首页 | 本学科首页   官方微博 | 高级检索  
相似文献
 共查询到20条相似文献,搜索用时 203 毫秒
1.
This article examines the single-machine scheduling problem to minimize total flow time with unequal release dates. This problem has been proven to be NP-hard. We present a necessary and sufficient condition for local optimality which can also be considered as a priority rule. On the basis of this condition, we then define a class of schedules which contains all optimal solutions. We present some efficient heuristic algorithms using the previous condition to build a schedule belonging to this subset. We also prove some new dominance theorems, discuss the results found in the literature for this problem, and propose a branch-and-bound algorithm in which the heuristics are used to provide good upper bounds. We compare this new algorithm with existing algorithms found in the literature. Computational results on problems with up to 100 jobs indicate that the proposed branch-and-bound algorithm is superior to previously published algorithms. © 1992 John Wiley & Sons. Inc.  相似文献   

2.
We consider the scheduling problem in a make‐to‐stock queue with two demand classes that can be differentiated based on their variability. One class experiences Poisson arrivals and the other class experiences hyperexponential renewal arrivals. We provide an exact analysis of the case where the demand class with higher variability is given non‐preemptive priority. The results are then used to compare the inventory cost performance of three scheduling disciplines, first‐come first‐serve and priority to either class. We then build on an existing dynamic scheduling heuristic to propose a modification that works well for our system. Extensions of the heuristic to more than two classes and to the case where demand state is known are also discussed. © 2006 Wiley Periodicals, Inc. Naval Research Logistics, 2006.  相似文献   

3.
In this research, we consider robust simulation optimization with stochastic constraints. In particular, we focus on the ranking and selection problem in which the computing time is sufficient to evaluate all the designs (solutions) under consideration. Given a fixed simulation budget, we aim at maximizing the probability of correct selection (PCS) for the best feasible design, where the objective and constraint measures are assessed by their worst‐case performances. To simplify the complexity of PCS, we develop an approximated probability measure and derive the asymptotic optimality condition (optimality condition as the simulation budget goes to infinity) of the resulting problem. A sequential selection procedure is then designed within the optimal computing budget allocation framework. The high efficiency of the proposed procedure is tested via a number of numerical examples. In addition, we provide some useful insights into the efficiency of a budget allocation procedure.  相似文献   

4.
This paper presents a branch‐and‐price algorithm for scheduling n jobs on m nonhomogeneous parallel machines with multiple time windows. An additional feature of the problem is that each job falls into one of ρ priority classes and may require two operations. The objective is to maximize the weighted number of jobs scheduled, where a job in a higher priority class has “infinitely” more weight or value than a job in a lower priority class. The methodology makes use of a greedy randomized adaptive search procedure (GRASP) to find feasible solutions during implicit enumeration and a two‐cycle elimination heuristic when solving the pricing subproblems. Extensive computational results are presented based on data from an application involving the use of communications relay satellites. Many 100‐job instances that were believed to be beyond the capability of exact methods, were solved within minutes. © 2005 Wiley Periodicals, Inc. Naval Research Logistics, 2006  相似文献   

5.
This article is concerned with a general multi‐class multi‐server priority queueing system with customer priority upgrades. The queueing system has various applications in inventory control, call centers operations, and health care management. Through a novel design of Lyapunov functions, and using matrix‐analytic methods, sufficient conditions for the queueing system to be stable or instable are obtained. Bounds on the queue length process are obtained by a sample path method, with the help of an auxiliary queueing system. © 2012 Wiley Periodicals, Inc. Naval Research Logistics, 2012  相似文献   

6.
We study a class of replacement models for systems subject to deterioration. The objective is to determine an optimal replacement policy that minimizes the average operating costs of the system. We use a parametric analysis to establish sufficient conditions for the optimality of control limit policies. This work generalizes several existing results for optimal replacement models in the literature. © 1992 John Wiley & Sons, Inc.  相似文献   

7.
The optimality of the One‐Bug‐Look‐Ahead (OLA) software release policy proposed by Morali and Soyer ( 15 ) is re‐examined in this paper. A counterexample is constructed to show that OLA is not optimal in general. The optimal stopping approach is then called upon to prove that OLA possesses weaker sense of optimality under conditional monotonicity and the strong sense of optimality holds under a more restrictive sample‐wise monotonicity condition. The NTDS data are analyzed for illustration, and OLA is shown to be robust with respect to model parameters. © 2007 Wiley Periodicals, Inc. Naval Research Logistics, 2007.  相似文献   

8.
In this article, we study a queueing system serving multiple classes of customers. Each class has a finite‐calling population. The customers are served according to the preemptive‐resume priority policy. We assume general distributions for the service times. For each priority class, we derive the steady‐state system size distributions at departure/arrival and arbitrary time epochs. We introduce the residual augmented process completion times conditioned on the number of customers in the system to obtain the system time distribution. We then extend the model by assuming that the server is subject to operation‐independent failures upon which a repair process with random duration starts immediately. We also demonstrate how setup times, which may be required before resuming interrupted service or picking up a new customer, can be incorporated in the model. © 2013 Wiley Periodicals, Inc. Naval Research Logistics, 2013  相似文献   

