Accelerated life testing (ALT) is commonly used to obtain reliability information about a product in a timely manner. Several stress loading designs have been proposed and recent research interests have emerged concerning the development of equivalent ALT plans. Step‐stress ALT (SSALT) is one of the most commonly used stress loadings because it usually shortens the test duration and reduces the number of required test units. This article considers two fundamental questions when designing a SSALT and provides formal proofs in answer to each. Namely: (1) can a simple SSALT be designed so that it is equivalent to other stress loading designs? (2) when optimizing a multilevel SSALT, does it degenerate to a simple SSALT plan? The answers to both queries, under certain reasonable model assumptions, are shown to be a qualified YES. In addition, we provide an argument to support the rationale of a common practice in designing a SSALT, that is, setting the higher stress level as high as possible in a SSALT plan. © 2012 Wiley Periodicals, Inc. Naval Research Logistics, 2013  相似文献   

2.
We consider optimal test plans involving life distributions with failure‐free life, i.e., where there is an unknown threshold parameter below which no failure will occur. These distributions do not satisfy the regularity conditions and thus the usual approach of using the Fisher information matrix to obtain an optimal accelerated life testing (ALT) plan cannot be applied. In this paper, we assume that lifetime follows a two‐parameter exponential distribution and the stress‐life relationship is given by the inverse power law model. Near‐optimal test plans for constant‐stress ALT under both failure‐censoring and time‐censoring are obtained. We first obtain unbiased estimates for the parameters and give the approximate variance of these estimates for both failure‐censored and time‐censored data. Using these results, the variance for the approximate unbiased estimate of a percentile at a design stress is computed and then minimized to produce the near‐optimal plan. Finally, a numerical example is presented together with simulation results to study the accuracy of the approximate variance given by the proposed plan and show that it outperforms the equal‐allocation plan. © 1999 John Wiley & Sons, Inc. Naval Research Logistics 46: 169–186, 1999  相似文献   

3.
By running life tests at higher stress levels than normal operating conditions, accelerated life testing (ALT) quickly yields information on the lifetime distribution of a test unit. The lifetime at the design stress is then estimated through extrapolation using a regression model. In constant‐stress testing, a unit is tested at a fixed stress level until failure or the termination time point of test, whereas step‐stress testing allows the experimenter to gradually increase the stress levels at some prefixed time points during the test. In this work, the optimal k‐level constant‐stress and step‐stress ALTs are compared for the exponential failure data under complete sampling and Type‐I censoring. The objective is to quantify the advantage of using the step‐stress testing relative to the constant‐stress one. Assuming a log‐linear life–stress relationship with the cumulative exposure model for the effect of changing stress in step‐stress testing, the optimal design points are determined under C/D/A‐optimality criteria. The efficiency of step‐stress testing to constant‐stress one is then discussed in terms of the ratio of optimal objective functions based on the information matrix. © 2013 Wiley Periodicals, Inc. Naval Research Logistics 00: 000–000, 2013  相似文献   

4.
This article presents new tools and methods for finding optimum step‐stress accelerated life test plans. First, we present an approach to calculate the large‐sample approximate variance of the maximum likelihood estimator of a quantile of the failure time distribution at use conditions from a step‐stress accelerated life test. The approach allows for multistep stress changes and censoring for general log‐location‐scale distributions based on a cumulative exposure model. As an application of this approach, the optimum variance is studied as a function of shape parameter for both Weibull and lognormal distributions. Graphical comparisons among test plans using step‐up, step‐down, and constant‐stress patterns are also presented. The results show that depending on the values of the model parameters and quantile of interest, each of the three test plans can be preferable in terms of optimum variance. © 2008 Wiley Periodicals, Inc. Naval Research Logistics, 2008  相似文献   

