Abstract: | A mixed optimization technique for optimal machine replacement is presented which allows much more flexibility than previous models. Optimal purchase, maintenance and sale of a given machine between any two given points in time is treated as a subproblem, which one may choose to solve via control theory, dynamic programming, or practical engineering considerations. (A control theory formulation is used in the paper as an illustration.) These subproblem solutions are then incorporated into a Wagner-Whitin formulation for solution of the full problem. The technique is particularly useful for problems with such asymmetries as an existing initial machine or uneven technological change. A simple numerical example is solved in the Appendix. |