首页 | 本学科首页   官方微博 | 高级检索  
相似文献
 共查询到20条相似文献,搜索用时 8 毫秒
1.
    
This article examines optimal path finding problems where cost function and constraints are direction, location, and time dependent. Recent advancements in sensor and data‐processing technology facilitate the collection of detailed real‐time information about the environment surrounding a ground vehicle, an airplane, or a naval vessel. We present a navigation model that makes use of such information. We relax a number of assumptions from existing literature on path‐finding problems and create an accurate, yet tractable, model suitable for implementation for a large class of problems. We present a dynamic programming model which integrates our earlier results for direction‐dependent, time and space homogeneous environment, and consequently, improves its accuracy, efficiency, and run‐time. The proposed path finding model also addresses limited information about the surrounding environment, control‐feasibility of the considered paths, such as sharpest feasible turns a vehicle can make, and computational demands of a time‐dependent environment. To demonstrate the applicability and performance of our path‐finding algorithm, computational experiments for a short‐range ship routing in dynamic wave‐field problem are presented. © 2012 Wiley Periodicals, Inc. Naval Research Logistics, 2012  相似文献   

2.
路径规划是车辆智能化的核心问题之一,而所有路径均可分解为简单的Dubins路径。在Dubins路径的思想下对智能车辆的行驶路径进行分段研究,并利用经典PID控制对该算法的执行性能进行检验。研究表明:算法能计算出车辆行驶的最短路径,减少了车辆行驶的路径长度,缩短了行驶时间,减少了控制系统的计算量,提高了车辆执行系统的执行力度,降低了执行误差,对最优路径具有较好的选择性。  相似文献   

3.
针对某地区防洪救灾中物资的调运问题,利用图论中最短路的知识,根据问题实际,将物资的调运方案分成3个阶段.在每个阶段以费用最小或时间最短为目标.以各单位之间物资的供求平衡为约束,建立了规划模型.通过编程求解,制定了不同情况下物资紧急调运的具体方案,包括用车数量、行车线路、用车时间和费用.  相似文献   

4.
在分布式多传感器目标跟踪系统中,由于局部融合中心(LFC)的物理限制(如:有限的频率信道、处理器容量有限等),只能接收有限个传感器的传送数据。此外,信息传输的方式也将影响传感网的使用寿命,因此,研究了通信受限下的分布式多传感器目标协同跟踪问题。首先对监视区内分布的传感器进行聚类分簇形成若干个子网,接着从通信能耗的角度出发,对传感器采集信息的传递路径进行最优路径规划;进而对子网局部状态进行估计,在子网信息融合中,分别采用最大距离和、最大化信息增量两种准则进行最佳传感器选择,最后通过各子网全局航迹融合实现分布式多传感器协同跟踪。仿真验证了算法的有效性。  相似文献   

5.
    
In this study, we illustrate a real‐time approximate dynamic programming (RTADP) method for solving multistage capacity decision problems in a stochastic manufacturing environment, by using an exemplary three‐stage manufacturing system with recycle. The system is a moderate size queuing network, which experiences stochastic variations in demand and product yield. The dynamic capacity decision problem is formulated as a Markov decision process (MDP). The proposed RTADP method starts with a set of heuristics and learns a superior quality solution by interacting with the stochastic system via simulation. The curse‐of‐dimensionality associated with DP methods is alleviated by the adoption of several notions including “evolving set of relevant states,” for which the value function table is built and updated, “adaptive action set” for keeping track of attractive action candidates, and “nonparametric k nearest neighbor averager” for value function approximation. The performance of the learned solution is evaluated against (1) an “ideal” solution derived using a mixed integer programming (MIP) formulation, which assumes full knowledge of future realized values of the stochastic variables (2) a myopic heuristic solution, and (3) a sample path based rolling horizon MIP solution. The policy learned through the RTADP method turned out to be superior to polices of 2 and 3. © 2010 Wiley Periodicals, Inc. Naval Research Logistics 2010  相似文献   

6.
多架无人机协同作战的路径规划   总被引:2,自引:0,他引:2  
提出了一种协调多架无人机的编队同时到达目标的航路规划方法.首先根据敌方防御区域内雷达、导弹等威胁阵地的具体分布情况,采用划分Voronoi多边形的方法制定初始航路,然后通过叠加定长线段到初始航路上对初始航路进行离散化,最后采用动态链类比法调整航路并对航路进行光顺优化处理,使航路安全可飞.并用数字仿真技术对该方法进行了验证,结果表明该方法是可行的.  相似文献   

7.
    
