首页 | 本学科首页   官方微博 | 高级检索  
     


The cyclic separation scheduling problem
Authors:Ronald D. Armstrong  Prabhakant Sinha
Abstract:This paper deals with the problem of scheduling items (tasks, employees, equipment, etc.) over a finite time horizon so as to minimize total cost expenditures while maintaining a predefined separation between certain items. The problem is cyclic, because the same schedule will be repeated over several consecutive time periods of equal length. Thus, requirements are present to maintain the separation of items not only within the individual time periods considered, but also between items in adjoining periods. A special purpose branch-and-bound algorithm is developed to solve this scheduling problem by taking advantage of its cyclic nature. Computational results are given.
Keywords:
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号