首页 | 本学科首页   官方微博 | 高级检索  
相似文献
 共查询到20条相似文献,搜索用时 15 毫秒
1.
The quay crane scheduling problem consists of determining a sequence of unloading and loading movements for cranes assigned to a vessel in order to minimize the vessel completion time as well as the crane idle times. Idle times originate from interferences between cranes since these roll on the same rails and a minimum safety distance must be maintained between them. The productivity of container terminals is often measured in terms of the time necessary to load and unload vessels by quay cranes, which are the most important and expensive equipment used in ports. We formulate the quay crane scheduling problem as a vehicle routing problem with side constraints, including precedence relationships between vertices. For small size instances our formulation can be solved by CPLEX. For larger ones we have developed a branch‐and‐cut algorithm incorporating several families of valid inequalities, which exploit the precedence constraints between vertices. © 2005 Wiley Periodicals, Inc. Naval Research Logistics, 2006  相似文献   

2.
This article treats the problem of scheduling multiple cranes processing jobs along a line, where cranes are divided into different groups and only cranes in the same group can interfere with each other. Such crane scheduling problems occur, for example, at indented berths or in container yards where double rail‐mounted gantry cranes stack containers such that cranes of the same size can interfere with each other but small cranes can pass underneath larger ones. We propose a novel algorithm based on Benders decomposition to solve this problem to optimality. In a computational study, it is shown that this algorithm solves small and medium‐sized instances and even many large instances within a few seconds or minutes. Moreover, it improves several best known solutions from the literature with regard to the simpler problem version with only one crane group. We also look into whether investment in more complicated crane configurations with multiple crane groups is actually worthwhile.  相似文献   

3.
The quay crane scheduling problem consists of scheduling tasks for loading and unloading containers on cranes that are assigned to a vessel for its service. This article introduces a new approach for quay crane scheduling, where the availability of cranes at a vessel is restricted to certain time windows. The problem is of practical relevance, because container terminal operators frequently redeploy cranes among vessels to speed up the service of high‐priority vessels while serving low‐priority vessels casually. This article provides a mathematical formulation of the problem and a tree‐search‐based heuristic solution method. A computational investigation on a large set of test instances is used to evaluate the performance of the heuristic and to identify the impact of differently structured crane time windows on the achievable vessel handling time. © 2011 Wiley Periodicals, Inc. Naval Research Logistics, 2011  相似文献   

4.
In this article, we propose a branch‐and‐price‐and‐cut (BPC) algorithm to exactly solve the manpower routing problem with synchronization constraints (MRPSC). Compared with the classical vehicle routing problems (VRPs), the defining characteristic of the MRPSC is that multiple workers are required to work together and start at the same time to carry out a job, that is, the routes of the scheduling subjects are dependent. The incorporation of the synchronization constraints increases the difficulty of the MRPSC significantly and makes the existing VRP exact algorithm inapplicable. Although there are many types of valid inequalities for the VRP or its variants, so far we can only adapt the infeasible path elimination inequality and the weak clique inequality to handle the synchronization constraints in our BPC algorithm. The experimental results at the root node of the branch‐and‐bound tree show that the employed inequalities can effectively improve the lower bound of the problem. Compared with ILOG CPLEX, our BPC algorithm managed to find optimal solutions for more test instances within 1 hour. © 2016 Wiley Periodicals, Inc. Naval Research Logistics 63: 138–171, 2016  相似文献   

5.
In many practical situations of production scheduling, it is either necessary or recommended to group a large number of jobs into a relatively small number of batches. A decision needs to be made regarding both the batching (i.e., determining the number and the size of the batches) and the sequencing (of batches and of jobs within batches). A setup cost is incurred whenever a batch begins processing on a given machine. This paper focuses on batch scheduling of identical processing‐time jobs, and machine‐ and sequence‐independent setup times on an m‐machine flow‐shop. The objective is to find an allocation to batches and their schedule in order to minimize flow‐time. We introduce a surprising and nonintuitive solution for the problem. © 2004 Wiley Periodicals, Inc. Naval Research Logistics, 2004  相似文献   