This article presents a flexible days‐on and days‐off scheduling problem and develops an exact branch and price (B&P) algorithm to find solutions. The main objective is to minimize the size of the total workforce required to cover time‐varying demand over a planning horizon that may extend up to 12 weeks. A new aspect of the problem is the general restriction that the number of consecutive days on and the number of consecutive days off must each fall within a predefined range. Moreover, the total assignment of working days in the planning horizon cannot exceed some maximum value. In the B&P framework, the master problem is stated as a set covering‐type problem whose columns are generated iteratively by solving one of three different subproblems. The first is an implicit model, the second is a resource constrained shortest path problem, and the third is a dynamic program. Computational experiments using both real‐word and randomly generated data show that workforce reductions up to 66% are possible with highly flexible days‐on and days‐off patterns. When evaluating the performance of the three subproblems, it was found that each yielded equivalent solutions but the dynamic program proved to be significantly more efficient. © 2013 Wiley Periodicals, Inc. Naval Research Logistics 60: 678–701, 2013  相似文献   

8.
由于传统Dijkstra算法只能求解最优路径,结合兵力机动路线选择的需要,将求解k短路径的实用算法引入到兵力机动路线优化问题中,给出了算法的数据结构和步骤。在道路权重的确定上,提出将路程、通行能力和安全性三项指标相结合的思想,并给出了综合权重的计算方法。仿真实验表明所提方法具有较强的实用性。  相似文献   

9.
    
Models for integrated production and demand planning decisions can serve to improve a producer's ability to effectively match demand requirements with production capabilities. In contexts with price‐sensitive demands, economies of scale in production, and multiple capacity options, such integrated planning problems can quickly become complex. To address these complexities, this paper provides profit‐maximizing production planning models for determining optimal demand and internal production capacity levels under price‐sensitive deterministic demands, with subcontracting and overtime options. The models determine a producer's optimal price, production, inventory, subcontracting, overtime, and internal capacity levels, while accounting for production economies of scale and capacity costs through concave cost functions. We use polyhedral properties and dynamic programming techniques to provide polynomial‐time solution approaches for obtaining an optimal solution for this class of problems when the internal capacity level is time‐invariant. © 2007 Wiley Periodicals, Inc. Naval Research Logistics, 2007  相似文献   

10.
根据导弹作战机动过程各路段机动时间随机性特点,运用随机规划理论建立了导弹机动任务规划的数学模型,设计了遗传算法求解策略,实现了在一定时间内合理地规划机动路线的任务,并通过算例作了说明。该方法可用于导弹机动路径选择,为导弹作战机动计划的制定提供决策依据。  相似文献   

11.
    
We present a tactical decision model for order acceptance and capacity planning that maximizes the expected profits from accepted orders, allowing for aggregate regular as well as nonregular capacity. The stream of incoming order arrivals is the main source of uncertainty in dynamic order acceptance and the company only has forecasts of the main properties of the future incoming projects. Project proposals arrive sequentially with deterministic interarrival times and a decision on order acceptance and capacity planning needs to be made each time a proposal arrives and its project characteristics are revealed. We apply stochastic dynamic programming to determine a profit threshold for the accept/reject decision as well as to deterministically allocate a single bottleneck resource to the accepted projects, both with an eye on maximizing the expected revenues within the problem horizon. We derive a number of managerial insights based on an analysis of the influence of project and environmental characteristics on optimal project selection and aggregate capacity usage. © 2007 Wiley Periodicals, Inc. Naval Research Logistics, 2007  相似文献   

12.
图论最短路径问题在消防选址中的应用   总被引:1,自引:0,他引:1  
最短路径问题是图论解决的典型实际问题之一,可用来解决管路铺设、线路安装、厂区布局和设备更新等实际问题。介绍了图论最短路径问题及其算法,并应用图论最短路径问题的分析方法,解决城市消防站的选址问题。  相似文献   

