首页 | 本学科首页   官方微博 | 高级检索  
文章检索
  按 检索   检索词:      
出版年份:   被引次数:   他引次数: 提示:输入*表示无穷大
  收费全文   426篇
  免费   4篇
  430篇
  2023年   3篇
  2021年   2篇
  2019年   14篇
  2018年   4篇
  2017年   19篇
  2016年   26篇
  2015年   17篇
  2014年   17篇
  2013年   69篇
  2012年   18篇
  2011年   23篇
  2010年   24篇
  2009年   21篇
  2008年   22篇
  2007年   33篇
  2006年   24篇
  2005年   14篇
  2004年   20篇
  2003年   12篇
  2002年   16篇
  2001年   10篇
  2000年   12篇
  1999年   2篇
  1998年   1篇
  1997年   1篇
  1996年   3篇
  1994年   2篇
  1991年   1篇
排序方式: 共有430条查询结果,搜索用时 15 毫秒
381.
    
We consider a dynamic lot‐sizing model with production time windows where each of n demands has earliest and latest production due dates and it must be satisfied during the given time window. For the case of nonspeculative cost structure, an O(nlogn) time procedure is developed and it is shown to run in O(n) when demands come in the order of latest production due dates. When the cost structure is somewhat general fixed plus linear that allows speculative motive, an optimal procedure with O(T4) is proposed where T is the length of a planning horizon. Finally, for the most general concave production cost structure, an optimal procedure with O(T5) is designed. © 2007 Wiley Periodicals, Inc. Naval Research Logistics, 2007  相似文献   
382.
    
A two‐echelon distribution inventory system with a central warehouse and a number of retailers is considered. The retailers face stochastic demand and replenish from the warehouse, which, in turn, replenishes from an outside supplier. The system is reviewed continuously and demands that cannot be met directly are backordered. Standard holding and backorder costs are considered. In the literature on multi‐echelon inventory control it is standard to assume that backorders at the warehouse are served according to a first come–first served policy (FCFS). This allocation rule simplifies the analysis but is normally not optimal. It is shown that the FCFS rule can, in the worst case, lead to an asymptotically unbounded relative cost increase as the number of retailers approaches infinity. We also provide a new heuristic that will always give a reduction of the expected costs. A numerical study indicates that the average cost reduction when using the heuristic is about two percent. The suggested heuristic is also compared with two existing heuristics. © 2007 Wiley Periodicals, Inc. Naval Research Logistics, 2007  相似文献   
383.
    
We consider a manufacturer (i.e., a capacitated supplier) that produces to stock and has two classes of customers. The primary customer places orders at regular intervals of time for a random quantity, while the secondary customers request a single item at random times. At a predetermined time the manufacturer receives advance demand information regarding the order size of the primary customer. If the manufacturer is not able to fill the primary customer's demand, there is a penalty. On the other hand, serving the secondary customers results in additional profit; however, the manufacturer can refuse to serve the secondary customers in order to reserve inventory for the primary customer. We characterize the manufacturer's optimal production and stock reservation policies that maximize the manufacturer's discounted profit and the average profit per unit time. We show that these policies are threshold‐type policies, and these thresholds are monotone with respect to the primary customer's order size. Using a numerical study we provide insights into how the value of information is affected by the relative demand size of the primary and secondary customers. © 2007 Wiley Periodicals, Inc. Naval Research Logistics, 2007  相似文献   
384.
    
We investigate the relative effectiveness of top‐down versus bottom‐up strategies for forecasting the demand of an item that belongs to a product family. The demand for each item in the family is assumed to follow a first‐order univariate autoregressive process. Under the top‐down strategy, the aggregate demand is forecasted by using the historical data of the family demand. The demand forecast for the items is then derived by proportional allocation of the aggregate forecast. Under the bottom‐up strategy, the demand forecast for each item is directly obtained by using the historical demand data of the particular item. In both strategies, the forecasting technique used is exponential smoothing. We analytically evaluate the condition under which one forecasting strategy is preferred over the other when the lag‐1 autocorrelation of the demand time series for all the items is identical. We show that when the lag‐1 autocorrelation is smaller than or equal to 1/3, the maximum difference in the performance of the two forecasting strategies is only 1%. However, if the lag‐1 autocorrelation of the demand for at least one of the items is greater than 1/3, then the bottom‐up strategy consistently outperforms the top‐down strategy, irrespective of the items' proportion in the family and the coefficient of correlation between the item demands. A simulation study reveals that the analytical findings hold even when the lag‐1 autocorrelation of the demand processes is not identical. © 2006 Wiley Periodicals, Inc. Naval Research Logistics, 2007.  相似文献   
385.
    
We study the optimal contracting problem between two firms collaborating on capacity investment with information asymmetry. Without a contract, system efficiency is lost due to the profit‐margin differentials among the firms, demand uncertainty, and information asymmetry. With information asymmetry, we demonstrate that the optimal capacity level is characterized by a newsvendor formula with an upward‐adjusted capacity investment cost, and no first‐best solution can be achieved. Our analysis shows that system efficiency can always be improved by the optimal contract and the improvement in system efficience is due to two factors. While the optimal contract may bring the system's capacity level closer to the first‐best capacity level, it prevents the higher‐margin firm from overinvesting and aligns the capacity‐investment decisions of the two firms. Our analysis of a special case demonstrates that, under some circumstances, both firms can benefit from the principal having better information about the agent's costs. © 2007 Wiley Periodicals, Inc. Naval Research Logistics 54:, 2007  相似文献   
386.
    