9.
Motivated by some practical applications, we study a new integrated loading and transportation scheduling problem. Given a set of jobs, a single crane is available to load jobs, one by one, onto semitrailers with a given capacity. Loaded semitrailers are assigned to tractors for transportation tasks. Subject to limited resources (crane, semitrailers, and tractors), the problem is to determine (1) an assignment of jobs to semitrailers for loading tasks, (2) a sequence for the crane to load jobs onto semitrailers, (3) an assignment of loaded semitrailers to tractors for transportation tasks, and (4) a transportation schedule of assigned tractors such that the completion time of the last transportation task is minimized. We first formulate the problem as a mixed integer linear programming model (MILPM) and prove that the problem is strongly NP‐hard. Then, optimality properties are provided which are useful in establishing an improved MILPM and designing solution algorithms. We develop a constructive heuristic, two LP‐based heuristics, and a recovering beam search heuristic to solve this problem. An improved procedure for solutions by heuristics is also presented. Furthermore, two branch‐and‐bound (B&B) algorithms with two different lower bounds are developed to solve the problem to optimality. Finally, computational experiments using both real data and randomly generated data demonstrate that our heuristics are highly efficient and effective. In terms of computational time and the number of instances solved to optimality in a time limit, the B&B algorithms are better than solving the MILPM. © 2015 Wiley Periodicals, Inc. Naval Research Logistics 62: 416–433, 2015  相似文献   

10.
We use the matrix-geometric method to study the discrete time MAP/PH/1 priority queue with two types of jobs. Both preemptive and non-preemptive cases are considered. We show that the structure of the R matrix obtained by Miller for the Birth-Death system can be extended to our Quasi-Birth-Death case. For both preemptive and non-preemptive cases the distributions of the number of jobs of each type in the system are obtained and their waiting times are obtained for the non-preemptive. For the preemptive case we obtain the waiting time distribution for the high priority job and the distribution of the lower priority job's wait before it becomes the leading job of its priority class. © 1998 John Wiley & Sons, Inc. Naval Research Logistics 45: 23–50, 1998  相似文献   

11.
In this article, we discuss the optimal allocation problem in a multiple stress levels life‐testing experiment when an extreme value regression model is used for statistical analysis. We derive the maximum likelihood estimators, the Fisher information, and the asymptotic variance–covariance matrix of the maximum likelihood estimators. Three optimality criteria are defined and the optimal allocation of units for two‐ and k‐stress level situations are determined. We demonstrate the efficiency of the optimal allocation of units in a multiple stress levels life‐testing experiment by using real experimental situations discussed earlier by McCool and Nelson and Meeker. Monte Carlo simulations are used to show that the optimality results hold for small sample sizes as well. © 2006 Wiley Periodicals, Inc. Naval Research Logistics, 2007  相似文献   

12.
We apply the techniques of response surface methodology (RSM) to approximate the objective function of a two‐stage stochastic linear program with recourse. In particular, the objective function is estimated, in the region of optimality, by a quadratic function of the first‐stage decision variables. The resulting response surface can provide valuable modeling insight, such as directions of minimum and maximum sensitivity to changes in the first‐stage variables. Latin hypercube (LH) sampling is applied to reduce the variance of the recourse function point estimates that are used to construct the response surface. Empirical results show the value of the LH method by comparing it with strategies based on independent random numbers, common random numbers, and the Schruben‐Margolin assignment rule. In addition, variance reduction with LH sampling can be guaranteed for an important class of two‐stage problems which includes the classical capacity expansion model. © 1999 John Wiley & Sons, Inc. Naval Research Logistics 46: 753–776, 1999  相似文献   

13.
Despite its ability to result in more effective network plans, the telecommunication network planning problem with signal‐to‐interference ratio constraints gained less attention than the power‐based one because of its complexity. In this article, we provide an exact solution method for this class of problems that combines combinatorial Benders decomposition, classical Benders decomposition, and valid cuts in a nested way. Combinatorial Benders decomposition is first applied, leading to a binary master problem and a mixed integer subproblem. The subproblem is then decomposed using classical Benders decomposition. The algorithm is enhanced using valid cuts that are generated at the classical Benders subproblem and are added to the combinatorial Benders master problem. The valid cuts proved efficient in reducing the number of times the combinatorial Benders master problem is solved and in reducing the overall computational time. More than 120 instances of the W‐CDMA network planning problem ranging from 20 demand points and 10 base stations to 140 demand points and 30 base stations are solved to optimality. © 2010 Wiley Periodicals, Inc. Naval Research Logistics, 2010  相似文献   

