排序方式: 共有23条查询结果,搜索用时 15 毫秒
1.
M/G/1(RVT,P(j))表示服务员具有随机长度休息时间(RVT)的、且一休息时间结束时有 j 个顾客等待的概率为 P(j)的、修正的 M/G/1 排队系统。我们用嵌入 Markov 链的技术已详细地分析过这一排队系统,这里提供另一分析方法。最后,应用这个排队系统的分析结果,对时隙 ALOHA 卫星公用信道的分组碰撞概率计算公式作了推导。 相似文献
2.
3.
在频率为1010以下的情况下,给出了由正弦交变电流引起的二维时变电磁场所对应的偏微分方程,并用非线性算子半群理论及单调算子理论证明了相应偏微分方程第一边值初值问题广义解的存在与唯一性. 相似文献
4.
This study investigates the statistical process control application for monitoring queue length data in M/G/1 systems. Specifically, we studied the average run length (ARL) characteristics of two different control charts for detecting changes in system utilization. First, the nL chart monitors the sums of successive queue length samples by subgrouping individual observations with sample size n. Next is the individual chart with a warning zone whose control scheme is specified by two pairs of parameters, (upper control limit, du) and (lower control limit, dl), as proposed by Bhat and Rao (Oper Res 20 (1972) 955–966). We will present approaches to calculate ARL for the two types of control charts using the Markov chain formulation and also investigate the effects of parameters of the control charts to provide useful design guidelines for better performance. Extensive numerical results are included for illustration. © 2011 Wiley Periodicals, Inc. Naval Research Logistics, 2011 相似文献
5.
In many practical multiserver queueing systems, servers not only serve randomly arriving customers but also work on the secondary jobs with infinite backlog during their idle time. In this paper, we propose a c‐server model with a two‐threshold policy, denoted by (e d), to evaluate the performance of this class of systems. With such a policy, when the number of idle servers has reached d (<c), then e (<d) idle agents will process secondary jobs. These e servers keep working on the secondary jobs until they find waiting customers exist in the system at a secondary job completion instant. Using the matrix analytic method, we obtain the stationary performance measures for evaluating different (e, d) policies. © 2006 Wiley Periodicals, Inc. Naval Research Logistics, 2007. 相似文献
6.
在经典GI/M/c排队中引入部分服务台同步多重休假策略,利用拟单生过程和矩阵几何解的方法,求解系统的稳态队长分布及其条件随机分解。 相似文献
7.
Naomi Kok 《African Security Review》2013,22(3):175-180
The eastern Democratic Republic of Congo (DRC) has been characterised by chaos and insecurity for a number of years, but the rise of the M23 rebellion in 2012 once again highlighted just how dire the humanitarian and security situation is. For most of 2012, the crisis was addressed through negotiations between M23 and Kinshasa, mediated by the International Conference on the Great Lakes Region (ICGLR). However, 2013 marked the signing of the Peace, Security and Cooperation Framework Agreement (PSC Framework), and the United Nations Security Council's adoption of Resolution 2098, which contains the mandate of the long-awaited Intervention Brigade (IB). The PSC Framework calls on Kinshasa to implement substantial political reforms while also urging the neighbours of the DRC to stop interfering in its internal affairs. The IB is mandated to carry out targeted operations against the so-called ‘negative forces’ that operate in the eastern DRC. For now, hope of resolving this ongoing crisis hinges on the continuing ICGLR negotiations, the implementation of the PSC Framework and the success of the IB. However, there are critical questions about all of these processes that need to be answered and understood, as the expectations for these processes – especially in the case of the IB – are extremely high. Will the ICGLR manage to negotiate a peace agreement and will the IB succeed, or will they go down in history as yet another failure to save the eastern DRC? 相似文献
8.
通过介绍我院在建设校园网过程中的基本做法和初步经验,对网络技术特别是1000M以太网技术,进行了简单分析和研究,提出了基于Intel网络设备的千兆校园网解决方案,强调指出:建设先进高效的校园网,开展多媒体网络教学,创建信息化教学环境,是信息时代军事教育训练改革的必由之路。 相似文献
9.
MacGregor and Harris (J Quality Technol 25 (1993) 106–118) proposed the exponentially weighted mean squared deviation (EWMS) and the exponentially weighted moving variance (EWMV) charts as ways of monitoring process variability. These two charts are particularly useful for individual observations where no estimate of variability is available from replicates. However, the control charts derived by using the approximate distributions of the EWMS and EWMV statistics are difficult to interpret in terms of the average run length (ARL). Furthermore, both control charting schemes are biased procedures. In this article, we propose two new control charts by applying a normal approximation to the distributions of the logarithms of the weighted sum of chi squared random variables, which are respectively functions of the EWMS and EWMV statistics. These new control charts are easy to interpret in terms of the ARL. On the basis of the simulation studies, we demonstrate that the proposed charts are superior to the EWMS and EWMV charts and they both are nearly unbiased for the commonly used smoothing constants. We also compare the performance of the proposed charts with that of the change point (CP) CUSUM chart of Acosta‐Mejia (1995). The design of the proposed control charts is discussed. An example is also given to illustrate the applicability of the proposed control charts. © 2009 Wiley Periodicals, Inc. Naval Research Logistics, 2009 相似文献
10.
给出了一种IMGS方法,在理论上证明了当系数矩阵为不可约的M-矩阵时IMGS方法收敛,且其收敛速度快于基本的TOR迭代法。最后用数值例子验证了所得到的主要结论。 相似文献