首页 | 本学科首页   官方微博 | 高级检索  
相似文献
 共查询到20条相似文献,搜索用时 328 毫秒
1.
We consider a processing network in which jobs arrive at a fork‐node according to a renewal process. Each job requires the completion of m tasks, which are instantaneously assigned by the fork‐node to m task‐processing nodes that operate like G/M/1 queueing stations. The job is completed when all of its m tasks are finished. The sojourn time (or response time) of a job in this G/M/1 fork‐join network is the total time it takes to complete the m tasks. Our main result is a closed‐form approximation of the sojourn‐time distribution of a job that arrives in equilibrium. This is obtained by the use of bounds, properties of D/M/1 and M/M/1 fork‐join networks, and exploratory simulations. Statistical tests show that our approximation distributions are good fits for the sojourn‐time distributions obtained from simulations. © 2008 Wiley Periodicals, Inc. Naval Research Logistics, 2008  相似文献   

2.
In this paper we consider the capacitated multi‐facility Weber problem with the Euclidean, squared Euclidean, and ?p‐distances. This problem is concerned with locating m capacitated facilities in the Euclidean plane to satisfy the demand of n customers with the minimum total transportation cost. The demand and location of each customer are known a priori and the transportation cost between customers and facilities is proportional to the distance between them. We first present a mixed integer linear programming approximation of the problem. We then propose new heuristic solution methods based on this approximation. Computational results on benchmark instances indicate that the new methods are both accurate and efficient. © 2006 Wiley Periodicals, Inc. Naval Research Logistics 2006  相似文献   

3.
We consider the problem of efficiently scheduling deliveries by an uncapacitated courier from a central location under online arrivals. We consider both adversary‐controlled and Poisson arrival processes. In the adversarial setting we provide a randomized (3βΔ/2δ ? 1) ‐competitive algorithm, where β is the approximation ratio of the traveling salesman problem, δ is the minimum distance between the central location and any customer, and Δ is the length of the optimal traveling salesman tour overall customer locations and the central location. We provide instances showing that this analysis is tight. We also prove a 1 + 0.271Δ/δ lower‐bound on the competitive ratio of any algorithm in this setting. In the Poisson setting, we relax our assumption of deterministic travel times by assuming that travel times are distributed with a mean equal to the excursion length. We prove that optimal policies in this setting follow a threshold structure and describe this structure. For the half‐line metric space we bound the performance of the randomized algorithm in the Poisson setting, and show through numerical experiments that the performance of the algorithm is often much better than this bound.  相似文献   

4.
We consider the coordination problem between a vendor and a buyer operating under generalized replenishment costs that include fixed costs as well as stepwise freight costs. We study the stochastic demand, single‐period setting where the buyer must decide on the order quantity to satisfy random demand for a single item with a short product life cycle. The full order for the cycle is placed before the cycle begins and no additional orders are accepted by the vendor. Due to the nonrecurring nature of the problem, the vendor's replenishment quantity is determined by the buyer's order quantity. Consequently, by using an appropriate pricing schedule to influence the buyer's ordering behavior, there is an opportunity for the vendor to achieve substantial savings from transportation expenses, which are represented in the generalized replenishment cost function. For the problem of interest, we prove that the vendor's expected profit is not increasing in buyer's order quantity. Therefore, unlike the earlier work in the area, it is not necessarily profitable for the vendor to encourage larger order quantities. Using this nontraditional result, we demonstrate that the concept of economies of scale may or may not work by identifying the cases where the vendor can increase his/her profits either by increasing or decreasing the buyer's order quantity. We prove useful properties of the expected profit functions in the centralized and decentralized models of the problem, and we utilize these properties to develop alternative incentive schemes for win–win solutions. Our analysis allows us to quantify the value of coordination and, hence, to identify additional opportunities for the vendor to improve his/her profits by potentially turning a nonprofitable transaction into a profitable one through the use of an appropriate tariff schedule or a vendor‐managed delivery contract. We demonstrate that financial gain associated with these opportunities is truly tangible under a vendor‐managed delivery arrangement that potentially improves the centralized solution. Although we take the viewpoint of supply chain coordination and our goal is to provide insights about the effect of transportation considerations on the channel coordination objective and contractual agreements, the paper also contributes to the literature by analyzing and developing efficient approaches for solving the centralized problem with stepwise freight costs in the single‐period setting. © 2006 Wiley Periodicals, Inc. Naval Research Logistics, 2006  相似文献   

5.
In this paper, we study a m‐parallel machine scheduling problem with a non‐crossing constraint motivated by crane scheduling in ports. We decompose the problem to allow time allocations to be determined once crane assignments are known and construct a backtracking search scheme that manipulates domain reduction and pruning strategies. Simple approximation heuristics are developed, one of which guarantees solutions to be at most two times the optimum. For large‐scale problems, a simulated annealing heuristic that uses random neighborhood generation is provided. Computational experiments are conducted to test the algorithms. © 2006 Wiley Periodicals, Inc. Naval Research Logistics, 2007.  相似文献   

