Abstract: | We discuss the problem of scheduling several jobs on a single machine with the objective of minimizing the weighted mean absolute deviation of flow times around the weighted mean flow time. We first show that the optimal schedule is W-shaped. For the unweighted case, we show that all optimal schedules are V-shaped. This characterization enables us to show that the problem is NP-hard. We then provide a pseudopolynomial algorithm for the unweighted problem. Finally, we consider three heuristic algorithms for the unweighted problem and report computational experience with these algorithms. © 1998 John Wiley & Sons, Inc. Naval Research Logistics 45: 297–311, 1998 |