首页 | 本学科首页   官方微博 | 高级检索  
相似文献
 共查询到20条相似文献,搜索用时 475 毫秒
1.
We present a shifting bottleneck heuristic for minimizing the total weighted tardiness in a job shop. The method decomposes the job shop into a number of single‐machine subproblems that are solved one after another. Each machine is scheduled according to the solution of its corresponding subproblem. The order in which the single machine subproblems are solved has a significant impact on the quality of the overall solution and on the time required to obtain this solution. We therefore test a number of different orders for solving the subproblems. Computational results on 66 instances with ten jobs and ten machines show that our heuristic yields solutions that are close to optimal, and it clearly outperforms a well‐known dispatching rule enhanced with backtracking mechanisms. © 1999 John Wiley & Sons, Inc. Naval Research Logistics 46: 1–17, 1999  相似文献   

2.
We consider the problem of sequencing jobs on a single machine while minimizing a nondecreasing function of two criteria. We develop a heuristic procedure that quickly finds a good solution for bicriteria scheduling. The procedure is based on using several arcs in the criterion space that are representative of the possible locations of nondominated solutions. By sampling a small number of points on these arcs, a promising point is identified in the criterion space for each arc. An efficient sequence in the neighborhood of each of the promising points is found and the best of these efficient sequences is selected as the heuristic solution. We implement the procedure for two different bicriteria scheduling problems: (i) minimizing total flowtime and maximum tardiness and (ii) minimizing total flowtime and maximum earliness. The computational experience on a wide variety of problem instances show that the heuristic approach is very robust and yields good solutions. © 1999 John Wiley & Sons, Inc. Naval Research Logistics 46: 777–789, 1999  相似文献   

3.
Resource-constrained project scheduling with cash flows occurs in many settings, ranging from research and development to commercial and residential construction. Although efforts have been made to develop efficient optimal procedures to maximize the net present value of cash flows for resource-constrained projects, the inherent intractability of the problem has led to the development of a variety of heuristic methods to aid in the development of near-optimal schedules for large projects. This research focuses on the use of insights gained from the solution of a relaxed optimization model in developing heuristic procedures to schedule projects with multiple constrained resources. It is shown that a heuristic procedure with embedded priority rules that uses information from the revised solution of a relaxed optimization model increases project net present value. The heuristic procedure and nine different embedded priority rules are tested in a variety of project environments that account for different network structures, levels of resource constrainedness, and cash-flow parameters. Extensive testing with problems ranging in size from 21 to 1000 activities shows that the new heuristic procedures dominate heuristics using information from the critical path method (CPM), and in most cases outperform heuristics from previous research. The best performing heuristic rules classify activities into priority and secondary queues according to whether they lead to immediate progress payments, thus front loading the project schedule. © 1997 John Wiley & Sons, Inc. Naval Research Logistics 44: 365–381, 1997  相似文献   

4.
This paper examines the (n, m) scheduling problem with n operations distributed among m machines. An algorithm for solving this problem is presented and, gives a good heuristic solution on a wide class of problems. Computational results are reported which demonstrate the efficiency of this approach.  相似文献   

5.
This papers deals with the classical resource‐constrained project scheduling problem (RCPSP). There, the activities of a project have to be scheduled subject to precedence and resource constraints. The objective is to minimize the makespan of the project. We propose a new heuristic called self‐adapting genetic algorithm to solve the RCPSP. The heuristic employs the well‐known activity list representation and considers two different decoding procedures. An additional gene in the representation determines which of the two decoding procedures is actually used to compute a schedule for an individual. This allows the genetic algorithm to adapt itself to the problem instance actually solved. That is, the genetic algorithm learns which of the alternative decoding procedures is the more successful one for this instance. In other words, not only the solution for the problem, but also the algorithm itself is subject to genetic optimization. Computational experiments show that the mechanism of self‐adaptation is capable to exploit the benefits of both decoding procedures. Moreover, the tests show that the proposed heuristic is among the best ones currently available for the RCPSP. © 2002 Wiley Periodicals, Inc. Naval Research Logistics 49: 433–448, 2002; Published online in Wiley InterScience (www.interscience.wiley.com). DOI 10.1002/nav.10029  相似文献   

6.
The well‐known generalized assignment problem (GAP) involves the identification of a minimum‐cost assignment of tasks to agents when each agent is constrained by a resource in limited supply. The multi‐resource generalized assignment problem (MRGAP) is the generalization of the GAP in which there are a number of different potentially constraining resources associated with each agent. This paper explores heuristic procedures for the MRGAP. We first define a three‐phase heuristic which seeks to construct a feasible solution to MRGAP and then systematically attempts to improve the solution. We then propose a modification of the heuristic for the MRGAP defined previously by Gavish and Pirkul. The third procedure is a hybrid heuristic that combines the first two heuristics, thus capturing their relative strengths. We discuss extensive computational experience with the heuristics. The hybrid procedure is seen to be extremely effective in solving MRGAPs, generating feasible solutions to more than 99% of the test problems and consistently producing near‐optimal solutions. © 2001 John Wiley & Sons, Inc. Naval Research Logistics 48: 468–483, 2001  相似文献   

