Abstract: | It is well known that a minimal makespan permutation sequence exists for the n × 3 flow shop problem and for the n × m flow shop problem with no inprocess waiting when processing times for both types of problems are positive. It is shown in this paper that when the assumption of positive processing times is relaxed to include nonnegative processing times, optimality of permutation schedules cannot be guaranteed. |