首页 | 本学科首页   官方微博 | 高级检索  
   检索      


Simultaneous optimization of efficiency and performance balance measures in single-machine scheduling problems
Authors:Awi Federgruen  Gur Mosheiov
Abstract:Manufacturing and service organizations routinely face the challenge of scheduling jobs, orders, or individual customers in a schedule that optimizes either (i) an aggregate efficiency measure, (ii) a measure of performance balance, or (iii) some combination of these two objectives. We address these questions for single-machine job scheduling systems with fixed or controllable due dates. We show that a large class of such problems can be optimized by solving either a single instance or a finite sequence of instances of the so-called (SQC) problem, in which the sum of general quasiconvex functions of the jobs' completion times is to be minimized. To solve a single instance of (SQC), we develop an efficient, though pseudopolynomial algorithm, based on dynamic programming. The algorithm generates a solution that is optimal among all schedules whose starting time is restricted to the points of a prespecified (arbitrary) grid. The algorithm is embedded in an iterative procedure, where in each iteration a specific instance of (SQC) is solved. Special attention is given to the simultaneous minimization of the mean and variance of completion times. © 1993 John Wiley & Sons, Inc.
Keywords:
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号