首页 | 本学科首页   官方微博 | 高级检索  
文章检索
  按 检索   检索词:      
出版年份:   被引次数:   他引次数: 提示:输入*表示无穷大
  收费全文   4篇
  免费   0篇
  1999年   1篇
  1994年   1篇
  1988年   1篇
  1982年   1篇
排序方式: 共有4条查询结果,搜索用时 31 毫秒
1
1.
We study the problem of multimode scheduling tasks on dedicated processors, with the objective of minimizing the maximum completion time. Each task can be undertaken in one among a set of predefined alternative modes, where each mode specifies a required set of dedicated processors and a processing time. At any time each processor can be used by a single task at most. General precedence constraints exist among tasks, and task preemption is not allowed. The problem consists of assigning a mode and a starting time to each task, respecting processor and precedence constraints, to minimize the time required to complete all tasks. The problem is NP-hard in several particular cases. In previous works, we studied algorithms in which a solution was obtained by means of an iterative procedure that combines mode assignment and sequencing phases separately. In this paper, we present some new heuristics where the decision on the mode assignment is taken on the basis of a partial schedule. Then, for each task, the mode selection and the starting time are chosen simultaneously considering the current processor usage. Different lower bounds are derived from a mathematical formulation of the problem and from a graph representation of a particular relaxed version of the problem. Heuristic solutions and lower bounds are evaluated on randomly generated test problems. © 1999 John Wiley & Sons, Inc. Naval Research Logistics 46: 893–911, 1999  相似文献   
2.
In this paper the n/1/rj Σj wj Cj problem under the assumptions of nonpreemptive sequencing and sequence independent processing times is investigated. After pointing out the fundamental properties, some dominance sufficient conditions among sequences are obtained and a branch and bound algorithm is proposed. Computational results are reported and discussed.  相似文献   
3.
In this article we consider the problem of minimizing the maximum completion time of a sequence of n jobs on a single machine. Nonzero ready times and sequence-dependent processing times are allowed. Upper bounds, lower bounds, and dominance criteria are proposed and exploited in a branch-and-bound algorithm. Computational results are given.  相似文献   
4.
In this article we study the problem of scheduling independent tasks, each of which requires the simultaneous availability of a set of prespecified processors, with the objective of minimizing the maximum completion time. We propose a graph-theoretical approach and identify a class of polynomial instances, corresponding to comparability graphs. We show that the scheduling problem is polynomially equivalent to the problem of extending a graph to a comparability graph whose maximum weighted clique has minimum weight. Using this formulation we show that in some cases it is possible to decompose the problem according to the canonical decomposition of the graph. Finally, a general solution procedure is given that includes a branch-and-bound algorithm for the solution of subproblems which can be neither decomposed nor solved in polynomial time. Some examples and computational results are presented. © 1994 John Wiley & Sons, Inc.  相似文献   
1
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号