7.
We address the capacitated lot‐sizing and scheduling problem with setup times, setup carry‐over, back‐orders, and parallel machines as it appears in a semiconductor assembly facility. The problem can be formulated as an extension of the capacitated lot‐sizing problem with linked lot‐sizes (CLSPL). We present a mixed integer (MIP) formulation of the problem and a new solution procedure. The solution procedure is based on a novel “aggregate model,” which uses integer instead of binary variables. The model is embedded in a period‐by‐period heuristic and is solved to optimality or near‐optimality in each iteration using standard procedures (CPLEX). A subsequent scheduling routine loads and sequences the products on the parallel machines. Six variants of the heuristic are presented and tested in an extensive computational study. © 2009 Wiley Periodicals, Inc. Naval Research Logistics 2009  相似文献   

8.
We consider the problem in which a set of products has to be shipped from a common origin to a common destination through one or several intermediate nodes with the objective of minimizing the sum of inventory and transportation costs when a set of possible shipping frequencies is given on each link. From the theoretical point of view, the main issue is the computation of the inventory cost in the intermediate nodes. From the computational point of view, given that the simpler single link problem is known to be NP-hard, we present four classes of heuristic algorithms. The first two classes are based on the decomposition of the sequence in links, the third class on the adaptation of the EOQ-type solution known for the continuous case, and the fourth on the optimal solution of a simpler problem through dynamic programming techniques. Finally, we compare them on a set of randomly generated problem instances. © 1999 John Wiley & Sons, Inc. Naval Research Logistics 46: 399–417, 1999  相似文献   

9.
Consider an “intractable” optimization problem for which no efficient solution technique exists. Given a systematic procedure for generating independent heuristic solutions, we seek to obtain interval estimates for the globally optimal solution using statistical inference. In previous work, accurate point estimates have been derived. Determining interval estimates, however, is a considerably more difficult task. In this paper, we develop straightforward procedures which compute confidence intervals efficiently in order to evaluate heuristic solutions and assess deviations from optimality. The strategy presented is applicable to a host of combinatorial optimization problems. The assumptions of our model, along with computational experience, are discussed.  相似文献   

10.
In this paper, we consider a new weapon–target allocation problem with the objective of minimizing the overall firing cost. The problem is formulated as a nonlinear integer programming model. We applied Lagrangian relaxation and a branch‐and‐bound method to the problem after transforming the nonlinear constraints into linear ones. An efficient primal heuristic is developed to find a feasible solution to the problem to facilitate the procedure. In the branch‐and‐bound method, three different branching rules are considered and the performances are evaluated. Computational results using randomly generated data are presented. © 1999 John Wiley & Sons, Inc. Naval Research Logistics 46: 640–653, 1999  相似文献   

11.
12.
The paper examines all known special cases of the mXn flow-shop problem. It provides solution procedures to three new special cases along with the optimality proofs. The theory of the new special cases is based on the critical path concept.  相似文献   

13.
This paper examines the discrete equal‐capacity p‐median problem that seeks to locate p new facilities (medians) on a network, each having a given uniform capacity, in order to minimize the sum of distribution costs while satisfying the demand on the network. Such problems arise, for example, in local access and transport area telecommunication network design problems where any number of a set of p facility units can be constructed at the specified candidate sites (hence, the net capacity is an integer multiple of a given unit capacity). We develop various valid inequalities, a separation routine for generating cutting planes that are specific members of such inequalities, as well as an enhanced reformulation that constructs a partial convex hull representation that subsumes an entire class of valid inequalities via its linear programming relaxation. We also propose suitable heuristic schemes for this problem, based on sequentially rounding the continuous relaxation solutions obtained for the various equivalent formulations of the problem. Extensive computational results are provided to demonstrate the effectiveness of the proposed valid inequalities, enhanced formulations, and heuristic schemes. The results indicate that the proposed schemes for tightening the underlying relaxations play a significant role in enhancing the performance of both exact and heuristic solution methods for this class of problems. © 2000 John & Sons, Inc. Naval Research Logistics 47: 166–183, 2000.  相似文献   

14.
In this paper the problem of minimizing makespan in a two‐machine openshop is examined. A heuristic algorithm is proposed, and its worst case performance ratio and complexity are analyzed. The average case performance is evaluated using an empirical study. © 1999 John Wiley & Sons, Inc. Naval Research Logistics 46: 129–145, 1999  相似文献   

