首页 | 本学科首页   官方微博 | 高级检索  
相似文献
 共查询到20条相似文献,搜索用时 125 毫秒
1.
The coordination of production, supply, and distribution is an important issue in logistics and operations management. This paper develops and analyzes a single‐machine scheduling model that incorporates the scheduling of jobs and the pickup and delivery arrangements of the materials and finished jobs. In this model, there is a capacitated pickup and delivery vehicle that travels between the machine and the storage area, and the objective is to minimize the makespan of the schedule. The problem is strongly NP‐hard in general but is solvable in polynomial time when the job processing sequence is predetermined. An efficient heuristic is developed for the general problem. The effectiveness of the heuristic is studied both analytically and computationally. © 2005 Wiley Periodicals, Inc. Naval Research Logistics, 2005.  相似文献   

2.
We study a problem of scheduling products on the same facility, which is motivated by a car paint shop. Items of the same product are identical. Operations on the items are performed sequentially in batches, where each batch is a set of operations on the same product. Some of the produced items are of the required good quality and some items can be defective. Defectiveness of an item is determined by a given simulated function of its product, its preceding product, and the position of its operation in the batch. Defective items are kept in a buffer of a limited capacity, and they are then remanufactured at the same facility. A minimum waiting time exists for any defective item before its remanufacturing can commence. Each product has a sequence independent setup time which precedes its first operation or its operation following an operation of another product. A due date is given for each product such that all items of the same product have the same due date and the objective is to find a schedule which minimizes maximum lateness of product completion times with respect to their due dates. The problem is proved NP‐hard in the strong sense, and a heuristic Group Technology (GT) solution approach is suggested and analyzed. The results justify application of the GT approach to scheduling real car paint shops with buffered rework. © 2014 Wiley Periodicals, Inc. Naval Research Logistics 61: 458–471, 2014  相似文献   

3.
针对星上系统总线多元性导致的星载网络接口和协议不能标准化的发展瓶颈,本文基于SpaceWire总线协议,通过将静态路由(时间触发)与动态路由(事件触发)机制结合,实现了控制数据和载荷数据共用网络。静态路由完全遵循SpaceWire-D协议,在保证确定性传输的同时,通过启发式调度算法首次实现了多时间窗并行调度,并提出利用最大公约数法设计时间窗,以提高网络吞吐量;动态路由通过对随机事件和载荷数据分配优先级,实现传输路径冲突时对紧急任务的优先处理。最后在OPENT中搭建网络系统仿真模型,对所提出的路由机制进行了仿真。实验结果表明,静态路由时段网络吞吐量较现有调度算法有明显提高,动态路由实现了紧急事件优先传输。  相似文献   

4.
This paper presents a new methodology to solve the cyclic preference scheduling problem for hourly workers. The focus is on nurse rostering but is applicable to any organization in which the midterm scheduling decision must take into account a complex of legal, institutional, and preferential constraints. The objective is to strike a balance between satisfying individual preferences and minimizing personnel costs. The common practice is to consider each planning period independently and to generate new rosters at the beginning of each. To reduce some of the instability in the process, there is a growing trend toward cyclic schedules, which are easier to manage and are generally perceived to be more equitable. To address this problem, a new integer programming model is presented that combines the elements of both cyclic and preference scheduling. To find solutions, a branch‐and‐price algorithm is developed that makes use of several branching rules and an extremely effective rounding heuristic. A unique feature of the formulation is that the master problem contains integer rather than binary variables. Computational results are reported for problem instances with up to 200 nurses. Most were solved within 10 minutes and many within 3 minutes when a double aggregation approach was applicable. © 2006 Wiley Periodicals, Inc. Naval Research Logistics, 2007.  相似文献   

5.
A mixed-model multilevel manufacturing facility running under a just-in-time (JIT) production system is controlled by setting the production schedule for the highest level in the facility, which is usually a mixed-model final assembly line. The schedule is set to achieve the goals of the organization, which under JIT are (1) to keep a constant rate of part usage, and (2) to maintain a smooth production load. In this article we extend earlier work in the literature, which focused on the first goal, by developing scheduling procedures which satisfy both goals. Properties of the resulting production schedules are analyzed and illustrative examples are presented.  相似文献   