5.
This paper introduces a general or “distribution‐free” model to analyze the lifetime of components under accelerated life testing. Unlike the accelerated failure time (AFT) models, the proposed model shares the advantage of being “distribution‐free” with the proportional hazard (PH) model and overcomes the deficiency of the PH model not allowing survival curves corresponding to different values of a covariate to cross. In this research, we extend and modify the extended hazard regression (EHR) model using the partial likelihood function to analyze failure data with time‐dependent covariates. The new model can be easily adopted to create an accelerated life testing model with different types of stress loading. For example, stress loading in accelerated life testing can be a step function, cyclic, or linear function with time. These types of stress loadings reduce the testing time and increase the number of failures of components under test. The proposed EHR model with time‐dependent covariates which incorporates multiple stress loadings requires further verification. Therefore, we conduct an accelerated life test in the laboratory by subjecting components to time‐dependent stresses, and we compare the reliability estimation based on the developed model with that obtained from experimental results. The combination of the theoretical development of the accelerated life testing model verified by laboratory experiments offers a unique perspective to reliability model building and verification. © 1999 John Wiley & Sons, Inc. Naval Research Logistics 46: 303–321, 1999  相似文献   

6.
Accelerated life testing (ALT) using multiple stresses is commonly used in practice to resemble the operating stresses at normal operating conditions and obtain failure observations in a much shorter time. However, to date, there is little research into the theory of planning ALT for reliability estimation with multiple stresses. ALT with multiple stresses can result in a large number of stress‐level combinations which presents a challenge for implementation. In this article, we propose an approach for the design of ALT plans with multiple stresses and formulate multistress test plans based on different objectives and practical constraints. We develop a simulated annealing algorithm to efficiently determine the testing plan parameters. We demonstrate the proposed method with examples based on an actual test conducted using three stress types. The obtained optimal test plans are compared with those based on fractional factorial design. © 2013 Wiley Periodicals, Inc. Naval Research Logistics 60: 468–478, 2013  相似文献   

7.
We consider an expansion planning problem for Waste‐to‐Energy (WtE) systems facing uncertainty in future waste supplies. The WtE expansion plans are regarded as strategic, long term decisions, while the waste distribution and treatment are medium to short term operational decisions which can adapt to the actual waste collected. We propose a prediction set uncertainty model which integrates a set of waste generation forecasts and is constructed based on user‐specified levels of forecasting errors. Next, we use the prediction sets for WtE expansion scenario analysis. More specifically, for a given WtE expansion plan, the guaranteed net present value (NPV) is evaluated by computing an extreme value forecast trajectory of future waste generation from the prediction set that minimizes the maximum NPV of the WtE project. This problem is essentially a multiple stage min‐max dynamic optimization problem. By exploiting the structure of the WtE problem, we show this is equivalent to a simpler min‐max optimization problem, which can be further transformed into a single mixed‐integer linear program. Furthermore, we extend the model to optimize the guaranteed NPV by searching over the set of all feasible expansion scenarios, and show that this can be solved by an exact cutting plane approach. We also propose a heuristic based on a constant proportion distribution rule for the WtE expansion optimization model, which reduces the problem into a moderate size mixed‐integer program. Finally, our computational studies demonstrate that our proposed expansion model solutions are very stable and competitive in performance compared to scenario tree approaches. © 2016 Wiley Periodicals, Inc. Naval Research Logistics 63: 47–70, 2016  相似文献   

8.
Modern technology is producing high reliability products. Life testing for such products under normal use condition takes a lot of time to obtain a reasonable number of failures. In this situation a step‐stress procedure is preferred for accelerated life testing. In this paper we assume a Weibull and Lognormal model whose scale parameter depends upon the present level as well as the age at the entry in the present stress level. On the basis of that we propose a parametric model to the life distribution for step‐stress testing and suggest a suitable design to estimate the parameters involved in the model. A simulation study has been done by the proposed model based on maximum likelihood estimation. © 2003 Wiley Periodicals, Inc. Naval Research Logistics, 2003  相似文献   

