首页 | 本学科首页   官方微博 | 高级检索  
文章检索
  按 检索   检索词:      
出版年份:   被引次数:   他引次数: 提示:输入*表示无穷大
  收费全文   93篇
  免费   9篇
  国内免费   1篇
  2020年   2篇
  2019年   2篇
  2017年   5篇
  2016年   5篇
  2015年   4篇
  2014年   4篇
  2013年   14篇
  2012年   3篇
  2011年   6篇
  2010年   4篇
  2009年   7篇
  2008年   2篇
  2007年   11篇
  2006年   7篇
  2005年   6篇
  2004年   4篇
  2003年   5篇
  2001年   3篇
  1999年   5篇
  1998年   2篇
  1992年   1篇
  1990年   1篇
排序方式: 共有103条查询结果,搜索用时 15 毫秒
101.
A natural extension of the bucket brigade model of manufacturing is capable of chaotic behavior in which the product intercompletion times are, in effect, random, even though the model is completely deterministic. This is, we believe, the first proven instance of chaos in discrete manufacturing. Chaotic behavior represents a new challenge to the traditional tools of engineering management to reduce variability in production lines. Fortunately, if configured correctly, a bucket brigade assembly line can avoid such pathologies. © 2009 Wiley Periodicals, Inc. Naval Research Logistics 2009  相似文献   
102.
The warehouse problem with deterministic production cost, selling prices, and demand was introduced in the 1950s and there is a renewed interest recently due to its applications in energy storage and arbitrage. In this paper, we consider two extensions of the warehouse problem and develop efficient computational algorithms for finding their optimal solutions. First, we consider a model where the firm can invest in capacity expansion projects for the warehouse while simultaneously making production and sales decisions in each period. We show that this problem can be solved with a computational complexity that is linear in the product of the length of the planning horizon and the number of capacity expansion projects. We then consider a problem in which the firm can invest to improve production cost efficiency while simultaneously making production and sales decisions in each period. The resulting optimization problem is non‐convex with integer decision variables. We show that, under some mild conditions on the cost data, the problem can be solved in linear computational time. © 2016 Wiley Periodicals, Inc. Naval Research Logistics 63: 367–373, 2016  相似文献   
103.
消防法中责令停产停业处罚的决定主体应当包括人民政府和公安消防机构。其中 ,重大的责令停产停业处罚的决定主体应当是地方县级以上人民政府而不是公安消防机构。这是由重大的责令停产停业处罚的严厉性、对经济和社会生活影响的重大性、受处罚组织的特殊性以及处罚实施主体权限的法定性决定的 ,也与地方人民政府的行政管理职能相适应 ,并且符合我国的立法例。责令停产停业处罚的执行主体应当是公安消防机构。  相似文献   
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号