全文获取类型
收费全文 | 338篇 |
免费 | 95篇 |
国内免费 | 1篇 |
出版年
2024年 | 2篇 |
2022年 | 2篇 |
2021年 | 8篇 |
2020年 | 1篇 |
2019年 | 13篇 |
2018年 | 6篇 |
2017年 | 15篇 |
2016年 | 21篇 |
2015年 | 15篇 |
2014年 | 16篇 |
2013年 | 70篇 |
2012年 | 19篇 |
2011年 | 23篇 |
2010年 | 23篇 |
2009年 | 21篇 |
2008年 | 24篇 |
2007年 | 32篇 |
2006年 | 25篇 |
2005年 | 16篇 |
2004年 | 20篇 |
2003年 | 12篇 |
2002年 | 14篇 |
2001年 | 12篇 |
2000年 | 11篇 |
1999年 | 4篇 |
1998年 | 1篇 |
1996年 | 2篇 |
1995年 | 2篇 |
1994年 | 1篇 |
1990年 | 2篇 |
1989年 | 1篇 |
排序方式: 共有434条查询结果,搜索用时 46 毫秒
351.
In this study, we propose a new parsimonious policy for the stochastic joint replenishment problem in a single‐location, N‐item setting. The replenishment decisions are based on both group reorder point‐group order quantity and the time since the last decision epoch. We derive the expressions for the key operating characteristics of the inventory system for both unit and compound Poisson demands. In a comprehensive numerical study, we compare the performance of the proposed policy with that of existing ones over a standard test bed. Our numerical results indicate that the proposed policy dominates the existing ones in 100 of 139 instances with comparably significant savings for unit demands. With batch demands, the savings increase as the stochasticity of demand size gets larger. We also observe that it performs well in environments with low demand diversity across items. The inventory system herein also models a two‐echelon setting with a single item, multiple retailers, and cross docking at the upper echelon. © 2006 Wiley Periodicals, Inc. Naval Research Logistics, 2006 相似文献
352.
The quay crane scheduling problem consists of determining a sequence of unloading and loading movements for cranes assigned to a vessel in order to minimize the vessel completion time as well as the crane idle times. Idle times originate from interferences between cranes since these roll on the same rails and a minimum safety distance must be maintained between them. The productivity of container terminals is often measured in terms of the time necessary to load and unload vessels by quay cranes, which are the most important and expensive equipment used in ports. We formulate the quay crane scheduling problem as a vehicle routing problem with side constraints, including precedence relationships between vertices. For small size instances our formulation can be solved by CPLEX. For larger ones we have developed a branch‐and‐cut algorithm incorporating several families of valid inequalities, which exploit the precedence constraints between vertices. © 2005 Wiley Periodicals, Inc. Naval Research Logistics, 2006 相似文献
353.
Fang Kui 《国防科技大学学报》1995,17(3):65-69
(G~2-continuous)SHAPEPRESERVINGCUBICINTERPOLATIONSPLINE CURVEFangKui(DepartmentofSystemEngineeringandMathematics,NUDT,Changsh?.. 相似文献
354.
In this article, we consider a single machine scheduling problem, in which identical jobs are split into batches of bounded sizes. For each batch, it is allowed to produce less jobs than a given upper bound, that is, some jobs in a batch can be rejected, in which case a penalty is paid for each rejected job. The objective function is the sum of several components, including the sum of the completion times, total delivery cost, and total rejection cost. We reduce this problem to a min‐cost flow problem with a convex quadratic function and adapt Tamir's algorithm for its solution. © 2017 Wiley Periodicals, Inc. Naval Research Logistics 64: 217–224, 2017 相似文献
355.