9.
Accelerated life testing (ALT), enhanced by optimal test plans, has been widely accepted in practice as a quick approach for estimating the reliability of a product. From the estimation result, preventive maintenance schedules can be determined to ensure the performance of the product under its normal operating conditions. By default, maintenance decision‐making is regarded as the last and least rewarding step. However, sometimes the maintenance schedules, such as preventive maintenance intervals, are predetermined due to customer concerns and/or by various mandatory regulations and rules. Under such circumstances, how to accurately estimate the expenditure (e.g., on maintenance or spare parts management) associated with these maintenance requirements becomes an important issue. A viable solution is to incorporate the maintenance requirements into ALT plans. This paper provides an approach for the optimal design of ALT plans oriented by a mandatory periodical replacement schedule subject to a discounted penalty. The objective is to improve the estimation accuracy of the economic impact of this maintenance requirement. A numerical experiment is provided to demonstrate the approach in practical use. © 2008 Wiley Periodicals, Inc. Naval Research Logistics 2009  相似文献   

10.
This article is a sequel to a recent article that appeared in this journal, “An extensible modeling framework for dynamic reassignment and rerouting in cooperative airborne operations” [ 17 ], in which an integer programming formulation to the problem of rescheduling in‐flight assets due to changes in battlespace conditions was presented. The purpose of this article is to present an improved branch‐and‐bound procedure to solve the dynamic resource management problem in a timely fashion, as in‐flight assets must be quickly re‐tasked to respond to the changing environment. To facilitate the rapid generation of attractive updated mission plans, this procedure uses a technique for reducing the solution space, supports branching on multiple decision variables simultaneously, incorporates additional valid cuts to strengthen the minimal network constraints of the original mathematical model, and includes improved objective function bounds. An extensive numerical analysis indicates that the proposed approach significantly outperforms traditional branch‐and‐bound methodologies and is capable of providing improved feasible solutions in a limited time. Although inspired by the dynamic resource management problem in particular, this approach promises to be an effective tool for solving other general types of vehicle routing problems. © 2013 Wiley Periodicals, Inc. Naval Research Logistics, 2013  相似文献   

11.
This study addresses cyclic scheduling in robotic flowshops with bounded work‐in‐process (WIP) levels. The objective is to minimize the cycle time or, equivalently, to maximize the throughput, under the condition that the WIP level is bounded from above by a given integer number. We present several strongly polynomial algorithms for the 2‐cyclic robotic flowshop scheduling problems for various WIP levels. © 2010 Wiley Periodicals, Inc. Naval Research Logistics 58: 1–16, 2011  相似文献   

12.
In this article, we analyze a discrete‐time queue that is motivated from studying hospital inpatient flow management, where the customer count process captures the midnight inpatient census. The stationary distribution of the customer count has no explicit form and is difficult to compute in certain parameter regimes. Using the Stein's method framework, we identify a continuous random variable to approximate the steady‐state customer count. The continuous random variable corresponds to the stationary distribution of a diffusion process with state‐dependent diffusion coefficients. We characterize the error bounds of this approximation under a variety of system load conditions—from lightly loaded to heavily loaded. We also identify the critical role that the service rate plays in the convergence rate of the error bounds. We perform extensive numerical experiments to support the theoretical findings and to demonstrate the approximation quality. In particular, we show that our approximation performs better than those based on constant diffusion coefficients when the number of servers is small, which is relevant to decision making in a single hospital ward.  相似文献   

13.
In this article, we study reliability properties of m‐consecutive‐k‐out‐of‐n: F systems with exchangeable components. We deduce exact formulae and recurrence relations for the signature of the system. Closed form expressions for the survival function and the lifetime distribution as a mixture of the distribution of order statistics are established as well. These representations facilitate the computation of several reliability characteristics of the system for a given exchangeable joint distribution or survival function. Finally, we provide signature‐based stochastic ordering results for the system's lifetime and investigate the IFR preservation property under the formulation of m‐consecutive‐k‐out‐of‐n: F systems. © 2011 Wiley Periodicals, Inc. Naval Research Logistics, 2011  相似文献   

14.
The notion of signature has been widely applied for the reliability evaluation of technical systems that consist of binary components. Multi‐state system modeling is also widely used for representing real life engineering systems whose components can have different performance levels. In this article, the concept of survival signature is generalized to a certain class of unrepairable homogeneous multi‐state systems with multi‐state components. With such a generalization, a representation for the survival function of the time spent by a system in a specific state or above is obtained. The findings of the article are illustrated for multi‐state consecutive‐k‐out‐of‐n system which perform its task at three different performance levels. The generalization of the concept of survival signature to a multi‐state system with multiple types of components is also presented. © 2016 Wiley Periodicals, Inc. Naval Research Logistics 63: 593–599, 2017  相似文献   

