首页 | 本学科首页   官方微博 | 高级检索  
   检索      


Testing or fault-finding for reliability growth: A missile destructive-test example
Authors:DP Gaver  PA Jacobs
Abstract:A new piece of equipment has been purchased in a lot of size m. Some of the items can be used in destructive testing before the item is put into use. Testing uncovers faults which can be removed from the remaining pieces of equipment in the lot. If t < m pieces of equipment are tested, then those that remain, m1 = m ? t, have reduced fault incidence and are more reliable than initially, but m1 may be too small to be useful, or than is desirable. In this paper models are studied to address this question: given the lot size m, how to optimize by choice of t the effectiveness of the pieces of equipment remaining after the test. The models used are simplistic and illustrative; they can be straightforwardly improved. © 1997 John Wiley & Sons, Inc. Naval Research Logistics 44: 623–637, 1997
Keywords:reliability growth  Bayesian sequential analysis  Poisson process  destructive testing  how much testing is enough  operational testing
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号