Abstract: | This article addresses deterministic, nonpreemptive scheduling of n jobs with unequal release times on a single machine to minimize the sum of job completion times. This problem is known to be NP-hard. The article compares six available lower bounds in the literature and shows that the lower bound based on the optimal solution to the preemptive version of the problem is the dominant lower bound. |