首页 | 本学科首页   官方微博 | 高级检索  
文章检索
  按 检索   检索词:      
出版年份:   被引次数:   他引次数: 提示:输入*表示无穷大
  收费全文   4篇
  免费   1篇
  2019年   1篇
  2017年   1篇
  2011年   1篇
  2008年   1篇
  2006年   1篇
排序方式: 共有5条查询结果,搜索用时 15 毫秒
1
1.
Environmentally friendly energy resources open a new opportunity to tackle the problem of energy security and climate change arising from wide use of fossil fuels. This paper focuses on optimizing the allocation of the energy generated by the renewable energy system to minimize the total electricity cost for sustainable manufacturing systems under time‐of‐use tariff by clipping the peak demand. A rolling horizon approach is adopted to handle the uncertainty caused by the weather change. A nonlinear mathematical programming model is established for each decision epoch based on the predicted energy generation and the probability distribution of power demand in the manufacturing plant. The objective function of the model is shown to be convex, Lipchitz‐continuous, and subdifferentiable. A generalized benders decomposition method based on the primal‐dual subgradient descent algorithm is proposed to solve the model. A series of numerical experiments is conducted to show the effectiveness of the solution approach and the significant benefits of using the renewable energy resources.  相似文献   
2.
In this article, the Building Evacuation Problem with Shared Information (BEPSI) is formulated as a mixed integer linear program, where the objective is to determine the set of routes along which to send evacuees (supply) from multiple locations throughout a building (sources) to the exits (sinks) such that the total time until all evacuees reach the exits is minimized. The formulation explicitly incorporates the constraints of shared information in providing online instructions to evacuees, ensuring that evacuees departing from an intermediate or source location at a mutual point in time receive common instructions. Arc travel time and capacity, as well as supply at the nodes, are permitted to vary with time and capacity is assumed to be recaptured over time. The BEPSI is shown to be NP‐hard. An exact technique based on Benders decomposition is proposed for its solution. Computational results from numerical experiments on a real‐world network representing a four‐story building are given. Results of experiments employing Benders cuts generated in solving a given problem instance as initial cuts in addressing an updated problem instance are also provided. © 2008 Wiley Periodicals, Inc. Naval Research Logistics, 2008  相似文献   
3.
This article introduces the use of Benders' cuts to guide a large neighborhood search to solve the traveling umpire problem, a sports scheduling problem inspired by the real‐life needs of the officials of a sports league. At each time slot, a greedy matching heuristic is used to construct a schedule. When an infeasibility is recognized first a single step backtracking is tried to resolve the infeasibility. If unsuccessful, Benders' cuts are generated to guide a large neighborhood search to ensure feasibility and to improve the solution. Realizing the inherent symmetry present in the problem, a large family of cuts are generated and their effectiveness is tested. The resulting approach is able to find better solutions to many instances of this problem. © 2011 Wiley Periodicals, Inc. Naval Research Logistics, 2011  相似文献   
4.
This article treats the problem of scheduling multiple cranes processing jobs along a line, where cranes are divided into different groups and only cranes in the same group can interfere with each other. Such crane scheduling problems occur, for example, at indented berths or in container yards where double rail‐mounted gantry cranes stack containers such that cranes of the same size can interfere with each other but small cranes can pass underneath larger ones. We propose a novel algorithm based on Benders decomposition to solve this problem to optimality. In a computational study, it is shown that this algorithm solves small and medium‐sized instances and even many large instances within a few seconds or minutes. Moreover, it improves several best known solutions from the literature with regard to the simpler problem version with only one crane group. We also look into whether investment in more complicated crane configurations with multiple crane groups is actually worthwhile.  相似文献   
5.
在讨论了网络系统可靠性计算难题的基础上,以满足工程实际的精度需要并减少分析计算工作量为目标,对现有的4种近似估算网络系统可靠性的方法进行了分析,指出了各种方法产生误差的原因,定性分析了有关方法为减少误差所采取措施的合理性。针对2种不同复杂程度的典型网络系统,通过数值算例,给出了单元可靠度不同情形下的系统可靠度计算值;与精确算法对比之后,得到了量化的误差.基于对各方法的工作量和误差的综合分析,给出了具有工程指导意义的建议.  相似文献   
1
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号