首页 | 本学科首页   官方微博 | 高级检索  
相似文献
 共查询到20条相似文献,搜索用时 187 毫秒
1.
Accelerated life testing (ALT) using multiple stresses is commonly used in practice to resemble the operating stresses at normal operating conditions and obtain failure observations in a much shorter time. However, to date, there is little research into the theory of planning ALT for reliability estimation with multiple stresses. ALT with multiple stresses can result in a large number of stress‐level combinations which presents a challenge for implementation. In this article, we propose an approach for the design of ALT plans with multiple stresses and formulate multistress test plans based on different objectives and practical constraints. We develop a simulated annealing algorithm to efficiently determine the testing plan parameters. We demonstrate the proposed method with examples based on an actual test conducted using three stress types. The obtained optimal test plans are compared with those based on fractional factorial design. © 2013 Wiley Periodicals, Inc. Naval Research Logistics 60: 468–478, 2013  相似文献   

2.
A system deteriorates due to shocks received at random times, each shock causing a random amount of damage which accumulates over time and may result in a system failure. Replacement of a failed system is mandatory, while an operable one may also be replaced. In addition, the shock process causing system deterioration may be controlled by continuous preventive maintenance expenditures. The joint problem of optimal maintenance and replacement is analyzed and it is shown that, under reasonable conditions, optimal maintenance rate is decreasing in the cumulative damage level and that beyond a certain critical level the system should be replaced. Meaningful bounds are established on the optimal policies and an illustrative example is provided.  相似文献   

3.
As a complex system with multiple components usually deteriorates with age, preventive maintenance (PM) is often performed to keep the system functioning in a good state to prolong its effective age. In this study, a nonhomogeneous Poisson process with a power law failure intensity is used to describe the deterioration of a repairable system, and the optimal nonperiodic PM schedule can be determined to minimize the expected total cost per unit time. However, since the determination of such optimal PM policies may involve numerous uncertainties, which typically make the analyses difficult to perform because of the scarcity of data, a Bayesian decision model, which utilizes all available information effectively, is also proposed for determining the optimal PM strategies. A numerical example with a real failure data set is used to illustrate the effectiveness of the proposed approach. The results show that the optimal schedules derived by Bayesian approach are relatively more conservative than that for non‐Bayesian approach because of the uncertainty of the intensity function, and if the intensity function are updated using the collected data set, which indicates more severe deterioration than the prior belief, replacing the entire system instead of frequent PM activities before serious deterioration is suggested. © 2010 Wiley Periodicals, Inc. Naval Research Logistics, 2010  相似文献   

4.
Accelerated life testing (ALT) is commonly used to obtain reliability information about a product in a timely manner. Several stress loading designs have been proposed and recent research interests have emerged concerning the development of equivalent ALT plans. Step‐stress ALT (SSALT) is one of the most commonly used stress loadings because it usually shortens the test duration and reduces the number of required test units. This article considers two fundamental questions when designing a SSALT and provides formal proofs in answer to each. Namely: (1) can a simple SSALT be designed so that it is equivalent to other stress loading designs? (2) when optimizing a multilevel SSALT, does it degenerate to a simple SSALT plan? The answers to both queries, under certain reasonable model assumptions, are shown to be a qualified YES. In addition, we provide an argument to support the rationale of a common practice in designing a SSALT, that is, setting the higher stress level as high as possible in a SSALT plan. © 2012 Wiley Periodicals, Inc. Naval Research Logistics, 2013  相似文献   

5.
In many manufacturing environments, equipment condition has a significant impact on product quality, or yield. This paper presents a semi‐Markov decision process model of a single‐stage production system with multiple products and multiple maintenance actions. The model simultaneously determines maintenance and production schedules, accounting for the fact that equipment condition affects the yield of each product differently. It extends earlier work by allowing the expected time between decision epochs to vary by both action and machine state, by allowing multiple maintenance actions, and by treating the outcome of maintenance as less than certain. Sufficient conditions are developed that ensure the monotonicity of both the optimal production and maintenance actions. While the maintenance conditions closely resemble previously studied conditions for this type of problem, the production conditions represent a significant departure from earlier results. The simultaneous solution method is compared to an approach commonly used in industry, where the maintenance and production problems are treated independently. Solving more than one thousand test problems confirms that the combination of both features of the model—accounting for product differences and solving the problems simultaneously—has a significant impact on performance. © 2007 Wiley Periodicals, Inc. Naval Research Logistics, 2008  相似文献   

