全文获取类型
收费全文 | 580篇 |
免费 | 83篇 |
国内免费 | 30篇 |
出版年
2023年 | 1篇 |
2022年 | 6篇 |
2021年 | 10篇 |
2020年 | 19篇 |
2019年 | 5篇 |
2018年 | 8篇 |
2017年 | 28篇 |
2016年 | 18篇 |
2015年 | 15篇 |
2014年 | 49篇 |
2013年 | 39篇 |
2012年 | 42篇 |
2011年 | 55篇 |
2010年 | 40篇 |
2009年 | 44篇 |
2008年 | 48篇 |
2007年 | 44篇 |
2006年 | 35篇 |
2005年 | 44篇 |
2004年 | 22篇 |
2003年 | 29篇 |
2002年 | 22篇 |
2001年 | 18篇 |
2000年 | 10篇 |
1999年 | 13篇 |
1998年 | 4篇 |
1997年 | 3篇 |
1996年 | 1篇 |
1995年 | 6篇 |
1994年 | 2篇 |
1993年 | 3篇 |
1992年 | 2篇 |
1991年 | 1篇 |
1990年 | 5篇 |
1989年 | 2篇 |
排序方式: 共有693条查询结果,搜索用时 0 毫秒
551.
This note studies the optimal inspection policies in a supply chain in which a manufacturer purchases components from a supplier but has no direct control of component quality. The manufacturer uses an inspection policy and a damage cost sharing contract to encourage the supplier to improve the component quality. We find that all‐or‐none inspection policies are optimal for the manufacturer if the supplier's share of the damage cost is larger than a threshold; otherwise, the manufacturer should inspect a fraction of a batch. © 2008 Wiley Periodicals, Inc. Naval Research Logistics, 2008 相似文献
552.
We consider a supplier–customer relationship where the customer faces a typical Newsvendor problem of determining perishable capacity to meet uncertain demand. The customer outsources a critical, demand‐enhancing service to an outside supplier, who receives a fixed share of the revenue from the customer. Given such a linear sharing contract, the customer chooses capacity and the service supplier chooses service effort level before demand is realized. We consider the two cases when these decisions are made simultaneously (simultaneous game) or sequentially (sequential game). For each game, we analyze how the equilibrium solutions vary with the parameters of the problem. We show that in the equilibrium, it is possible that either the customer's capacity increases or the service supplier's effort level decreases when the supplier receives a larger share of the revenue. We also show that given the same sharing contract, the sequential game always induces a higher capacity and more effort. For the case of additive effort effect and uniform demand distribution, we consider the customer's problem of designing the optimal contract with or without a fixed payment in the contract, and obtain sensitivity results on how the optimal contract depends on the problem parameters. For the case of fixed payment, it is optimal to allocate more revenue to the supplier to induce more service effort when the profit margin is higher, the cost of effort is lower, effort is more effective in stimulating demand, the variability of demand is smaller or the supplier makes the first move in the sequential game. For the case of no fixed payment, however, it is optimal to allocate more revenue to the supplier when the variability of demand is larger or its mean is smaller. Numerical examples are analyzed to validate the sensitivity results for the case of normal demand distribution and to provide more managerial insights. © 2008 Wiley Periodicals, Inc. Naval Research Logistics, 2008 相似文献
553.
We present a new deterministic linear program for the network revenue management problem with customer choice behavior. The novel aspect of our linear program is that it naturally generates bid prices that depend on how much time is left until the time of departure. Similar to the earlier linear program used by van Ryzin and Liu (2004), the optimal objective value of our linear program provides an upper bound on the optimal total expected revenue over the planning horizon. In addition, the percent gap between the optimal objective value of our linear program and the optimal total expected revenue diminishes in an asymptotic regime where the leg capacities and the number of time periods in the planning horizon increase linearly with the same rate. Computational experiments indicate that when compared with the linear program that appears in the existing literature, our linear program can provide tighter upper bounds, and the control policies that are based on our linear program can obtain higher total expected revenues. © 2008 Wiley Periodicals, Inc. Naval Research Logistics, 2008 相似文献
554.