13.
针对实际作战环境中的不同威胁等级和不同威胁实体的威胁源,提出了改进型的Voronoi图,并建立了基于改进型Voronoi图的航迹规划空间;基于A*算法的估价函数在不同阶段对指标的敏感度不同,在传统的启发式A*搜索算法基础上提出了动态权值A*搜索算法,提高了航迹搜索的效率,实现了航迹搜索过程快速性和准确性的结合。最后通过Matlab仿真计算出由动态权值A*算法得到的最优航迹,并进行了航迹的平滑处理,仿真表明了该方法的可行性。  相似文献   

14.
    
This paper finds the optimal integrated production schedule and preventive maintenance plan for a single machine exposed under a cumulative damage process, and investigates how the optimal preventive maintenance plan interacts with the optimal production schedule. The goal is to minimize the total tardiness. The optimal policy possesses the following properties: Under arbitrary maintenance plan when jobs have common processing time, and different due dates, the optimal production schedule is to order the jobs by earliest due date first rule; and when jobs have common due date and different processing times, the optimal production schedule is shortest processing time first. The optimal maintenance plan is of control limit type under any arbitrary production schedule when machine is exposed under a cumulative damage failure process. Numerical studies on the optimal maintenance control limit of the maintenance plan indicate that as the number of jobs to be scheduled increases, the effect of jobs due dates on the optimal maintenance control limit diminishes. © 2007 Wiley Periodicals, Inc. Naval Research Logistics, 2007  相似文献   

15.
针对当前突发事件处理过程中人为因素过多,容易出现错误决策的不足,设计实现了基于MapGIS的突发事件应急指挥系统。系统包括地图操作、突发事件应急决策、突发事件模拟等功能,并以应急决策模块为例说明了系统实现。  相似文献   

16.
    
We study new decision and optimization problems of finding a simple path between two given vertices in an arc weighted directed multigraph such that the path length is equal to a given number or it does not fall into the given forbidden intervals (gaps). A fairly complete computational complexity classification is provided and exact and approximation algorithms are suggested.  相似文献   

17.
针对调运路径规划这一问题,采用栅格模型表示环境地图,通过设定路径搜索方向权重,剔除不必要的搜索区域,提高了搜索效率.仿真结果表明,该算法能有效地提高路径搜索效率,并能搜索到最优路径.  相似文献   

18.
    
We propose two approximate dynamic programming methods to optimize the distribution operations of a company manufacturing a certain product at multiple production plants and shipping it to different customer locations for sale. We begin by formulating the problem as a dynamic program. Our first approximate dynamic programming method uses a linear approximation of the value function and computes the parameters of this approximation by using the linear programming representation of the dynamic program. Our second method relaxes the constraints that link the decisions for different production plants. Consequently, the dynamic program decomposes by the production plants. Computational experiments show that the proposed methods are computationally attractive, and in particular, the second method performs significantly better than standard benchmarks. © 2006 Wiley Periodicals, Inc. Naval Research Logistics, 2006  相似文献   

19.
路径规划算法是机器人技术以及自动化系统等领域的核心问题之一。针对三维动态空间中易出现移动目标、动态威胁等,构建智能体路径规划的仿真环境及相关模型,确定仿真流程。运用近端策略优化对改进的流体扰动算法的初始路径进行修正,实现最优决策。并进行仿真验证,结果表明在三维动态空间中,该算法在路径规划的收敛效率、路径平滑度和避障成功率等方面均优于对比算法。对于三维动态空间中易发生出现可移动障碍物等情况,此算法优化改进的流体扰动算法,具有较好的鲁棒性和良好的适应性。  相似文献   

20.
We consider a robust shortest path problem when the cost coefficient is the product of two uncertain factors. We first show that the robust problem can be solved in polynomial time by a dual‐variable enumeration with shortest path problems as subproblems. We also propose a path enumeration approach using a K ‐shortest paths finding algorithm that may be efficient in many real cases. An application in hazardous materials transportation is discussed, and the solution methods are illustrated by numerical examples. © 2013 Wiley Periodicals, Inc. Naval Research Logistics, 2013  相似文献   

设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号