Abstract: | In this paper we consider the multiproduct, multiperiod production-scheduling model of Manne under the assumption that, across products, demands are interrelated over time. When demand requirements are proportional we show that the solution has a specific structure determined by the ratio of setup to production-run time of each product. This structure holds for any length horizon and may permit a substantial (time) savings for column generation solution procedures. |