6.
Accelerated life testing (ALT) is widely used to determine the failure time distribution of a product and the associated life‐stress relationship in order to predict the product's reliability under normal operating conditions. Many types of stress loadings such as constant‐stress, step‐stress and cyclic‐stress can be utilized when conducting ALT. Extensive research has been conducted on the analysis of ALT data obtained under a specified stress loading. However, the equivalency of ALT experiments involving different stress loadings has not been investigated. In this article, a log‐location‐scale distribution under Type I censoring is considered in planning ALT. An idea is provided for the equivalency of various ALT plans involving different stress loadings. Based on this idea, general equivalent ALT plans and some special types of equivalent ALT plans are explored. For demonstration, a constant‐stress ALT and a ramp‐stress ALT for miniature lamps are presented and their equivalency is investigated. © 2010 Wiley Periodicals, Inc. Naval Research Logistics, 2010  相似文献   

7.
Since a system and its components usually deteriorate with age, preventive maintenance (PM) is often performed to restore or keep the function of a system in a good state. Furthermore, PM is capable of improving the health condition of the system and thus prolongs its effective age. There has been a vast amount of research to find optimal PM policies for deteriorating repairable systems. However, such decisions involve numerous uncertainties and the analyses are typically difficult to perform because of the scarcity of data. It is therefore important to make use of all information in an efficient way. In this article, a Bayesian decision model is developed to determine the optimal number of PM actions for systems which are maintained according to a periodic PM policy. A non‐homogeneous Poisson process with a power law failure intensity is used to describe the deteriorating behavior of the repairable system. It is assumed that the status of the system after a PM is somewhere between as good as new for a perfect repair and as good as old for a minimal repair, and for failures between two preventive maintenances, the system undergoes minimal repairs. Finally, a numerical example is given and the results of the proposed approach are discussed after performing sensitivity analysis. © 2007 Wiley Periodicals, Inc. Naval Research Logistics, 2008  相似文献   

8.
This paper examines various models for maintenance of a machine operating subject to stochastic deterioration. Three alternative models are presented for the deterioration process. For each model, in addition to the replacement decision, the option exists of performing preventive maintenance. The effect of this maintenance is to “slow” the deterioration process. With an appropriate reward structure imposed on the processes, the models are formulated as continuous time Markov decision processes. the optimality criterion being the maximization of expected discounted reward earned over an infinite time horizon. For each model conditions are presented under which the optimal maintenance policy exhibits the following monotonic structure. First, there exists a control limit rule for replacement. That is, there exists a number i* such that if the state of machine deterioration exceeds i* the optimal policy replaces the machine by a new machine. Secondly, prior to replacement the optimal level of preventive maintenance is a nonincreasing function of the state of machine deterioration. The conditions which guarantee this result have a cost/benefit interpretation.  相似文献   

9.
We consider optimal test plans involving life distributions with failure‐free life, i.e., where there is an unknown threshold parameter below which no failure will occur. These distributions do not satisfy the regularity conditions and thus the usual approach of using the Fisher information matrix to obtain an optimal accelerated life testing (ALT) plan cannot be applied. In this paper, we assume that lifetime follows a two‐parameter exponential distribution and the stress‐life relationship is given by the inverse power law model. Near‐optimal test plans for constant‐stress ALT under both failure‐censoring and time‐censoring are obtained. We first obtain unbiased estimates for the parameters and give the approximate variance of these estimates for both failure‐censored and time‐censored data. Using these results, the variance for the approximate unbiased estimate of a percentile at a design stress is computed and then minimized to produce the near‐optimal plan. Finally, a numerical example is presented together with simulation results to study the accuracy of the approximate variance given by the proposed plan and show that it outperforms the equal‐allocation plan. © 1999 John Wiley & Sons, Inc. Naval Research Logistics 46: 169–186, 1999  相似文献   