15.
This article treats the problem of subdividing an area for storing containers such that the workload is evenly shared among the cranes operating the resulting subareas. We consider two crane sets: while noncrossing constraints between cranes of the same set need to be observed, cranes of different sets do not interfere. Such a problem setting is, for instance, relevant for scheduling the (un‐)loading of vessels by parallel quay cranes operating on opposing berths or in container yards with cross‐over cranes. We formalize the resulting optimization problem, prove computational complexity, and present exact and heuristic solution procedures. © 2012 Wiley Periodicals, Inc. Naval Research Logistics, 2012  相似文献   

16.
Multiple-facility loading (MFL) involves the allocation of products among a set of finite-capacity facilities. Applications of MFL arise naturally in a variety of production scheduling environments. MFL models typically assume that capacity is consumed as a linear function of products assigned to a facility. Product similarities and differences, however, result in capacity-based economies or diseconomies of scope, and thus the effective capacity of the facility is often a (nonlinear) function of the set of tasks assigned to the facility. This article addresses the multiple-facility loading problem under capacity-based economies (and diseconomies) of scope (MFLS). We formulate MFLS as a nonlinear 0–1 mixed-integer programming problem, and we discuss some useful properties. MFLS generalizes many well-known combinatorial optimization problems, such as the capacitated facility location problem and the generalized assignment problem. We also define a tabu-search heuristic and a branch-and-bound algorithm for MFLS. The tabu-search heuristic alternates between two search phases, a regional search and a diversification search, and offers a novel approach to solution diversification. We also report computational experience with the procedures. In addition to demonstrating MFLS problem tractability, the computational results indicate that the heuristic is an effective tool for obtaining high-quality solutions to MFLS. © 1997 John Wiley & Sons, Inc. Naval Research Logistics 44: 229–256, 1997  相似文献   

17.
This article describes a heuristic and two exact algorithms for several classes of vehicle routing problems defined on tree networks. These include capacitated and time‐constrained vehicle routing problems. One of the exact algorithms is based on the computation of bin packing lower bounds. The other uses column generation. The first algorithm performs better on problems containing small customer demands and in which all vehicles are identical. Otherwise, the second algorithm is more powerful and more versatile. © 1999 John Wiley & Sons, Inc. Naval Research Logistics 46: 75–89, 1999  相似文献   

18.
We present a large‐scale network design model for the outbound supply chain of an automotive company that considers transportation mode selection (road vs. rail) and explicitly models the relationship between lead times and the volume of flow through the nodes of the network. We formulate the problem as a nonlinear zero‐one integer program, reformulate it to obtain a linear integer model, and develop a Lagrangian heuristic for its solution that gives near‐optimal results in reasonable time. We also present scenario analyses that examine the behavior of the supply chain under different parameter settings and the performance of the solution procedures under different experimental conditions. © 2006 Wiley Periodicals, Inc. Naval Research Logistics, 2007  相似文献   

19.
Resource-constrained project scheduling problems with cash flows (RCPSPCF) are complex, combinatorial optimization problems. Many heuristics have been reported in the literature that produce reasonable schedules in limited project environments. However, the lack of a heuristic that dominates under differing project conditions can lead to a suboptimal choice of an appropriate heuristic for scheduling any given project. This may result in poor schedules and monetary losses. This paper reports on the application of the tabu search metaheuristic procedure for the RCPSPCF. Strategies for neighborhood generation and candidate selection that exploit the special features of the problem are combined with a simple multiheuristic start procedure. Extensive experimentation, with multiple data sets and comparison with an upper bound, indicates a significant improvement, both in project Net Present Value (NPV) as well as the number of projects, where the metaheuristic outperforms the best known heuristics in the literature. More specifically, this procedure produces the best schedules in over 85% of the projects tested, in contrast to the best single-pass heuristics which have been shown to dominate in at most 20% of the same cases. This iterative, general purpose heuristic is able to adapt significantly better to the complex interactions of the many critical parameters of the RCPSPCF than single-pass heuristics that use more specific information about each project environment. © 1999 John Wiley & Sons, Inc. Naval Research Logistics 46: 912–927, 1999  相似文献   

20.
Scheduling a set of n jobs on a single machine so as to minimize the completion time variance is a well‐known NP‐hard problem. In this paper, we propose a sequence, which can be constructed in O(n log n) time, as a solution for the problem. Our primary concern is to establish the asymptotical optimality of the sequence within the framework of probabilistic analysis. Our main result is that, when the processing times are randomly and independently drawn from the same uniform distribution, the sequence is asymptotically optimal in the sense that its relative error converges to zero in probability as n increases. Other theoretical results are also derived, including: (i) When the processing times follow a symmetric structure, the problem has 2⌊(n−1)/2⌋ optimal sequences, which include our proposed sequence and other heuristic sequences suggested in the literature; and (ii) when these 2⌊(n−1)/2⌋ sequences are used as approximate solutions for a general problem, our proposed sequence yields the best approximation (in an average sense) while another sequence, which is commonly believed to be a good approximation in the literature, is interestingly the worst. © 1999 John Wiley & Sons, Inc. Naval Research Logistics 46: 373–398, 1999  相似文献   

设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号