排序方式: 共有100条查询结果,搜索用时 15 毫秒
11.
12.
针对现有星载AIS检测概率低的问题,对星载AIS接收信号冲突和检测概率进行了研究和论证,并对影响检测概率的诸多因素进行了分析。分析了星载AIS与地面AIS的差异性,指出了星载AIS面临的新挑战。重点对星载AIS信号多网冲突问题进行了研究,建立了一种基于船舶分布密度函数的星载AIS检测概率模型。通过分析时隙冲突、船舶动态、轨道高度、天线类型和B类AIS船舶等因素对系统检测概率的影响,为工程设计和性能评估提供了一定参考依据。 相似文献
13.
Extending Sastry's result on the uncapacitated two‐commodity network design problem, we completely characterize the optimal solution of the uncapacitated K‐commodity network design problem with zero flow costs for the case when K = 3. By solving a set of shortest‐path problems on related graphs, we show that the optimal solutions can be found in O(n3) time when K = 3, where n is the number of nodes in the network. The algorithm depends on identifying a list of “basic patterns”; the number of basic patterns grows exponentially with K. We also show that the uncapacitated K‐commodity network design problem can be solved in O(n3) time for general K if K is fixed; otherwise, the time for solving the problem is exponential. © 2004 Wiley Periodicals, Inc. Naval Research Logistics, 2004 相似文献
14.
针对面向SDR应用的SIMD数字信号处理器高带宽数据访存需求,提出并实现了一种新型的向量存储结构.该向量存储器由16路向量存储块构成,每路采用两组多体低位地址交叉编址存储结构,减少了访存体冲突,充分利用多存储体带宽,以较小的功耗代价实现并行访问多个向量数据.在此基础上,还设计了一种向量访存重整理单元,使向量存储器可灵活支持多路SIMD结构向量处理单元的非对齐访问,实现了其对向量存储器的共享.测试结果表明,该向量存储器能有效减少或消除向量处理单元之间的数据混洗操作,加速相关应用算法. 相似文献
15.
分布式系统仿真技术研究及其实现 总被引:4,自引:1,他引:3
以舰炮武器系统全数字仿真为例 ,讨论了分布式仿真系统的设计过程 ,提出了仿真系统的体系结构、网络通信方案、多任务并发控制等分布式仿真中关键问题的解决方法 相似文献
16.
17.
We introduce a formulation and an exact solution method for a nonpreemptive resource constrained project scheduling problem in which the duration/cost of an activity is determined by the mode selection and the duration reduction (crashing) within the mode. This problem is a natural combination of the time/cost tradeoff problem and the resource constrained project scheduling problem. It involves the determination, for each activity, of its resource requirements, the extent of crashing, and its start time so that the total project cost is minimized. We present a branch and bound procedure and report computational results with a set of 160 problems. Computational results demonstrate the effectiveness of our procedure. © 2001 John Wiley & Sons, Inc. Naval Research Logistics 48: 107–127, 2001 相似文献
18.
Allocation of scarce common components to finished product orders is central to the performance of assembly systems. Analysis of these systems is complex, however, when the product master schedule is subject to uncertainty. In this paper, we analyze the cost—service performance of a component inventory system with correlated finished product demands, where component allocation is based on a fair shares method. Such issuing policies are used commonly in practice. We quantify the impact of component stocking policies on finished product delays due to component shortages and on product order completion rates. These results are used to determine optimal base stock levels for components, subject to constraints on finished product service (order completion rates). Our methodology can help managers of assembly systems to (1) understand the impact of their inventory management decisions on customer service, (2) achieve cost reductions by optimizing their inventory investments, and (3) evaluate supplier performance and negotiate contracts by quantifying the effect of delivery lead times on costs and customer service. © 2001 John Wiley & Sons, Inc. Naval Research Logistics 48:409–429, 2001 相似文献
19.
Fangruo Chen 《海军后勤学研究》2000,47(5):422-439
Consider a distribution system with a central warehouse and multiple retailers. Customer demand arrives at each of the retailers continuously at a constant rate. The retailers replenish their inventories from the warehouse which in turn orders from an outside supplier with unlimited stock. There are economies of scale in replenishing the inventories at both the warehouse and the retail level. Stockouts at the retailers are backlogged. The system incurs holding and backorder costs. The objective is to minimize the long‐run average total cost in the system. This paper studies the cost effectiveness of (R, Q) policies in the above system. Under an (R, Q) policy, each facility orders a fixed quantity Q from its supplier every time its inventory position reaches a reorder point R. It is shown that (R, Q) policies are at least 76% effective. Numerical examples are provided to further illustrate the cost effectiveness of (R, Q) policies. © 2000 John Wiley & Sons, Inc. Naval Research Logistics 47: 422–439, 2000 相似文献
20.
基于遗传算法的观察所优化配置 总被引:1,自引:1,他引:0
文章研究了三维地形中的观察所优化配置问题,结合观察所实际情况,给出了利用遗传算法进行观察所优化的计算方法,并编制了计算机应用程序.计算机模拟实验表明,文中采用的算法能综合考虑多种因素,所得结果合理、准确,并且具有较高的效率. 相似文献