14.
Capacity expansion refers to the process of adding facilities or manpower to meet increasing demand. Typical capacity expansion decisions are characterized by uncertain demand forecasts and uncertainty in the eventual cost of expansion projects. This article models capacity expansion within the framework of piecewise deterministic Markov processes and investigates the problem of controlling investment in a succession of same type projects in order to meet increasing demand with minimum cost. In particular, we investigate the optimality of a class of investment strategies called cutoff strategies. These strategies have the property that there exists some undercapacity level M such that the strategy invests at the maximum available rate at all levels above M and does not invest at any level below M. Cutoff strategies are appealing because they are straightforward to implement. We determine conditions on the undercapacity penalty function that ensure the existence of optimal cutoff strategies when the cost of completing a project is exponentially distributed. A by-product of the proof is an algorithm for determining the optimal strategy and its cost. © 1995 John Wiley & Sons, Inc.  相似文献   

15.
A general class of single machine stochastic scheduling problems incorporating precedence constraints is modelled as a family of competing Markov decision processes. A bound on the optimal return yields a suboptimality bound for permutation policies. This in turn leads to a generalised “used better than new” principle as a (highly intuitive) sufficient condition for the optimality of a permutation policy in the class of all (preemptive) policies. © 1995 John Wiley & Sons, Inc.  相似文献   

16.
We address the capacitated lot‐sizing and scheduling problem with setup times, setup carry‐over, back‐orders, and parallel machines as it appears in a semiconductor assembly facility. The problem can be formulated as an extension of the capacitated lot‐sizing problem with linked lot‐sizes (CLSPL). We present a mixed integer (MIP) formulation of the problem and a new solution procedure. The solution procedure is based on a novel “aggregate model,” which uses integer instead of binary variables. The model is embedded in a period‐by‐period heuristic and is solved to optimality or near‐optimality in each iteration using standard procedures (CPLEX). A subsequent scheduling routine loads and sequences the products on the parallel machines. Six variants of the heuristic are presented and tested in an extensive computational study. © 2009 Wiley Periodicals, Inc. Naval Research Logistics 2009  相似文献   

17.
This article considers two related questions of tactics in the context of the salvo model for naval missile combat. For a given set of targets, how many missiles should be fired to produce an effective attack? For a given available salvo size, how many enemy targets should be fired at? In the deterministic version of the model I derive a simple optimality relationship between the number of missiles to fire and the number of targets to engage. In the stochastic model I employ the expected loss inflicted and the probability of enemy elimination as the main performance measures and use these to derive salvo sizes that are in some sense “optimal.” I find that the offensive firepower needed for an effective attack depends not only on a target's total strength but also on the relative balance between its active defensive power and passive staying power. © 2006 Wiley Periodicals, Inc. Naval Research Logistics, 2007  相似文献   

18.
In this paper, we introduce a new notion of local optimality and demonstrate its application to the problem of finding optimal independent sets and vertex covers in k-claw free graphs. The maximum independent set problem in k-claw free graphs has interesting applications in the design of electronic testing fixtures for printed circuit boards [13]. For this problem, our concept of local optimality enabled us to devise an efficient heuristic algorithm which outperforms the currently best approximation algorithm by nearly a factor of two in terms of worst case bound. We believe that the idea of local optimality suggested in this paper can also be applied to other combinatorial problems such as the clique problem, the dominating set problem and the graph coloring problem. © 1996 John Wiley & Sons, Inc.  相似文献   

19.
基于Vague集的TOPSIS法求解目标优先级   总被引:1,自引:0,他引:1  
童俊  单甘霖 《火力与指挥控制》2012,37(5):140-143,147
针对传感器管理中目标—传感器配对出现的目标优先级求解问题,提出了一种基于Vague集的TOPSIS计算方法。在分析目标优先级的主要影响因素基础上,定义了各影响因素的影响系数。同时结合Vague集的TOPSIS法给出了目标优先级的计算步骤,为目标优先级求解提供了一种新途径。并结合仿真算例表明该方法的合理性与有效性。  相似文献   

20.
Recent years have seen a strong trend toward outsourcing warranty repair services to outside vendors. In this article we consider the problem of dynamically routing warranty repairs to service vendors when warranties have priority levels. Each time an item under warranty fails, it is sent to one of the vendors for repair. Items covered by higher priority warranty receive higher priority in repair service. The manufacturer pays a fixed fee per repair and incurs a linear holding cost while an item is undergoing or waiting for repair. The objective is to minimize the manufacturer's long‐run average cost. Because of the complexity of the problem, it is very unlikely that there exist tractable ways to find the optimal routing strategies. Therefore, we propose five heuristic routing procedures that are applicable to real‐life problems. We evaluate the heuristics using simulation. The simulation results show that the index‐based “generalized join the shortest queue” policy, which applies a single policy improvement step to an initial state‐independent policy, performs the best among all five heuristics. © 2007 Wiley Periodicals, Inc. Naval Research Logistics, 2008  相似文献   

设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号