responsibilities also suggest that the OEM's product quality is mainly determined by its CM. We identify two factors that cause quality risk in this outsourcing relationship. First, the CM and the OEM may not be able to contract on quality; second, the OEM may not know the cost of quality to the CM. We characterize the effects of these two quality risk factors on the firms' profits and on the resulting product quality. We determine how the OEM's pricing strategy affects quality risk. We show, for example, that the effect of noncontractible quality is higher than the effect of private quality cost information when the OEM sets the sales price after observing the product's quality. We also show that committing to a sales price mitigates the adverse effect of quality risk. To obtain these results, we develop and analyze a three‐stage decision model. This model is also used to understand the impact of recent information technologies on profits and product quality. For example, we provide a decision tree that an OEM can use in deciding whether to invest in an enterprise‐wide quality management system that enables accounting of quality‐related activities across the supply chain. © 2009 Wiley Periodicals, Inc. Naval Research Logistics 2009 相似文献
99.
We study the problem of designing a two‐echelon spare parts inventory system consisting of a central plant and a number of service centers each serving a set of customers with stochastic demand. Processing and storage capacities at both levels of facilities are limited. The manufacturing process is modeled as a queuing system at the plant. The goal is to optimize the base‐stock levels at both echelons, the location of service centers, and the allocation of customers to centers simultaneously, subject to service constraints. A mixed integer nonlinear programming model (MINLP) is formulated to minimize the total expected cost of the system. The problem is NP‐hard and a Lagrangian heuristic is proposed. We present computational results and discuss the trade‐off between cost and service. © 2009 Wiley Periodicals, Inc. Naval Research Logistics 2009 相似文献
100.
There has been a dramatic increase over the past decade in the number of firms that source finished product from overseas. Although this has reduced procurement costs, it has increased supply risk; procurement lead times are longer and are often unreliable. In deciding when and how much to order, firms must consider the lead time risk and the demand risk, i.e., the accuracy of their demand forecast. To improve the accuracy of its demand forecast, a firm may update its forecast as the selling season approaches. In this article we consider both forecast updating and lead time uncertainty. We characterize the firm's optimal procurement policy, and we prove that, with multiplicative forecast revisions, the firm's optimal procurement time is independent of the demand forecast evolution but that the optimal procurement quantity is not. This leads to a number of important managerial insights into the firm's planning process. We show that the firm becomes less sensitive to lead time variability as the forecast updating process becomes more efficient. Interestingly, a forecast‐updating firm might procure earlier than a firm with no forecast updating. © 2009 Wiley Periodicals, Inc. Naval Research Logistics, 2009 相似文献