6.
We consider scheduling a set of jobs with deadlines to minimize the total weighted late work on a single machine, where the late work of a job is the amount of processing of the job that is scheduled after its due date and before its deadline. This is the first study on scheduling with the late work criterion under the deadline restriction. In this paper, we show that (i) the problem is unary NP‐hard even if all the jobs have a unit weight, (ii) the problem is binary NP‐hard and admits a pseudo‐polynomial‐time algorithm and a fully polynomial‐time approximation scheme if all the jobs have a common due date, and (iii) some special cases of the problem are polynomially solvable.  相似文献   

7.
This paper presents a branch‐and‐price algorithm for scheduling n jobs on m nonhomogeneous parallel machines with multiple time windows. An additional feature of the problem is that each job falls into one of ρ priority classes and may require two operations. The objective is to maximize the weighted number of jobs scheduled, where a job in a higher priority class has “infinitely” more weight or value than a job in a lower priority class. The methodology makes use of a greedy randomized adaptive search procedure (GRASP) to find feasible solutions during implicit enumeration and a two‐cycle elimination heuristic when solving the pricing subproblems. Extensive computational results are presented based on data from an application involving the use of communications relay satellites. Many 100‐job instances that were believed to be beyond the capability of exact methods, were solved within minutes. © 2005 Wiley Periodicals, Inc. Naval Research Logistics, 2006  相似文献   

8.
We address the capacitated lot‐sizing and scheduling problem with setup times, setup carry‐over, back‐orders, and parallel machines as it appears in a semiconductor assembly facility. The problem can be formulated as an extension of the capacitated lot‐sizing problem with linked lot‐sizes (CLSPL). We present a mixed integer (MIP) formulation of the problem and a new solution procedure. The solution procedure is based on a novel “aggregate model,” which uses integer instead of binary variables. The model is embedded in a period‐by‐period heuristic and is solved to optimality or near‐optimality in each iteration using standard procedures (CPLEX). A subsequent scheduling routine loads and sequences the products on the parallel machines. Six variants of the heuristic are presented and tested in an extensive computational study. © 2009 Wiley Periodicals, Inc. Naval Research Logistics 2009  相似文献   

9.
We consider the scheduling problem in a make‐to‐stock queue with two demand classes that can be differentiated based on their variability. One class experiences Poisson arrivals and the other class experiences hyperexponential renewal arrivals. We provide an exact analysis of the case where the demand class with higher variability is given non‐preemptive priority. The results are then used to compare the inventory cost performance of three scheduling disciplines, first‐come first‐serve and priority to either class. We then build on an existing dynamic scheduling heuristic to propose a modification that works well for our system. Extensions of the heuristic to more than two classes and to the case where demand state is known are also discussed. © 2006 Wiley Periodicals, Inc. Naval Research Logistics, 2006.  相似文献   

10.
We consider a problem of scheduling jobs on m parallel machines. The machines are dedicated, i.e., for each job the processing machine is known in advance. We mainly concentrate on the model in which at any time there is one unit of an additional resource. Any job may be assigned the resource and this reduces its processing time. A job that is given the resource uses it at each time of its processing. No two jobs are allowed to use the resource simultaneously. The objective is to minimize the makespan. We prove that the two‐machine problem is NP‐hard in the ordinary sense, describe a pseudopolynomial dynamic programming algorithm and convert it into an FPTAS. For the problem with an arbitrary number of machines we present an algorithm with a worst‐case ratio close to 3/2, and close to 3, if a job can be given several units of the resource. For the problem with a fixed number of machines we give a PTAS. Virtually all algorithms rely on a certain variant of the linear knapsack problem (maximization, minimization, multiple‐choice, bicriteria). © 2008 Wiley Periodicals, Inc. Naval Research Logistics, 2008  相似文献   

11.
We study a deterministic two‐machine flowshop scheduling problem with an assumption that one of the two machines is not available in a specified time period. This period can be due to a breakdown, preventive maintenance, or processing unfinished jobs from a previous planning horizon. The problem is known to be NP‐hard. Pseudopolynomial dynamic programming algorithms and heuristics with worst case error bounds are given in the literature to solve the problem. They are different for the cases when the unavailability interval is for the first or second machine. The existence of a fully polynomial time approximation scheme (FPTAS) was formulated as an open conjecture in the literature. In this paper, we show that the two cases of the problem under study are equivalent to similar partition type problems. Then we derive a generic FPTAS for the latter problems with O(n54) time complexity. © 2003 Wiley Periodicals, Inc. Naval Research Logistics, 2004.  相似文献   

