排序方式: 共有47条查询结果,搜索用时 974 毫秒
31.
王现婧 《中国人民武装警察部队学院学报》2010,26(5):81-84
教师是决定培训质量高低与培训效果好坏的关键性因素。加强培训师资队伍建设,是公安机关人民警察培训工作的重中之重。要充分认识传统教师与培训教师的区别,明确公安机关人民警察培训师资队伍建设途径与方法。 相似文献
32.
33.
We consider a class of production scheduling models with m identical machines in parallel and k different product types. It takes a time pi to produce one unit of product type i on any one of the machines. There is a demand stream for product type i consisting of ni units with each unit having a given due date. Before a machine starts with the production of a batch of products of type i a setup cost c is incurred. We consider several different objective functions. Each one of the objective functions has three components, namely a total setup cost, a total earliness cost, and a total tardiness cost. In our class of problems we find a relatively large number of problems that can be solved either in polynomial time or in pseudo‐polynomial time. The polynomiality or pseudo‐polynomiality is achieved under certain special conditions that may be of practical interest; for example, a regularity pattern in the string of due dates combined with earliness and tardiness costs that are similar for different types of products. The class of models we consider includes as special cases discrete counterparts of a number of inventory models that have been considered in the literature before, e.g., Wagner and Whitin (Manage Sci 5 (1958), 89–96) and Zangwill (Oper Res 14 (1966), 486–507; Manage Sci 15 (1969), 506–527). © 2008 Wiley Periodicals, Inc. Naval Research Logistics, 2008 相似文献
34.
In many practical situations of production scheduling, it is either necessary or recommended to group a large number of jobs into a relatively small number of batches. A decision needs to be made regarding both the batching (i.e., determining the number and the size of the batches) and the sequencing (of batches and of jobs within batches). A setup cost is incurred whenever a batch begins processing on a given machine. This paper focuses on batch scheduling of identical processing‐time jobs, and machine‐ and sequence‐independent setup times on an m‐machine flow‐shop. The objective is to find an allocation to batches and their schedule in order to minimize flow‐time. We introduce a surprising and nonintuitive solution for the problem. © 2004 Wiley Periodicals, Inc. Naval Research Logistics, 2004 相似文献
35.
Parallel machine scheduling with batch deliveries to minimize total flow time and delivery cost 下载免费PDF全文
Motivated by the flow of products in the iron and steel industry, we study an identical and parallel machine scheduling problem with batch deliveries, where jobs finished on the parallel machines are delivered to customers in batches. Each delivery batch has a capacity and incurs a cost. The objective is to find a coordinated production and delivery schedule that minimizes the total flow time of jobs plus the total delivery cost. This problem is an extension of the problem considered by Hall and Potts, Ann Oper Res 135 (2005) 41–64, who studied a two‐machine problem with an unbounded number of transporters and unbounded delivery capacity. We first provide a dynamic programming algorithm to solve a special case with a given job assignment to the machines. A heuristic algorithm is then presented for the general problem, and its worst‐case performance ratio is analyzed. The computational results show that the heuristic algorithm can generate near‐optimal solutions. Finally, we offer a fully polynomial‐time approximation scheme for a fixed number of machines. © 2016 Wiley Periodicals, Inc. Naval Research Logistics 63: 492–502, 2016 相似文献
36.
将灰色系统理论、存储论、数理统计理论综合运用,建立综合数学模型,并将该模型运用于石油库站油料管理中,以提高库站油料管理者的决策水平。建立的多阶段油料订购模型可制定最佳油料订购方案,该模型具有通用性,具有简洁、实用、拟合精度高等特点。 相似文献
37.
消防服务在我国社会生活中已越来越凸显其重要地位。依据公共物品理论,在分析消防服务的经济学特性及供给困境的基础上,提出了一些在我国经济转型条件下有效提供消防服务的思路。 相似文献
38.
龙春霞 《中国人民武装警察部队学院学报》2008,24(7):60-62
公安类院校的马克思主义基本原理概论课程,有关政治经济学部分的教学普遍存在一些问题,主要是学生不重视、不感兴趣;理论本身较为抽象,难于理解;传统理论与时代性内容的矛盾与争议较多等。针对这三方面的问题,从教学方法上提出解决办法,即用快乐教学提高重视程度和兴趣,利用三种有效方法改善理论的抽象性,同时还要注意用不同方式对待矛盾与争议。 相似文献
39.
40.