全文获取类型
收费全文 | 622篇 |
免费 | 151篇 |
国内免费 | 14篇 |
出版年
2023年 | 2篇 |
2022年 | 5篇 |
2021年 | 9篇 |
2020年 | 6篇 |
2019年 | 20篇 |
2018年 | 9篇 |
2017年 | 33篇 |
2016年 | 35篇 |
2015年 | 25篇 |
2014年 | 39篇 |
2013年 | 86篇 |
2012年 | 27篇 |
2011年 | 41篇 |
2010年 | 35篇 |
2009年 | 43篇 |
2008年 | 44篇 |
2007年 | 49篇 |
2006年 | 34篇 |
2005年 | 32篇 |
2004年 | 36篇 |
2003年 | 20篇 |
2002年 | 34篇 |
2001年 | 31篇 |
2000年 | 29篇 |
1999年 | 14篇 |
1998年 | 9篇 |
1997年 | 11篇 |
1996年 | 8篇 |
1995年 | 4篇 |
1993年 | 2篇 |
1992年 | 3篇 |
1991年 | 3篇 |
1990年 | 4篇 |
1989年 | 2篇 |
1988年 | 2篇 |
1987年 | 1篇 |
排序方式: 共有787条查询结果,搜索用时 218 毫秒
81.
Under quasi‐hyperbolic discounting, the valuation of a payoff falls relatively rapidly for earlier delay periods, but then falls more slowly for longer delay periods. When the salespersons with quasi‐hyperbolic discounting consider the product sale problem, they would exert less effort than their early plan, thus resulting in losses of future profit. We propose a winner‐takes‐all competition to alleviate the above time inconsistent behaviors of the salespersons, and allow the company to maximize its revenue by choosing an optimal bonus. To evaluate the effects of the competition scheme, we define the group time inconsistency degree of the salespersons, which measures the consequence of time inconsistent behaviors, and two welfare measures, the group welfare of the salespersons and the company revenue. We show that the competition always improves the group welfare and the company revenue as long as the company chooses to run the competition in the first place. However, the effect on group time inconsistency degree is mixed. When the optimal bonus is moderate (extreme high), the competition motivates (over‐motivates) the salesperson to work hard, thus alleviates (worsens) the time inconsistent behaviors. © 2017 Wiley Periodicals, Inc. Naval Research Logistics 64: 357–372, 2017 相似文献
82.
We study a setting with a single type of resource and with several players, each associated with a single resource (of this type). Unavailability of these resources comes unexpectedly and with player‐specific costs. Players can cooperate by reallocating the available resources to the ones that need the resources most and let those who suffer the least absorb all the costs. We address the cost savings allocation problem with concepts of cooperative game theory. In particular, we formulate a probabilistic resource pooling game and study them on various properties. We show that these games are not necessarily convex, do have non‐empty cores, and are totally balanced. The latter two are shown via an interesting relationship with Böhm‐Bawerk horse market games. Next, we present an intuitive class of allocation rules for which the resulting allocations are core members and study an allocation rule within this class of allocation rules with an appealing fairness property. Finally, we show that our results can be applied to a spare parts pooling situation. 相似文献
83.
84.
Adam D.M. Svendsen 《Defense & Security Analysis》2015,31(1):58-73
This article aims to encourage the fostering of more systems thinking, and its greater exploitation, within the domain of contemporary intelligence. With particular focus on “micro systems thinking” and with reference to key intelligence processes, such as intelligence analysis, the utility of many systems dynamics within the intelligence context seeks to be further revealed. Through their greater collective harnessing, including up to “System of Systems” (“SoS”) dynamics, and promoting all that they can offer, more sophisticated overarching operational-to-strategic/policy “ends,” notably that of “defence-in-depth,” can be viably further advanced in a sustainable manner into the future. Arguably, a much-needed transformative impact on contemporary intelligence can also be increasingly realised through comprehensively engaging in and with more systems and SoS thinking. Aiding civil protection tasks, crisis management, emergency planners, and civil contingency practitioners likewise gain. 相似文献
85.
86.