We consider a manufacturer, served by a single supplier, who has to quote due dates to arriving customers in a make‐to‐order production environment. The manufacturer is penalized for long lead times and for missing due dates. To meet due dates, the manufacturer has to obtain components from a supplier. We model this manufacturer and supplier as a two‐machine flow shop, consider several variations of this problem, and design effective due‐date quotation and scheduling algorithms for centralized and decentralized versions of the model. We perform extensive computational testing to assess the effectiveness of our algorithms and to compare the centralized and decentralized models to quantify the value of centralized control in a make‐to‐order supply chain. Since complete information exchange and centralized control is not always practical or cost‐effective, we explore the value of partial information exchange for this system. © 2008 Wiley Periodicals, Inc. Naval Research Logistics, 2008 相似文献
555.
When facing uncertain demand, several firms may consider pooling their inventories leading to the emergence of two key contractual issues. How much should each produce or purchase for inventory purposes? How should inventory be allocated when shortages occur to some of the firms? Previously, if the allocations issue was considered, it was undertaken through evaluation of the consequences of an arbitrary priority scheme. We consider both these issues within a Nash bargaining solution (NBS) cooperative framework. The firms may not be risk neutral, hence a nontransferable utility bargaining game is defined. Thus the physical pooling mechanism itself must benefit the firms, even without any monetary transfers. The firms may be asymmetric in the sense of having different unit production costs and unit revenues. Our assumption with respect to shortage allocation is that a firm not suffering from a shortfall, will not be affected by any of the other firms' shortages. For two risk neutral firms, the NBS is shown to award priority on all inventory produced to the firm with higher ratio of unit revenue to unit production cost. Nevertheless, the arrangement is also beneficial for the other firm contributing to the total production. We provide examples of Uniform and Bernoulli demand distributions, for which the problem can be solved analytically. For firms with constant absolute risk aversion, the agreement may not award priority to any firm. Analytically solvable examples allow additional insights, e.g. that higher risk aversion can, for some problem parameters, cause an increase in the sum of quantities produced, which is not the case in a single newsvendor setting. © 2008 Wiley Periodicals, Inc. Naval Research Logistics, 2008 相似文献
556.
557.
Traditional inventory systems treat all demands of a given item equally. This approach is optimal if the penalty costs of all customers are the same, but it is not optimal if the penalty costs are different for different customer classes. Then, demands of customers with high penalty costs must be filled before demands of customers with low penalty costs. A commonly used inventory policy for dealing with demands with different penalty costs is the critical level inventory policy. Under this policy demands with low penalty costs are filled as long as inventory is above a certain critical level. If the inventory reaches the critical level, only demands with high penalty costs are filled and demands with low penalty costs are backordered. In this article, we consider a critical level policy for a periodic review inventory system with two demand classes. Because traditional approaches cannot be used to find the optimal parameters of the policy, we use a multidimensional Markov chain to model the inventory system. We use a sample path approach to prove several properties of this inventory system. Although the cost function is not convex, we can build on these properties to develop an optimization approach that finds the optimal solution. We also present some numerical results. © 2008 Wiley Periodicals, Inc. Naval Research Logistics, 2008 相似文献
558.
从大型地下车库的火灾危险性及自身特点出发,分析了常见的火灾隐患及影响火灾蔓延的重要因素,提出了大型地下车库的消防设计要求,并从建立组织制度、加强消防宣传、完善消防设施、开展防火检查、加强灭火演习等几个方面提出了消防安全管理对策,以减少或避免火灾的发生. 相似文献
559.
高茂春 《中国人民武装警察部队学院学报》2008,24(5):73-75
在《治安管理学》教学中加强实践教学,是由其学科特点与授课对象特点决定的,也是为了提高学员第一任职能力与实现教学相长的需要。应通过课堂实践教学、校内实践模拟教学与校外实践基地相结合的方式,加强实践教学在《治安管理学》教学中的具体应用,对于实现《治安管理学》教学目标与我院人才培养目标具有重要意义。 相似文献
560.
周伟 《中国人民武装警察部队学院学报》2008,24(9):13-17
近年来,随着我国堵截、打击毒品犯罪力度的持续加大,境内外贩毒集团组织实施大宗毒品贩运的能力明显减弱,毒品犯罪快速蔓延的势头得到初步遏制。但是,贩毒集团为逃避打击、降低风险,不断变换犯罪手法,钻法律漏洞,特别是组织、利用特殊人群进行贩毒活动的现象日益增多,并呈现出家族化、规模化的趋势,而公安机关在打击特殊群体贩毒活动中,由于立法和执法等多方面的原因,还面临法律、查缉、羁押、案件处理等一系列的问题。执法实践要求运用法律、经济、行政、教育、文化等措施,综合治理特殊群体贩毒问题,努力从源头上遏制特殊人群贩毒问题的滋生、蔓延。 相似文献