首页 | 本学科首页   官方微博 | 高级检索  
   检索      


On sequencing with earliest starts and due dates with application to computing bounds for the (n/m/G/Fmax) problem
Authors:Paul Bratley  Michael Florian  Pierre Robillard
Abstract:Recent efforts to improve lower bounds in implicit enumeration algorithms for the general (n/m/G/Fmax) sequencing problem have been directed to the solution of an auxiliary single machine problem that results from the relaxation of some of the interference constraints. We develop an algorithm that obtains optimal and near optimal solutions for this relaxed problem with relatively little computational effort. We report on computational results achieved when this method is used to obtain lower bounds for the general problem. Finally, we show the equivalence of this problem to a single machine sequencing problem with earliest start and due date constraints where the objective is to minimize the maximum lateness.
Keywords:
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号