We consider an integrated usage and maintenance optimization problem for a k‐out‐of‐n system pertaining to a moving asset. The k‐out‐of‐n systems are commonly utilized in practice to increase availability, where n denotes the total number of parallel and identical units and k the number of units required to be active for a functional system. Moving assets such as aircraft, ships, and submarines are subject to different operating modes. Operating modes can dictate not only the number of system units that are needed to be active, but also where the moving asset physically is, and under which environmental conditions it operates. We use the intrinsic age concept to model the degradation process. The intrinsic age is analogous to an intrinsic clock which ticks on a different pace in different operating modes. In our problem setting, the number of active units, degradation rates of active and standby units, maintenance costs, and type of economic dependencies are functions of operating modes. In each operating mode, the decision maker should decide on the set of units to activate (usage decision) and the set of units to maintain (maintenance decision). Since the degradation rate differs for active and standby units, the units to be maintained depend on the units that have been activated, and vice versa. In order to minimize maintenance costs, usage and maintenance decisions should be jointly optimized. We formulate this problem as a Markov decision process and provide some structural properties of the optimal policy. Moreover, we assess the performance of usage policies that are commonly implemented for maritime systems. We show that the cost increase resulting from these policies is up to 27% for realistic settings. Our numerical experiments demonstrate the cases in which joint usage and maintenance optimization is more valuable. © 2017 Wiley Periodicals, Inc. Naval Research Logistics 64: 418–434, 2017 相似文献
356.
In this article, we carry out the stochastic comparison between coherent systems through the relative aging order when component lifetimes are independent and identically distributed. We make use of the signature to characterize the structure of coherent systems, and derive several sufficient conditions under which the compared systems with the common size can be ordered in the sense of relative aging. Specially, we present some scenarios wherein the better a coherent system is, the faster it ages. Moreover, we discuss the relative aging of dual systems as well. Several numerical examples are provided to illustrate the theoretical results. © 2017 Wiley Periodicals, Inc. Naval Research Logistics 64: 345–354, 2017 相似文献
357.
358.
Snke Hartmann 《海军后勤学研究》2002,49(5):433-448
This papers deals with the classical resource‐constrained project scheduling problem (RCPSP). There, the activities of a project have to be scheduled subject to precedence and resource constraints. The objective is to minimize the makespan of the project. We propose a new heuristic called self‐adapting genetic algorithm to solve the RCPSP. The heuristic employs the well‐known activity list representation and considers two different decoding procedures. An additional gene in the representation determines which of the two decoding procedures is actually used to compute a schedule for an individual. This allows the genetic algorithm to adapt itself to the problem instance actually solved. That is, the genetic algorithm learns which of the alternative decoding procedures is the more successful one for this instance. In other words, not only the solution for the problem, but also the algorithm itself is subject to genetic optimization. Computational experiments show that the mechanism of self‐adaptation is capable to exploit the benefits of both decoding procedures. Moreover, the tests show that the proposed heuristic is among the best ones currently available for the RCPSP. © 2002 Wiley Periodicals, Inc. Naval Research Logistics 49: 433–448, 2002; Published online in Wiley InterScience (www.interscience.wiley.com). DOI 10.1002/nav.10029 相似文献
359.
Thomas W. Lucas 《海军后勤学研究》2003,50(4):306-321
There are multiple damage functions in the literature to estimate the probability that a single weapon detonation destroys a point target. This paper addresses differences in the tails of four of the more popular damage functions. These four cover the asymptotic tail behaviors of all monotonically decreasing damage functions with well‐behaved hazard functions. The differences in estimates of probability of kill are quite dramatic for large aim‐point offsets. This is particularly important when balancing the number of threats that can be engaged with the chances of fratricide and collateral damage. In general, analysts substituting one damage function for another may badly estimate kill probabilities in offset‐aiming, which could result in poor doctrine. © 2003 Wiley Periodicals, Inc. Naval Research Logistics 50: 306–321, 2003. 相似文献
360.
In this paper a case study dealing with the maintenance problem of jib cranes is presented. A jib crane is viewed as a complex system whose performance is observed as a single realization over period of time. After pointing out limitations of existing stochastic models to analyze the observed realization a new family of bivariate stochastic processes is introduced. The data of jib crane is analyzed using new model and cross‐validated using part of the data set. It is noted that the new family of stochastic processes is useful to analyze bivariate data where one of the variables is finitely valued and the other is nonnegative and continuous. © 2002 Wiley Periodicals, Inc. Naval Research Logistics 49: 231–243, 2002; Published online in Wiley InterScience (www.interscience.wiley.com). DOI 10.1002/nav.10006 相似文献