首页 | 本学科首页   官方微博 | 高级检索  
     

相控阵天线阵面两级备件优化配置模型
引用本文:王永攀,杨江平,张宇,侯晓东. 相控阵天线阵面两级备件优化配置模型[J]. 国防科技大学学报, 2017, 39(3): 172-178
作者姓名:王永攀  杨江平  张宇  侯晓东
作者单位:空军预警学院 陆基预警装备系,空军预警学院 陆基预警装备系,湖北工业大学 电气与电子工程学院,空军预警学院 陆基预警装备系
基金项目:国家自然科学基金资助项目(61401503);军内科研项目(KJ2014023200B11145);博士研究生专项课题(2014JY546)
摘    要:针对相控阵天线阵面备件配置存在的冗余性强、批量送修、多级维修等现实问题,综合考虑备件费用、维修能力以及库存策略之间的关系,建立了基于定期补给的两级备件优化配置模型。给出了系统的故障件维修周转过程和维修备件的定期补给过程,在分析备件、库存、维修能力之间关系的基础上,结合成批到达的排队理论,建立了系统的供应可用度模型。以备件配置费用最小为目标、以系统供应可用度为约束条件,建立了系统的备件优化配置模型,并通过边际效益分析法对模型进行了求解。通过算例仿真与分析对模型进行了验证。结果表明:构建的备件配置能够较好地解决相控阵天线阵面的备件配置问题,具有一定的优越性。

关 键 词:相控阵天线  两级维修  备件  K/N系统  批量送修
收稿时间:2016-01-11
修稿时间:2016-11-10

Optimal Configuration Model of Spare Parts for Phased Array Antenna under Two-echelon Maintenance Supply
WANG Yongpan,YANG Jiangping,ZHANG Yu and HOU Xiaodong. Optimal Configuration Model of Spare Parts for Phased Array Antenna under Two-echelon Maintenance Supply[J]. Journal of National University of Defense Technology, 2017, 39(3): 172-178
Authors:WANG Yongpan  YANG Jiangping  ZHANG Yu  HOU Xiaodong
Abstract:There mainly exist three problems in the spare parts configuration of phased array antenna, such as the strong redundancy, batch delivery maintenance and multi-echelon maintenance. Aiming at these problems, through analyzing the relations among spare parts cost, repair capacity and inventory strategies, this paper establishes an optimal configuration model based on the periodic review strategies. Firstly, the repair circulation process of fault component and the periodic supply process of maintenance spare parts are given, and then the system supply availability model is built by analyzing the relations among spare parts, inventories and repair capacity. And the batch arrival queuing theory is also used in this paper. Secondly, an optimal configuration model of spare parts is built, which chooses minimum spare parts costs as the object and the system availability as the subject. And solution algorithm based on the margin analysis theory to the model is also given. Finally, simulations and analysis of an instance are conducted to verify the proposed model, and results show that the model can solve the spare parts allocation problems of phased array antenna well, and has a high superiority.
Keywords:phased array antenna   two-echelon maintenance   spare parts   K/N systems   batch delivery maintenance.
本文献已被 CNKI 等数据库收录!
点击此处可从《国防科技大学学报》浏览原始摘要信息
点击此处可从《国防科技大学学报》下载免费的PDF全文
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号