全文获取类型
收费全文 | 348篇 |
免费 | 29篇 |
国内免费 | 11篇 |
出版年
2023年 | 1篇 |
2022年 | 1篇 |
2021年 | 1篇 |
2020年 | 3篇 |
2019年 | 4篇 |
2018年 | 3篇 |
2017年 | 15篇 |
2016年 | 18篇 |
2015年 | 12篇 |
2014年 | 29篇 |
2013年 | 20篇 |
2012年 | 28篇 |
2011年 | 33篇 |
2010年 | 19篇 |
2009年 | 29篇 |
2008年 | 20篇 |
2007年 | 14篇 |
2006年 | 18篇 |
2005年 | 18篇 |
2004年 | 20篇 |
2003年 | 12篇 |
2002年 | 7篇 |
2001年 | 9篇 |
2000年 | 12篇 |
1999年 | 6篇 |
1998年 | 7篇 |
1997年 | 1篇 |
1996年 | 1篇 |
1995年 | 7篇 |
1994年 | 3篇 |
1993年 | 4篇 |
1992年 | 1篇 |
1991年 | 4篇 |
1990年 | 8篇 |
排序方式: 共有388条查询结果,搜索用时 15 毫秒
191.
192.
Jack S. Levy 《战略研究杂志》2017,40(5):731-769
If a declining state has incentives for preventive war, the rising state should have incentives to delay a confrontation until it is stronger. We develop the theoretical paradox and examine the July 1914 crisis. Why did Russia, rising relative to Germany, not adopt a buying-time strategy? We argue that although most Russian leaders hoped to avoid a confrontation, they feared that the failure to support Serbia would lead to a loss of Russian credibility and a significant setback to Russia’s position in the Balkans, one that could not easily be reversed, even with Russia’s expected increase in relative military power. 相似文献
193.
194.
This article addresses the inventory placement problem in a serial supply chain facing a stochastic demand for a single planning period. All customer demand is served from stage 1, where the product is stored in its final form. If the demand exceeds the supply at stage 1, then stage 1 is resupplied from stocks held at the upstream stages 2 through N, where the product may be stored in finished form or as raw materials or subassemblies. All stocking decisions are made before the demand occurs. The demand is nonnegative and continuous with a known probability distribution, and the purchasing, holding, shipping, processing, and shortage costs are proportional. There are no fixed costs. All unsatisfied demand is lost. The objective is to select the stock quantities that should be placed different stages so as to maximize the expected profit. Under reasonable cost assumptions, this leads to a convex constrained optimization problem. We characterize the properties of the optimal solution and propose an effective algorithm for its computation. For the case of normal demands, the calculations can be done on a spreadsheet. © 2001 John Wiley & Sons, Inc. Naval Research Logistics 48:506–517, 2001 相似文献
195.
Most machine scheduling models assume that the machines are available all of the time. However, in most realistic situations, machines need to be maintained and hence may become unavailable during certain periods. In this paper, we study the problem of processing a set of n jobs on m parallel machines where each machine must be maintained once during the planning horizon. Our objective is to schedule jobs and maintenance activities so that the total weighted completion time of jobs is minimized. Two cases are studied in this paper. In the first case, there are sufficient resources so that different machines can be maintained simultaneously if necessary. In the second case, only one machine can be maintained at any given time. In this paper, we first show that, even when all jobs have the same weight, both cases of the problem are NP-hard. We then propose branch and bound algorithms based on the column generation approach for solving both cases of the problem. Our algorithms are capable of optimally solving medium sized problems within a reasonable computational time. We note that the general problem where at most j machines, 1 ≤ j ≤ m, can be maintained simultaneously, can be solved similarly by the column generation approach proposed in this paper. © 2000 John Wiley & Sons, Inc. Naval Research Logistics 47: 145–165, 2000 相似文献
196.
利用固定多普勒频率的周期进行测速是测速的方法之一 ,此法应用到雷达测速中 ,通过测出径向速度 ,检验数据的合理性 ,再利用合理的数据进行径向速度外推和非线性修正 ,求得目标的速度。 相似文献
197.
198.
周昕 《中国人民武装警察部队学院学报》2002,18(3):41-42
提出在建筑结构耐火设计及火灾后建筑物修复设计中进行可靠度理论应用的必要性、可行性与优越性 ,旨在为建筑结构在火灾过程中及灾后的安全性评估提供新的研究思路。 相似文献
199.
基于WTK的装备维修训练虚拟现实系统建模与仿真算法 总被引:2,自引:1,他引:1
结合装备维修训练虚拟现实系统(VEMT)的研制,建立了基于WTK(虚拟现实工具包WorldToolKit)的VEMT层次结构模型和仿真场景图,并介绍了VEMT的主控模块仿真算法、场景图仿真算法、立体显示仿真算法和虚拟手抓取物体算法. 相似文献
200.
The paper considers the economic lot scheduling problem (ELSP) where production facility is assumed to deteriorate, owing to aging, with an increasing failure rate. The time to shift from an “in‐control” state to an “out‐of‐control” state is assumed to be normally distributed. The system is scheduled to be inspected at the end of each production lot. If the process is found to be in an “out‐of‐control” state, then corrective maintenance is performed to restore it to an “in‐control” state before the start of the next production run. Otherwise, preventive maintenance is carried out to enhance system reliability. The ELSP is formulated under the capacity constraint taking into account the quality related cost due to possible production of non‐conforming items, process inspection, and maintenance costs. In order to find a feasible production schedule, both the common cycle and time‐varying lot sizes approaches are utilized. © 2003 Wiley Periodicals, Inc. Naval Research Logistics 50: 650–661, 2003 相似文献