6.
We consider the problem of safely and swiftly navigating through a spatial arrangement of potential hazard detections in which each detection has associated with it a probability that the detection is indeed a true hazard. When in close proximity to a detection, we assume the ability—for a cost—to determine whether or not the hazard is real. Our approach to this problem involves a new object, the random disambiguation path (RDP), which is a curve‐valued random variable parametrized by a binary tree with particular properties. We prove an admissibility result showing that there is positive probability that the use of an RDP reduces the expected traversal length compared to the conventional shortest zero‐risk path, and we introduce a practically computable additive‐constant approximation to the optimal RDP. The theoretical considerations are complemented by simulation and example. © 2005 Wiley Periodicals, Inc. Naval Research Logistics, 2005  相似文献   

7.
We consider the problem of nonparametric multi-product dynamic pricing with unknown demand and show that the problem may be formulated as an online model-free stochastic program, which can be solved by the classical Kiefer-Wolfowitz stochastic approximation (KWSA) algorithm. We prove that the expected cumulative regret of the KWSA algorithm is bounded above by where κ1, κ2 are positive constants and T is the number of periods for any T = 1, 2, … . Therefore, the regret of the KWSA algorithm grows in the order of , which achieves the lower bounds known for parametric dynamic pricing problems and shows that the nonparametric problems are not necessarily more difficult to solve than the parametric ones. Numerical experiments further demonstrate the effectiveness and efficiency of our proposed KW pricing policy by comparing with some pricing policies in the literature.  相似文献   

8.
We consider the problem of rescheduling n jobs to minimize the makespan on m parallel identical processors when m changes value. We show this problem to be NP-hard in general. Call a list schedule totally optimal if it is optimal for all m = 1, …,n. When n is less than 6, there always exists a totally optimal schedule, but for n ≥ 6 this can fail. We show that an exact solution is less robust than the largest processing time first (LPT) heuristic and discuss implications for polynomial approximation schemes and hierarchical planning models.  相似文献   

9.
Until recently, fast algorithms for the maximum flow problem have typically proceeded by constructing layered networks and establishing blocking flows in these networks. However, in recent years, new distance-directed algorithms have been suggested that do not construct layered networks but instead maintain a distance label with each node. The distance label of a node is a lower bound on the length of the shortest augmenting path from the node to the sink. In this article we develop two distance-directed augmenting path algorithms for the maximum flow problem. Both the algorithms run in O(n2m) time on networks with n nodes and m arcs. We also point out the relationship between the distance labels and layered networks. Using a scaling technique, we improve the complexity of our distance-directed algorithms to O(nm log U), where U denotes the largest arc capacity. We also consider applications of these algorithms to unit capacity maximum flow problems and a class of parametric maximum flow problems.  相似文献   

10.
Suppose we are given a network G=(V,E) with arc distances and a linear cost function for lengthening arcs. In this note, we consider a network-interdiction problem in which the shortest path from source node s to sink node t is to be increased to at least τ units via a least-cost investment strategy. This problem is shown to reduce to a simple minimum-cost-flow problem. Applications and generalizations are discussed, including the multiple-destination case.  相似文献   

11.
We consider scheduling a set of jobs with deadlines to minimize the total weighted late work on a single machine, where the late work of a job is the amount of processing of the job that is scheduled after its due date and before its deadline. This is the first study on scheduling with the late work criterion under the deadline restriction. In this paper, we show that (i) the problem is unary NP‐hard even if all the jobs have a unit weight, (ii) the problem is binary NP‐hard and admits a pseudo‐polynomial‐time algorithm and a fully polynomial‐time approximation scheme if all the jobs have a common due date, and (iii) some special cases of the problem are polynomially solvable.  相似文献   

12.
In this article we consider the unweighted m-center problem with rectilinear distance. We preent an O(nm–2 log n) algorithm for the m-center problem where m ≥ 4.  相似文献   

13.
In this paper, we present a continuous time optimal control model for studying a dynamic pricing and inventory control problem for a make‐to‐stock manufacturing system. We consider a multiproduct capacitated, dynamic setting. We introduce a demand‐based model where the demand is a linear function of the price, the inventory cost is linear, the production cost is an increasing strictly convex function of the production rate, and all coefficients are time‐dependent. A key part of the model is that no backorders are allowed. We introduce and study an algorithm that computes the optimal production and pricing policy as a function of the time on a finite time horizon, and discuss some insights. Our results illustrate the role of capacity and the effects of the dynamic nature of demand in the model. © 2007 Wiley Periodicals, Inc. Naval Research Logistics, 2007  相似文献   

14.
In this paper, we consider a new weapon‐target allocation problem with the objective of minimizing the overall firing cost. The problem is formulated as a nonlinear integer programming model, but it can be transformed into a linear integer programming model. We present a branch‐and‐price algorithm for the problem employing the disaggregated formulation, which has exponentially many columns denoting the feasible allocations of weapon systems to each target. A greedy‐style heuristic is used to get some initial columns to start the column generation. A branching strategy compatible with the pricing problem is also proposed. Computational results using randomly generated data show this approach is promising for the targeting problem. © 2007 Wiley Periodicals, Inc. Naval Research Logistics, 2007  相似文献   