12.
We consider problem of scheduling jobs on‐line on batch processing machines with dynamic job arrivals to minimize makespan. A batch machine can handle up to B jobs simultaneously. The jobs that are processed together from a batch, and all jobs in a batch start and complete at the same time. The processing time of a batch is given by the longest processing time of any job in the batch. Each job becomes available at its arrival time, which is unknown in advance, and its processing time becomes known upon its arrival. In the first part of this paper, we address the single batch processing machine scheduling problem. First we deal with two variants: the unbounded model where B is sufficiently large and the bounded model where jobs have two distinct arrival times. For both variants, we provide on‐line algorithms with worst‐case ratio (the inverse of the Golden ratio) and prove that these results are the best possible. Furthermore, we generalize our algorithms to the general case and show a worst‐case ratio of 2. We then consider the unbounded case for parallel batch processing machine scheduling. Lower bound are given, and two on‐line algorithms are presented. © 2001 John Wiley & Sons, Inc. Naval Research Logistics 48: 241–258, 2001  相似文献   

13.
We study the problem of minimizing the makespan in no‐wait two‐machine open shops producing multiple products using lot streaming. In no‐wait open shop scheduling, sublot sizes are necessarily consistent; i.e., they remain the same over all machines. This intractable problem requires finding sublot sizes, a product sequence for each machine, and a machine sequence for each product. We develop a dynamic programming algorithm to generate all the dominant schedule profiles for each product that are required to formulate the open shop problem as a generalized traveling salesman problem. This problem is equivalent to a classical traveling salesman problem with a pseudopolynomial number of cities. We develop and test a computationally efficient heuristic for the open shop problem. Our results indicate that solutions can quickly be found for two machine open shops with up to 50 products. © 2005 Wiley Periodicals, Inc. Naval Research Logistics, 2005  相似文献   

14.
This article presents a flexible days‐on and days‐off scheduling problem and develops an exact branch and price (B&P) algorithm to find solutions. The main objective is to minimize the size of the total workforce required to cover time‐varying demand over a planning horizon that may extend up to 12 weeks. A new aspect of the problem is the general restriction that the number of consecutive days on and the number of consecutive days off must each fall within a predefined range. Moreover, the total assignment of working days in the planning horizon cannot exceed some maximum value. In the B&P framework, the master problem is stated as a set covering‐type problem whose columns are generated iteratively by solving one of three different subproblems. The first is an implicit model, the second is a resource constrained shortest path problem, and the third is a dynamic program. Computational experiments using both real‐word and randomly generated data show that workforce reductions up to 66% are possible with highly flexible days‐on and days‐off patterns. When evaluating the performance of the three subproblems, it was found that each yielded equivalent solutions but the dynamic program proved to be significantly more efficient. © 2013 Wiley Periodicals, Inc. Naval Research Logistics 60: 678–701, 2013  相似文献   

15.
In this article, we define a scheduling/packing problem called the Job Splitting Problem, motivated by the practices in the printing industry. There are n types of items to be produced on an m‐slot machine. A particular assignment of the types to the slots is called a “run” configuration and requires a setup cost. Once a run begins, the production continues according to that configuration and the “length” of the run represents the quantity produced in each slot during that run. For each unit of production in excess of demand, there is a waste cost. Our goal is to construct a production plan, i.e., a set of runs, such that the total setup and waste cost is minimized. We show that the problem is strongly NP‐hard and propose two integer programming formulations, several preprocessing steps, and two heuristics. We also provide a worst‐case bound for one of the heuristics. Extensive tests on real‐world and randomly generated instances show that the heuristics are both fast and effective, finding near‐optimal solutions. © 2010 Wiley Periodicals, Inc. Naval Research Logistics, 2010  相似文献   

