排序方式: 共有214条查询结果,搜索用时 15 毫秒
11.
We study a setting with a single type of resource and with several players, each associated with a single resource (of this type). Unavailability of these resources comes unexpectedly and with player‐specific costs. Players can cooperate by reallocating the available resources to the ones that need the resources most and let those who suffer the least absorb all the costs. We address the cost savings allocation problem with concepts of cooperative game theory. In particular, we formulate a probabilistic resource pooling game and study them on various properties. We show that these games are not necessarily convex, do have non‐empty cores, and are totally balanced. The latter two are shown via an interesting relationship with Böhm‐Bawerk horse market games. Next, we present an intuitive class of allocation rules for which the resulting allocations are core members and study an allocation rule within this class of allocation rules with an appealing fairness property. Finally, we show that our results can be applied to a spare parts pooling situation. 相似文献
12.
13.
14.
15.
16.
郭文永 《中国人民武装警察部队学院学报》2014,(7):94-96
阐述了边消警文献信息资源保障体系建设的内涵和建设原则,从资源体系建设、服务体系建设、网络平台建设和保障体系建设等四方面对边消警文献信息资源保障体系建设的内容进行了探讨. 相似文献
17.
18.
杨隽 《中国人民武装警察部队学院学报》2006,22(4):5-7
分析了目前军队院校科研管理资源配置机制中存在的问题及原因,提出了军队院校建立科学高效优化合理的科研管理资源配置机制的基本思路:建立基于学科的资源优化配置机制;建立和完善资源开放平台和共享机制;建立尊重和适应市场规律、科学合理的人才资源配置机制。 相似文献
19.
在任职教育中开发学员任职经验的探讨 总被引:1,自引:0,他引:1
张春 《武警工程学院学报》2010,(1):55-58
任职教育是在受训学员有着一定的任职经验基础上,提高岗位任职能力的一种短期培训。在教学实施过程中,必须注重挖掘任职经验,交流任职经验,再把经验上升为理论从而去指导部队实践。这种任职经验的开发,有利于在教学过程中按需施教,扩大师生的视野,丰富教学资源,实现理论与实践的统一,有效达成任职教育的目标。 相似文献
20.
The client‐contractor bargaining problem addressed here is in the context of a multi‐mode resource constrained project scheduling problem with discounted cash flows, which is formulated as a progress payments model. In this model, the contractor receives payments from the client at predetermined regular time intervals. The last payment is paid at the first predetermined payment point right after project completion. The second payment model considered in this paper is the one with payments at activity completions. The project is represented on an Activity‐on‐Node (AON) project network. Activity durations are assumed to be deterministic. The project duration is bounded from above by a deadline imposed by the client, which constitutes a hard constraint. The bargaining objective is to maximize the bargaining objective function comprised of the objectives of both the client and the contractor. The bargaining objective function is expected to reflect the two‐party nature of the problem environment and seeks a compromise between the client and the contractor. The bargaining power concept is introduced into the problem by the bargaining power weights used in the bargaining objective function. Simulated annealing algorithm and genetic algorithm approaches are proposed as solution procedures. The proposed solution methods are tested with respect to solution quality and solution times. Sensitivity analyses are conducted among different parameters used in the model, namely the profit margin, the discount rate, and the bargaining power weights. © 2009 Wiley Periodicals, Inc. Naval Research Logistics, 2009 相似文献