15.
We consider a problem of scheduling jobs on m parallel machines. The machines are dedicated, i.e., for each job the processing machine is known in advance. We mainly concentrate on the model in which at any time there is one unit of an additional resource. Any job may be assigned the resource and this reduces its processing time. A job that is given the resource uses it at each time of its processing. No two jobs are allowed to use the resource simultaneously. The objective is to minimize the makespan. We prove that the two‐machine problem is NP‐hard in the ordinary sense, describe a pseudopolynomial dynamic programming algorithm and convert it into an FPTAS. For the problem with an arbitrary number of machines we present an algorithm with a worst‐case ratio close to 3/2, and close to 3, if a job can be given several units of the resource. For the problem with a fixed number of machines we give a PTAS. Virtually all algorithms rely on a certain variant of the linear knapsack problem (maximization, minimization, multiple‐choice, bicriteria). © 2008 Wiley Periodicals, Inc. Naval Research Logistics, 2008  相似文献   

16.
We study a knapsack problem with an additional minimum filling constraint, such that the total weight of selected items cannot be less than a given threshold. The problem has several applications in shipping, e‐commerce, and transportation service procurement. When the threshold equals the knapsack capacity, even finding a feasible solution to the problem is NP‐hard. Therefore, we consider the case when the ratio α of threshold to capacity is less than 1. For this case, we develop an approximation scheme that returns a feasible solution with a total profit not less than (1 ‐ ε) times the total profit of an optimal solution for any ε > 0, and with a running time polynomial in the number of items, 1/ε, and 1/(1‐α). © 2012 Wiley Periodicals, Inc. Naval Research Logistics, 2013  相似文献   

17.
We consider the salvo policy problem, in which there are k moments, called salvos, at which we can fire multiple missiles simultaneously at an incoming object. Each salvo is characterized by a probability pi: the hit probability of a single missile. After each salvo, we can assess whether the incoming object is still active. If it is, we fire the missiles assigned to the next salvo. In the salvo policy problem, the goal is to assign at most n missiles to salvos in order to minimize the expected number of missiles used. We consider three problem versions. In Gould's version, we have to assign all n missiles to salvos. In the Big Bomb version, a cost of B is incurred when all salvo's are unsuccessful. Finally, we consider the Quota version in which the kill probability should exceed some quota Q. We discuss the computational complexity and the approximability of these problem versions. In particular, we show that Gould's version and the Big Bomb version admit pseudopolynomial time exact algorithms and fully polynomial time approximation schemes. We also present an iterative approximation algorithm for the Quota version, and show that a related problem is NP-complete.  相似文献   

18.
This article describes a new procedure for estimating parameters of a stochastic activity network of N arcs. The parameters include the probability that path m is the longest path, the probability that path m is the shortest path, the probability that arc i is on the longest path, and the probability that arc i is on the shortest path. The proposed procedure uses quasirandom points together with information on a cutset ? of the network to produce an upper bound of O[(log K)N?|?|+1/K] on the absolute error of approximation, where K denotes the number of replications. This is a deterministic bound and is more favorable than the convergence rate of 1/K1/2 that one obtains from the standard error for K independent replications using random sampling. It is also shown how series reduction can improve the convergence rate by reducing the exponent on log K. The technique is illustrated using a Monte Carlo sampling experiment for a network of 16 relevant arcs with a cutset of ? = 7 arcs. The illustration shows the superior performance of using quasirandom points with a cutset (plan A) and the even better performance of using quasirandom points with the cutset together with series reduction (plan B) with regard to mean square error. However, it also shows that computation time considerations favor plan A when K is small and plan B when K is large.  相似文献   

19.
This paper addresses the problem of finding a feasible schedule of n jobs on m parallel machines, where each job has a deadline and some jobs are preassigned to some machine. This problem arises in the daily assignment of workload to a set of flight dispatchers, and it is strongly characterized by the fact that the job lengths may assume one out of k different values, for small k. We prove the problem to be NP‐complete for k = 2 and propose an effective implicit enumeration algorithm which allows efficiently solution a set of real‐life instances. © 2000 John Wiley & Sons, Inc. Naval Research Logistics 47: 359–376, 2000  相似文献   

20.
This paper examines scheduling problems in which the setup phase of each operation needs to be attended by a single server, common for all jobs and different from the processing machines. The objective in each situation is to minimize the makespan. For the processing system consisting of two parallel dedicated machines we prove that the problem of finding an optimal schedule is N P‐hard in the strong sense even if all setup times are equal or if all processing times are equal. For the case of m parallel dedicated machines, a simple greedy algorithm is shown to create a schedule with the makespan that is at most twice the optimum value. For the two machine case, an improved heuristic guarantees a tight worst‐case ratio of 3/2. We also describe several polynomially solvable cases of the later problem. The two‐machine flow shop and the open shop problems with a single server are also shown to be N P‐hard in the strong sense. However, we reduce the two‐machine flow shop no‐wait problem with a single server to the Gilmore—Gomory traveling salesman problem and solve it in polynomial time. © 2000 John Wiley & Sons, Inc. Naval Research Logistics 47: 304–328, 2000  相似文献   

设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号