首页 | 本学科首页   官方微博 | 高级检索  
     


Supply management in assembly systems
Authors:Chengbin Chu  Jean-Marie Proth  Xiaolan Xie
Abstract:We consider the case when n components are needed to assemble a given product. Components are provided by suppliers, and the period between the order time and the time a component is available (i.e., the lead time) is a random variable with a known distribution. The due date for the assembled product is also known. The costs to be taken into account are the inventory costs of the components and the backlogging cost of the assembled product. We propose an iterative algorithm which leads to the optimal order instants of the components. © 1993 John Wiley & Sons, Inc.
Keywords:
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号