Accelerated life testing (ALT) is widely used to determine the failure time distribution of a product and the associated life‐stress relationship in order to predict the product's reliability under normal operating conditions. Many types of stress loadings such as constant‐stress, step‐stress and cyclic‐stress can be utilized when conducting ALT. Extensive research has been conducted on the analysis of ALT data obtained under a specified stress loading. However, the equivalency of ALT experiments involving different stress loadings has not been investigated. In this article, a log‐location‐scale distribution under Type I censoring is considered in planning ALT. An idea is provided for the equivalency of various ALT plans involving different stress loadings. Based on this idea, general equivalent ALT plans and some special types of equivalent ALT plans are explored. For demonstration, a constant‐stress ALT and a ramp‐stress ALT for miniature lamps are presented and their equivalency is investigated. © 2010 Wiley Periodicals, Inc. Naval Research Logistics, 2010  相似文献   
387.
    
If the number of customers in a queueing system as a function of time has a proper limiting steady‐state distribution, then that steady‐state distribution can be estimated from system data by fitting a general stationary birth‐and‐death (BD) process model to the data and solving for its steady‐state distribution using the familiar local‐balance steady‐state equation for BD processes, even if the actual process is not a BD process. We show that this indirect way to estimate the steady‐state distribution can be effective for periodic queues, because the fitted birth and death rates often have special structure allowing them to be estimated efficiently by fitting parametric functions with only a few parameters, for example, 2. We focus on the multiserver Mt/GI/s queue with a nonhomogeneous Poisson arrival process having a periodic time‐varying rate function. We establish properties of its steady‐state distribution and fitted BD rates. We also show that the fitted BD rates can be a useful diagnostic tool to see if an Mt/GI/s model is appropriate for a complex queueing system. © 2015 Wiley Periodicals, Inc. Naval Research Logistics 62: 664–685, 2015  相似文献   
388.
    
Motivated by some practical applications, we study a new integrated loading and transportation scheduling problem. Given a set of jobs, a single crane is available to load jobs, one by one, onto semitrailers with a given capacity. Loaded semitrailers are assigned to tractors for transportation tasks. Subject to limited resources (crane, semitrailers, and tractors), the problem is to determine (1) an assignment of jobs to semitrailers for loading tasks, (2) a sequence for the crane to load jobs onto semitrailers, (3) an assignment of loaded semitrailers to tractors for transportation tasks, and (4) a transportation schedule of assigned tractors such that the completion time of the last transportation task is minimized. We first formulate the problem as a mixed integer linear programming model (MILPM) and prove that the problem is strongly NP‐hard. Then, optimality properties are provided which are useful in establishing an improved MILPM and designing solution algorithms. We develop a constructive heuristic, two LP‐based heuristics, and a recovering beam search heuristic to solve this problem. An improved procedure for solutions by heuristics is also presented. Furthermore, two branch‐and‐bound (B&B) algorithms with two different lower bounds are developed to solve the problem to optimality. Finally, computational experiments using both real data and randomly generated data demonstrate that our heuristics are highly efficient and effective. In terms of computational time and the number of instances solved to optimality in a time limit, the B&B algorithms are better than solving the MILPM. © 2015 Wiley Periodicals, Inc. Naval Research Logistics 62: 416–433, 2015  相似文献   
389.
    
In this article, we study generalizations of some of the inventory models with nonlinear costs considered by Rosling in (Oper. Res. 50 (2002) 797–809). In particular, we extend the study of both the periodic review and the compound renewal demand processes from a constant lead time to a random lead time. We find that the quasiconvexity properties of the cost function (and therefore the existence of optimal (s, S) policies), holds true when the lead time has suitable log‐concavity properties. The results are derived by structural properties of renewal delayed processes stopped at an independent random time and by the study of log‐concavity properties of compound distributions. © 2015 Wiley Periodicals, Inc. Naval Research Logistics 62: 345–356, 2015  相似文献   
390.
    
In Assemble‐To‐Order (ATO) systems, situations may arise in which customer demand must be backlogged due to a shortage of some components, leaving available stock of other components unused. Such unused component stock is called remnant stock. Remnant stock is a consequence of both component ordering decisions and decisions regarding allocation of components to end‐product demand. In this article, we examine periodic‐review ATO systems under linear holding and backlogging costs with a component installation stock policy and a First‐Come‐First‐Served (FCFS) allocation policy. We show that the FCFS allocation policy decouples the problem of optimal component allocation over time into deterministic period‐by‐period optimal component allocation problems. We denote the optimal allocation of components to end‐product demand as multimatching. We solve the multi‐matching problem by an iterative algorithm. In addition, an approximation scheme for the joint replenishment and allocation optimization problem with both upper and lower bounds is proposed. Numerical experiments for base‐stock component replenishment policies show that under optimal base‐stock policies and optimal allocation, remnant stock holding costs must be taken into account. Finally, joint optimization incorporating optimal FCFS component allocation is valuable because it provides a benchmark against which heuristic methods can be compared. © 2015 Wiley Periodicals, Inc. Naval Research Logistics 62: 158–169, 2015  相似文献   
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号