In this article, we study a two‐level lot‐sizing problem with supplier selection (LSS), which is an NP‐hard problem arising in different production planning and supply chain management applications. After presenting various formulations for LSS, and computationally comparing their strengths, we explore the polyhedral structure of one of these formulations. For this formulation, we derive several families of strong valid inequalities, and provide conditions under which they are facet‐defining. We show numerically that incorporating these valid inequalities within a branch‐and‐cut framework leads to significant improvements in computation. © 2016 Wiley Periodicals, Inc. Naval Research Logistics 63: 647–666, 2017 相似文献
112.
In this article, we study a parallel machine scheduling problem with inclusive processing set restrictions and the option of job rejection. In the problem, each job is compatible to a subset of machines, and machines are linearly ordered such that a higher‐indexed machine can process all those jobs that a lower‐indexed machine can process (but not conversely). To achieve a tight production due date, some of the jobs might be rejected at certain penalty. We first study the problem of minimizing the makespan of all accepted jobs plus the total penalty cost of all rejected jobs, where we develop a ‐approximation algorithm with a time complexity of . We then study two bicriteria variants of the problem. For the variant problem of minimizing the makespan subject to a given bound on the total rejection cost, we develop a ‐approximation algorithm with a time complexity of . For the variant problem of maximizing the total rejection cost of the accepted jobs subject to a given bound on the makespan, we present a 0.5‐approximation algorithm with a time complexity of . © 2016 Wiley Periodicals, Inc. Naval Research Logistics 63: 667–681, 2017 相似文献
113.
In this article, we address a stochastic generalized assignment machine scheduling problem in which the processing times of jobs are assumed to be random variables. We develop a branch‐and‐price (B&P) approach for solving this problem wherein the pricing problem is separable with respect to each machine, and has the structure of a multidimensional knapsack problem. In addition, we explore two other extensions of this method—one that utilizes a dual‐stabilization technique and another that incorporates an advanced‐start procedure to obtain an initial feasible solution. We compare the performance of these methods with that of the branch‐and‐cut (B&C) method within CPLEX. Our results show that all B&P‐based approaches perform better than the B&C method, with the best performance obtained for the B&P procedure that includes both the extensions aforementioned. We also utilize a Monte Carlo method within the B&P scheme, which affords the use of a small subset of scenarios at a time to estimate the “true” optimal objective function value. Our experimental investigation reveals that this approach readily yields solutions lying within 5% of optimality, while providing more than a 10‐fold savings in CPU times in comparison with the best of the other proposed B&P procedures. © 2014 Wiley Periodicals, Inc. Naval Research Logistics 61: 131–143, 2014 相似文献
114.
We consider the problem of assessing the value of demand sharing in a multistage supply chain in which the retailer observes stationary autoregressive moving average demand with Gaussian white noise (shocks). Similar to previous research, we assume each supply chain player constructs its best linear forecast of the leadtime demand and uses it to determine the order quantity via a periodic review myopic order‐up‐to policy. We demonstrate how a typical supply chain player can determine the extent of its available information in the presence of demand sharing by studying the properties of the moving average polynomials of adjacent supply chain players. The retailer's demand is driven by the random shocks appearing in the autoregressive moving average representation for its demand. Under the assumptions we will make in this article, to the retailer, knowing the shock information is equivalent to knowing the demand process (assuming that the model parameters are also known). Thus (in the event of sharing) the retailer's demand sequence and shock sequence would contain the same information to the retailer's supplier. We will show that, once we consider the dynamics of demand propagation further up the chain, it may be that a player's demand and shock sequences will contain different levels of information for an upstream player. Hence, we study how a player can determine its available information under demand sharing, and use this information to forecast leadtime demand. We characterize the value of demand sharing for a typical supply chain player. Furthermore, we show conditions under which (i) it is equivalent to no sharing, (ii) it is equivalent to full information shock sharing, and (iii) it is intermediate in value to the two previously described arrangements. Although it follows from existing literature that demand sharing is equivalent to full information shock sharing between a retailer and supplier, we demonstrate and characterize when this result does not generalize to upstream supply chain players. We then show that demand propagates through a supply chain where any player may share nothing, its demand, or its full information shocks (FIS) with an adjacent upstream player as quasi‐ARMA in—quasi‐ARMA out. We also provide a convenient form for the propagation of demand in a supply chain that will lend itself to future research applications. © 2014 Wiley Periodicals, Inc. Naval Research Logistics 61: 515–531, 2014 相似文献
115.
This paper considers the statistical analysis of masked data in a series system, where the components are assumed to have Marshall‐Olkin Weibull distribution. Based on type‐I progressive hybrid censored and masked data, we derive the maximum likelihood estimates, approximate confidence intervals, and bootstrap confidence intervals of unknown parameters. As the maximum likelihood estimate does not exist for small sample size, Gibbs sampling is used to obtain the Bayesian estimates and Monte Carlo method is employed to construct the credible intervals based on Jefferys prior with partial information. Numerical simulations are performed to compare the performances of the proposed methods and one data set is analyzed. 相似文献
116.