16.
We consider the problem of scheduling a set of jobs on a single machine subject to random breakdowns. We focus on the preemptive‐repeat model, which addresses the situation where, if a machine breaks down during the processing of a job, the work done on the job prior to the breakdown is lost and the job will have to be started from the beginning again when the machine resumes its work. We allow that (i) the uptimes and downtimes of the machine follow general probability distributions, (ii) the breakdown process of the machine depends upon the job being processed, (iii) the processing times of the jobs are random variables following arbitrary distributions, and (iv) after a breakdown, the processing time of a job may either remain a same but unknown amount, or be resampled according to its probability distribution. We first derive the optimal policy for a class of problems under the criterion to maximize the expected discounted reward earned from completing all jobs. The result is then applied to further obtain the optimal policies for other due date‐related criteria. We also discuss a method to compute the moments and probability distributions of job completion times by using their Laplace transforms, which can convert a general stochastic scheduling problem to its deterministic equivalent. The weighted squared flowtime problem and the maintenance checkup and repair problem are analyzed as applications. © 2004 Wiley Periodicals, Inc. Naval Research Logistics, 2004  相似文献   

17.
In this paper we propose some non‐greedy heuristics and develop an Augmented‐Neural‐Network (AugNN) formulation for solving the classical open‐shop scheduling problem (OSSP). AugNN is a neural network based meta‐heuristic approach that allows integration of domain‐specific knowledge. The OSSP is framed as a neural network with multiple layers of jobs and machines. Input, output and activation functions are designed to enforce the problem constraints and embed known heuristics to generate a good feasible solution fast. Suitable learning strategies are applied to obtain better neighborhood solutions iteratively. The new heuristics and the AugNN formulation are tested on several benchmark problem instances in the literature and on some new problem instances generated in this study. The results are very competitive with other meta‐heuristic approaches, both in terms of solution quality and computational times. © 2005 Wiley Periodicals, Inc. Naval Research Logistics, 2005.  相似文献   

18.
In this article, we address a stochastic generalized assignment machine scheduling problem in which the processing times of jobs are assumed to be random variables. We develop a branch‐and‐price (B&P) approach for solving this problem wherein the pricing problem is separable with respect to each machine, and has the structure of a multidimensional knapsack problem. In addition, we explore two other extensions of this method—one that utilizes a dual‐stabilization technique and another that incorporates an advanced‐start procedure to obtain an initial feasible solution. We compare the performance of these methods with that of the branch‐and‐cut (B&C) method within CPLEX. Our results show that all B&P‐based approaches perform better than the B&C method, with the best performance obtained for the B&P procedure that includes both the extensions aforementioned. We also utilize a Monte Carlo method within the B&P scheme, which affords the use of a small subset of scenarios at a time to estimate the “true” optimal objective function value. Our experimental investigation reveals that this approach readily yields solutions lying within 5% of optimality, while providing more than a 10‐fold savings in CPU times in comparison with the best of the other proposed B&P procedures. © 2014 Wiley Periodicals, Inc. Naval Research Logistics 61: 131–143, 2014  相似文献   

19.
This paper addresses a two‐machine open shop scheduling problem, in which the machines are not continuously available for processing. The processing of an operation affected by a non‐availability interval can be interrupted and resumed later. The objective is to minimize the makespan. We present two polynomial‐time approximation schemes, one of which handles the problem with one non‐availability interval on each machine and the other for the problem with several non‐availability intervals on one of the machines. Problems with a more general structure of the non‐availability intervals are not approximable in polynomial time within a constant factor, unless . © 2005 Wiley Periodicals, Inc. Naval Research Logistics, 2006  相似文献   

20.
In this article we introduce a 2‐machine flowshop with processing flexibility. Two processing modes are available for each task: namely, processing by the designated processor, and processing simultaneously by both processors. The objective studied is makespan minimization. This production environment is encountered in repetitive manufacturing shops equipped with processors that have the flexibility to execute orders either individually or in coordination. In the latter case, the product designer exploits processing synergies between two processors so as to execute a particular task much faster than a dedicated processor. This type of flowshop environment is also encountered in labor‐intensive assembly lines where products moving downstream can be processed either in the designated assembly stations or by pulling together the work teams of adjacent stations. This scheduling problem requires determining the mode of operation of each task, and the subsequent scheduling that preserves the flowshop constraints. We show that the problem is ordinary NP‐complete and obtain an optimal solution using a dynamic programming algorithm with considerable computational requirements for medium and large problems. Then, we present a number of dynamic programming relaxations and analyze their worst‐case error performance. Finally, we present a polynomial time heuristic with worst‐case error performance comparable to that of the dynamic programming relaxations. © 2003 Wiley Periodicals, Inc. Naval Research Logistics, 2004.  相似文献   

设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号