We consider the problem of scheduling a set of n jobs on a single batch machine, where several jobs can be processed simultaneously. Each job j has a processing time pj and a size sj. All jobs are available for processing at time 0. The batch machine has a capacity D. Several jobs can be batched together and processed simultaneously, provided that the total size of the jobs in the batch does not exceed D. The processing time of a batch is the largest processing time among all jobs in the batch. There is a single vehicle available for delivery of the finished products to the customer, and the vehicle has capacity K. We assume that K = rD, where and r is an integer. The travel time of the vehicle is T; that is, T is the time from the manufacturer to the customer. Our goal is to find a schedule of the jobs and a delivery plan so that the service span is minimized, where the service span is the time that the last job is delivered to the customer. We show that if the jobs have identical sizes, then we can find a schedule and delivery plan in time such that the service span is minimum. If the jobs have identical processing times, then we can find a schedule and delivery plan in time such that the service span is asymptotically at most 11/9 times the optimal service span. When the jobs have arbitrary processing times and arbitrary sizes, then we can find a schedule and delivery plan in time such that the service span is asymptotically at most twice the optimal service span. We also derive upper bounds of the absolute worst‐case ratios in both cases. © 2015 Wiley Periodicals, Inc. Naval Research Logistics 62: 470–482, 2015 相似文献
87.
Model parameter estimation and residual life prediction for a partially observable failing system
下载免费PDF全文
![点击此处可从《海军后勤学研究》网站下载免费的PDF全文](/ch/ext_images/free.gif)
We consider a partially observable degrading system subject to condition monitoring and random failure. The system's condition is categorized into one of three states: a healthy state, a warning state, and a failure state. Only the failure state is observable. While the system is operational, vector data that is stochastically related to the system state is obtained through condition monitoring at regular sampling epochs. The state process evolution follows a hidden semi‐Markov model (HSMM) and Erlang distribution is used for modeling the system's sojourn time in each of its operational states. The Expectation‐maximization (EM) algorithm is applied to estimate the state and observation parameters of the HSMM. Explicit formulas for several important quantities for the system residual life estimation such as the conditional reliability function and the mean residual life are derived in terms of the posterior probability that the system is in the warning state. Numerical examples are presented to demonstrate the applicability of the estimation procedure and failure prediction method. A comparison results with hidden Markov modeling are provided to illustrate the effectiveness of the proposed model. © 2015 Wiley Periodicals, Inc. Naval Research Logistics 62: 190–205, 2015 相似文献
88.
针对OFDM系统中的信道估计问题,提出了一种基于扩展H∞滤波的OFDM自适应盲信道估计方法。该方法通过对常规H∞算法进行改进,实现了在OFDM系统中能自适应跟踪信道的变化特征,从而使均方误差的性能随着输入信噪比的增加得到很大的提高。仿真结果也验证了该算法优于卡尔曼和H∞估计算法,具有计算复杂度低,运算量小、收敛速度快、算法灵活等特性。 相似文献
89.
针对现有星载AIS检测概率低的问题,对星载AIS接收信号冲突和检测概率进行了研究和论证,并对影响检测概率的诸多因素进行了分析。分析了星载AIS与地面AIS的差异性,指出了星载AIS面临的新挑战。重点对星载AIS信号多网冲突问题进行了研究,建立了一种基于船舶分布密度函数的星载AIS检测概率模型。通过分析时隙冲突、船舶动态、轨道高度、天线类型和B类AIS船舶等因素对系统检测概率的影响,为工程设计和性能评估提供了一定参考依据。 相似文献
90.
In scheduling problems with two competing agents, each one of the agents has his own set of jobs to be processed and his own objective function, and both share a common processor. In the single‐machine problem studied in this article, the goal is to find a joint schedule that minimizes the total deviation of the job completion times of the first agent from a common due‐date, subject to an upper bound on the maximum deviation of job completion times of the second agent. The problem is shown to be NP‐hard even for a nonrestrictive due‐date, and a pseudopolynomial dynamic program is introduced and tested numerically. For the case of a restrictive due‐date (a sufficiently small due‐date that may restrict the number of early jobs), a faster pseudopolynomial dynamic program is presented. We also study the multiagent case, which is proved to be strongly NP‐hard. A simple heuristic for this case is introduced, which is tested numerically against a lower bound, obtained by extending the dynamic programming algorithm. © 2013 Wiley Periodicals, Inc. Naval Research Logistics 61: 1–16, 2014 相似文献