10.
对加速寿命试验设计优化的相关知识进行研究分析,确定以竞争失效产品恒应力加速寿命试验为应用背景。在对加速寿命试验统计分析深入研究的基础上,通过分析方案要素、约束条件等建立优化目标函数,提出基于模拟退火算法的优化方法和具体实现思路。最后通过实例验证方法的可行性和实用性。  相似文献   

11.
分析了传统的统一调度下和电力市场环境下发电厂机组检修计划的不同,在此基础上提出不同于以往的检修计划方法。以检修费用、电价收益损失和违约金之和最小为目标函数,然后采用0-1整数规划的直接枚举法求解。最后通过算例论证了该方法的可行性。  相似文献   

12.
This paper finds the optimal integrated production schedule and preventive maintenance plan for a single machine exposed under a cumulative damage process, and investigates how the optimal preventive maintenance plan interacts with the optimal production schedule. The goal is to minimize the total tardiness. The optimal policy possesses the following properties: Under arbitrary maintenance plan when jobs have common processing time, and different due dates, the optimal production schedule is to order the jobs by earliest due date first rule; and when jobs have common due date and different processing times, the optimal production schedule is shortest processing time first. The optimal maintenance plan is of control limit type under any arbitrary production schedule when machine is exposed under a cumulative damage failure process. Numerical studies on the optimal maintenance control limit of the maintenance plan indicate that as the number of jobs to be scheduled increases, the effect of jobs due dates on the optimal maintenance control limit diminishes. © 2007 Wiley Periodicals, Inc. Naval Research Logistics, 2007  相似文献   

13.
We study joint preventive maintenance (PM) and production policies for an unreliable production‐inventory system in which maintenance/repair times are non‐negligible and stochastic. A joint policy decides (a) whether or not to perform PM and (b) if PM is not performed, then how much to produce. We consider a discrete‐time system, formulating the problem as a Markov decision process (MDP) model. The focus of the work is on the structural properties of optimal joint policies, given the system state comprised of the system's age and the inventory level. Although our analysis indicates that the structure of optimal joint policies is very complex in general, we are able to characterize several properties regarding PM and production, including optimal production/maintenance actions under backlogging and high inventory levels, and conditions under which the PM portion of the joint policy has a control‐limit structure. In further special cases, such as when PM set‐up costs are negligible compared to PM times, we are able to establish some additional structural properties. © 2005 Wiley Periodicals, Inc. Naval Research Logistics, 2005.  相似文献   

14.
In this article we formulate an analytical model of preventive maintenance and safety stock strategies in a production environment subject to random machine breakdowns. Traditionally, preventive maintenance and safety stocks have been independently studied as two separate strategies for coping with machine breakdowns. Our intent is to develop a unified framework so that the two are jointly considered. We illustrate the trade-off between investing in the two options. In addition, we provide optimality conditions under which either one or both strategies should be implemented to minimize the associated cost function. Specifically, cases with deterministic and exponential repair time distributions are analyzed in detail. We include numerical examples to illustrate the determination of optimal strategies for preventive maintenance and safety stocks. © 1997 John Wiley & Sons, Inc.  相似文献   

15.
加速寿命试验(ALT)可在较短时间内获得产品的寿命及可靠性信息.利用ALT对产品的剩余寿命进行评估时,常常将已工作过的产品进行抽样并投入试验,在这一类样本的ALT数据统计分析时如何处理初始工作时间,成为ALT应用中的一个重要问题.工程实际中评估此类样本的剩余寿命时常常忽略初始工作时间,将其视为"用后如新"或"无记忆性"产品.但此假设必须以产品寿命服从指数分布为前提,而大部分机电产品的寿命服从Weibull分布,因而该方法在应用时必然会产生较大误差.针对这一问题提出了一种新的基于时间折算的ALT数据统计分析方法,并利用Monte Carlo仿真对其估计特性进行对比研究,结果表明此方法能有效评估存在初始工作历程产品的剩余寿命,估计精度优于原方法.  相似文献   