Stochastic network design is fundamental to transportation and logistic problems in practice, yet faces new modeling and computational challenges resulted from heterogeneous sources of uncertainties and their unknown distributions given limited data. In this article, we design arcs in a network to optimize the cost of single‐commodity flows under random demand and arc disruptions. We minimize the network design cost plus cost associated with network performance under uncertainty evaluated by two schemes. The first scheme restricts demand and arc capacities in budgeted uncertainty sets and minimizes the worst‐case cost of supply generation and network flows for any possible realizations. The second scheme generates a finite set of samples from statistical information (e.g., moments) of data and minimizes the expected cost of supplies and flows, for which we bound the worst‐case cost using budgeted uncertainty sets. We develop cutting‐plane algorithms for solving the mixed‐integer nonlinear programming reformulations of the problem under the two schemes. We compare the computational efficacy of different approaches and analyze the results by testing diverse instances of random and real‐world networks. © 2017 Wiley Periodicals, Inc. Naval Research Logistics 64: 154–173, 2017 相似文献
117.
This article proposes an approximation for the blocking probability in a many‐server loss model with a non‐Poisson time‐varying arrival process and flexible staffing (number of servers) and shows that it can be used to set staffing levels to stabilize the time‐varying blocking probability at a target level. Because the blocking probabilities necessarily change dramatically after each staffing change, we randomize the time of each staffing change about the planned time. We apply simulation to show that (i) the blocking probabilities cannot be stabilized without some form of randomization, (ii) the new staffing algorithm with randomiation can stabilize blocking probabilities at target levels and (iii) the required staffing can be quite different when the Poisson assumption is dropped. © 2017 Wiley Periodicals, Inc. Naval Research Logistics 64: 177–202, 2017 相似文献
118.
In this paper we consider the problem of scheduling a set of jobs on a single machine on which a rate‐modifying activity may be performed. The rate‐modifying activity is an activity that changes the production rate of the machine. So the processing time of a job is a variable, which depends on whether it is scheduled before or after the rate‐modifying activity. We assume that the rate‐modifying activity can take place only at certain predetermined time points, which is a constrained case of a similar problem discussed in the literature. The decisions under consideration are whether and when to schedule the rate‐modifying activity, and how to sequence the jobs in order to minimize some objectives. We study the problems of minimizing makespan and total completion time. We first analyze the computational complexity of both problems for most of the possible versions. The analysis shows that the problems are NP‐hard even for some special cases. Furthermore, for the NP‐hard cases of the makespan problem, we present a pseudo‐polynomial time optimal algorithm and a fully polynomial time approximation scheme. For the total completion time problem, we provide a pseudo‐polynomial time optimal algorithm for the case with agreeable modifying rates. © 2005 Wiley Periodicals, Inc. Naval Research Logistics, 2005 相似文献
119.
In this article we introduce a 2‐machine flowshop with processing flexibility. Two processing modes are available for each task: namely, processing by the designated processor, and processing simultaneously by both processors. The objective studied is makespan minimization. This production environment is encountered in repetitive manufacturing shops equipped with processors that have the flexibility to execute orders either individually or in coordination. In the latter case, the product designer exploits processing synergies between two processors so as to execute a particular task much faster than a dedicated processor. This type of flowshop environment is also encountered in labor‐intensive assembly lines where products moving downstream can be processed either in the designated assembly stations or by pulling together the work teams of adjacent stations. This scheduling problem requires determining the mode of operation of each task, and the subsequent scheduling that preserves the flowshop constraints. We show that the problem is ordinary NP‐complete and obtain an optimal solution using a dynamic programming algorithm with considerable computational requirements for medium and large problems. Then, we present a number of dynamic programming relaxations and analyze their worst‐case error performance. Finally, we present a polynomial time heuristic with worst‐case error performance comparable to that of the dynamic programming relaxations. © 2003 Wiley Periodicals, Inc. Naval Research Logistics, 2004. 相似文献
120.
Command and Control (C2) in a military setting can be epitomized in battles‐of‐old when commanders would seek high ground to gain superior spatial‐temporal information; from this vantage point, decisions were made and relayed to units in the field. Although the fundamentals remain, technology has changed the practice of C2; for example, enemy units may be observed remotely, with instruments of varying positional accuracy. A basic problem in C2 is the ability to track an enemy object in the battlespace and to forecast its future position; the (extended) Kalman filter provides a straightforward solution. The problem changes fundamentally if one assumes that the moving object is headed for an (unknown) location, or waypoint. This article is concerned with the new problem of estimation of such a waypoint, for which we use Bayesian statistical prediction. The computational burden is greater than an ad hoc regression‐based estimate, which we also develop, but the Bayesian approach has a big advantage in that it yields both a predictor and a measure of its variability. © 2004 Wiley Periodicals, Inc. Naval Research Logistics, 2004 相似文献