A single-machine problem with multiple criteria |
| |
Authors: | Ali S. Kiran Ali Tamer Unal |
| |
Abstract: | The problem considered is that of finding the set of efficient sequences of jobs on a single machine with respect to the total flow time and the number of tardy jobs. We present some properties of an existing algorithm and the problem itself. |
| |
Keywords: | |
|
|