16.
We consider the problem of optimally maintaining a stochastically degrading, single‐unit system using heterogeneous spares of varying quality. The system's failures are unannounced; therefore, it is inspected periodically to determine its status (functioning or failed). The system continues in operation until it is either preventively or correctively maintained. The available maintenance options include perfect repair, which restores the system to an as‐good‐as‐new condition, and replacement with a randomly selected unit from the supply of heterogeneous spares. The objective is to minimize the total expected discounted maintenance costs over an infinite time horizon. We formulate the problem using a mixed observability Markov decision process (MOMDP) model in which the system's age is observable but its quality must be inferred. We show, under suitable conditions, the monotonicity of the optimal value function in the belief about the system quality and establish conditions under which finite preventive maintenance thresholds exist. A detailed computational study reveals that the optimal policy encourages exploration when the system's quality is uncertain; the policy is more exploitive when the quality is highly certain. The study also demonstrates that substantial cost savings are achieved by utilizing our MOMDP‐based method as compared to more naïve methods of accounting for heterogeneous spares.  相似文献   

17.
针对寿命服从双参数Weibull分布的机电产品,进行单应力、定时转换的步进加速寿命试验,研究加速寿命试验数据下的可靠性评估问题。考虑到外场多应力环境与实验室单一应力环境之间的差异性,构建基于修正系数的分布参数计算模型;开展步进加速寿命试验过程的统计分析,建立各应力下的累计分布函数关系;构建极大似然函数,运用数值迭代法,求解未知参数估计;结合某型机电产品进行仿真方案设计,采用Monte Carlo仿真方法产生样本数据,通过对比分析说明所提出的模型评估精度更高。  相似文献   

18.
The ability to cope with uncertainty in dynamic scheduling environments is becoming an increasingly important issue. In such environments, any disruption in the production schedule will translate into a disturbance of the plans for several external activities as well. Hence, from a practical point of view, deviations between the planned and realized schedules are to be avoided as much as possible. The term stability refers to this concern. We propose a proactive approach to generate efficient and stable schedules for a job shop subject to processing time variability and random machine breakdowns. In our approach, efficiency is measured by the makespan, and the stability measure is the sum of the variances of the realized completion times. Because the calculation of the original measure is mathematically intractable, we develop a surrogate stability measure. The version of the problem with the surrogate stability measure is proven to be NP‐hard, even without machine breakdowns; a branch‐and‐bound algorithm is developed for this problem variant. A tabu search algorithm is proposed to handle larger instances of the problem with machine breakdowns. The results of extensive computational experiments indicate that the proposed algorithms are quite promising in performance. © 2011 Wiley Periodicals, Inc. Naval Research Logistics, 2011  相似文献   

19.
设备的一种计划维修策略   总被引:1,自引:0,他引:1  
本文根据设备在全寿命内有事后修理、计划修理和最后报废的实际情况,以全寿命内单位时间的更新维修期望费用最少为目标函数,建立一种数学模型,寻求设备在全寿命内最佳计划修理次数N和最佳的一组计划维修时间间隔集T。  相似文献   

20.
In this article, we consider a multi‐product closed‐loop supply chain network design problem where we locate collection centers and remanufacturing facilities while coordinating the forward and reverse flows in the network so as to minimize the processing, transportation, and fixed location costs. The problem of interest is motivated by the practice of an original equipment manufacturer in the automotive industry that provides service parts for vehicle maintenance and repair. We provide an effective problem formulation that is amenable to efficient Benders reformulation and an exact solution approach. More specifically, we develop an efficient dual solution approach to generate strong Benders cuts, and, in addition to the classical single Benders cut approach, we propose three different approaches for adding multiple Benders cuts. These cuts are obtained via dual problem disaggregation based either on the forward and reverse flows, or the products, or both. We present computational results which illustrate the superior performance of the proposed solution methodology with multiple Benders cuts in comparison to the branch‐and‐cut approach as well as the traditional Benders decomposition approach with a single cut. In particular, we observe that the use of multiple Benders cuts generates stronger lower bounds and promotes faster convergence to optimality. We also observe that if the model parameters are such that the different costs are not balanced, but, rather, are biased towards one of the major cost categories (processing, transportation or fixed location costs), the time required to obtain the optimal solution decreases considerably when using the proposed solution methodology as well as the branch‐and‐cut approach. © 2007 Wiley Periodicals, Inc. Naval Research Logistics, 2007  相似文献   

设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号