15.
We study discrete‐time, parallel queues with two identical servers. Customers arrive randomly at the system and join the queue with the shortest workload that is defined as the total service time required for the server to complete all the customers in the queue. The arrivals are assumed to follow a geometric distribution and the service times are assumed to have a general distribution. It is a no‐jockeying queue. The two‐dimensional state space is truncated into a banded array. The resulting modified queue is studied using the method of probability generating function (pgf) The workload distribution in steady state is obtained in form of pgf. A special case where the service time is a deterministic constant is further investigated. Numerical examples are illustrated. © 2000 John Wiley & Sons, Inc. Naval Research Logistics 47: 440–454, 2000  相似文献   

16.
Plug‐in hybrid electric vehicles (PHEVs), upon market penetration, will create additional recharging loads to the electric power systems. This article considers different recharging scenarios and uses game theoretic models to study the potential impact of the recharging loads on locational marginal prices (wholesale electricity prices). Computational results from a Pennsylvania‐New Jersey‐Maryland Interconnection case study show that, under the existing recharging infrastructures, even a small magnitude of load increase caused by PHEV recharging could have a significant undesirable impact on locational marginal prices. The impact could be mitigated to a varying extent by the availability of possible future recharging infrastructures, including realtime pricing recharging meters, battery stations, or vehicle‐to‐grid technology.© 2010 Wiley Periodicals, Inc. Naval Research Logistics, 2010  相似文献   

17.
We consider a two‐level system in which a warehouse manages the inventories of multiple retailers. Each retailer employs an order‐up‐to level inventory policy over T periods and faces an external demand which is dynamic and known. A retailer's inventory should be raised to its maximum limit when replenished. The problem is to jointly decide on replenishment times and quantities of warehouse and retailers so as to minimize the total costs in the system. Unlike the case in the single level lot‐sizing problem, we cannot assume that the initial inventory will be zero without loss of generality. We propose a strong mixed integer program formulation for the problem with zero and nonzero initial inventories at the warehouse. The strong formulation for the zero initial inventory case has only T binary variables and represents the convex hull of the feasible region of the problem when there is only one retailer. Computational results with a state‐of‐the art solver reveal that our formulations are very effective in solving large‐size instances to optimality. © 2010 Wiley Periodicals, Inc. Naval Research Logistics, 2010  相似文献   

18.
In a typical assemble‐to‐order system, a customer order may request multiple items, and the order may not be filled if any of the requested items are out of stock. A key customer service measure when unfilled orders are backordered is the order‐based backorder level. To evaluate this crucial performance measure, a fundamental question is whether the stationary joint inventory positions follow an independent and uniform distribution. In this context, this is equivalent to the irreducibility of the Markov chain formed by the joint inventory positions. This article presents a necessary and sufficient condition for the irreducibility of such a Markov chain through a set of simultaneous Diophantine equations. This result also leads to sufficient conditions that are more general than those in the published reports. © 2011 Wiley Periodicals, Inc. Naval Research Logistics, 2011  相似文献   

19.
20.
We study a multi‐item capacitated lot‐sizing problem with setup times and pricing (CLSTP) over a finite and discrete planning horizon. In this class of problems, the demand for each independent item in each time period is affected by pricing decisions. The corresponding demands are then satisfied through production in a single capacitated facility or from inventory, and the goal is to set prices and determine a production plan that maximizes total profit. In contrast with many traditional lot‐sizing problems with fixed demands, we cannot, without loss of generality, restrict ourselves to instances without initial inventories, which greatly complicates the analysis of the CLSTP. We develop two alternative Dantzig–Wolfe decomposition formulations of the problem, and propose to solve their relaxations using column generation and the overall problem using branch‐and‐price. The associated pricing problem is studied under both dynamic and static pricing strategies. Through a computational study, we analyze both the efficacy of our algorithms and the benefits of allowing item prices to vary over time. © 2009 Wiley Periodicals, Inc. Naval Research Logistics, 2010  相似文献   