6.
This paper presents a deterministic approach to schedule patients in an ambulatory surgical center (ASC) such that the number of postanesthesia care unit nurses at the center is minimized. We formulate the patient scheduling problem as new variants of the no‐wait, two‐stage process shop scheduling problem and present computational complexity results for the new scheduling models. Also, we develop a tabu search‐based heuristic algorithm to solve the patient scheduling problem. Our algorithm is shown to be very effective in finding near optimal schedules on a set of real data from a university hospital's ASC. © 2003 Wiley Periodicals, Inc. Naval Research Logistics, 2003  相似文献   

7.
This article provides an efficient heuristic based on decomposition for the twin robots scheduling problem (TRSP). TRSP concerns two moving robots executing storage and retrieval requests in parallel along a shared pathway. The depots are located at both ends of the line and a dedicated robot is assigned to each of them. While moving goods between their respective depots and some storage locations on the line, noncrossing constraints among robots need to be considered. Our heuristic uses a dynamic programming framework to determine the schedule of one robot while keeping the other one's fixed. It finds near‐optimal solutions even for large problem instances with hundreds of jobs in a short time span. © 2014 Wiley Periodicals, Inc. 62:16–22, 2015  相似文献   

8.
We consider the multitasking scheduling problem on unrelated parallel machines to minimize the total weighted completion time. In this problem, each machine processes a set of jobs, while the processing of a selected job on a machine may be interrupted by other available jobs scheduled on the same machine but unfinished. To solve this problem, we propose an exact branch‐and‐price algorithm, where the master problem at each search node is solved by a novel column generation scheme, called in‐out column generation, to maintain the stability of the dual variables. We use a greedy heuristic to obtain a set of initial columns to start the in‐out column generation, and a hybrid strategy combining a genetic algorithm and an exact dynamic programming algorithm to solve the pricing subproblems approximately and exactly, respectively. Using randomly generated data, we conduct numerical studies to evaluate the performance of the proposed solution approach. We also examine the effects of multitasking on the scheduling outcomes, with which the decision maker can justify making investments to adopt or avoid multitasking.  相似文献   

9.
Consider a set of task pairs coupled in time: a first (initial) and second (completion) tasks of known durations with a specified time between them. If the operator or machine performing these tasks is able to process only one at a time, scheduling is necessary to insure that no overlap occurs. This problem has a particular application to production scheduling, transportation, and radar operations (send-receive pulses are ideal examples of time-linked tasks requiring scheduling). This article discusses several candidate techniques for schedule determination, and these are evaluated in a specific radar scheduling application.  相似文献   

10.
We seek dynamic server assignment policies in finite‐capacity queueing systems with flexible and collaborative servers, which involve an assembly and/or a disassembly operation. The objective is to maximize the steady‐state throughput. We completely characterize the optimal policy for a Markovian system with two servers, two feeder stations, and instantaneous assembly and disassembly operations. This optimal policy allocates one server per station unless one of the stations is blocked, in which case both servers work at the unblocked station. For Markovian systems with three stations and instantaneous assembly and/or disassembly operations, we consider similar policies that move a server away from his/her “primary” station only when that station is blocked or starving. We determine the optimal assignment of each server whose primary station is blocked or starving in systems with three stations and zero buffers, by formulating the problem as a Markov decision process. Using this optimal assignment, we develop heuristic policies for systems with three or more stations and positive buffers, and show by means of a numerical study that these policies provide near‐optimal throughput. Furthermore, our numerical study shows that these policies developed for assembly‐type systems also work well in tandem systems. © 2008 Wiley Periodicals, Inc. Naval Research Logistics, 2008  相似文献   

11.
The problem of developing good schedules for Navy C-Schools has been modeled as a combinatorial optimization problem. The only complicating feature of the problem is that classes must be grouped together into sequences known as pipelines. An ideal schedule will have all classes in a pipeline scheduled in consecutive weeks. The objective is to eliminate the nonproductive time spent by sailors at C-Schools who are waiting for the next class in a pipeline. In this investigation an implicit enumeration procedure for this problem was developed. The key component of our algorithm is a specialized greedy algorithm which is used to obtain a good initial incumbent. Often this initial incumbent is either an optimal schedule or a near optimal schedule. In an empirical analysis with the only other competing software system, our greedy heuristic found equivalent or better solutions in substantially less computer time. This greedy heuristic was extended and modified for the A-School scheduling problem and was found to be superior to its only competitor. © 1998 John Wiley & Sons, Inc. Naval Research Logistics 45: 533–551, 1998  相似文献   

12.
实战化训练是提高信息化条件下联合作战协同能力的基本途径。信息化条件下实战化联合作战协同训练要充分运用信息技术,构建顺畅的实战化联合作战协同训练的基本模式和运行机制,科学掌握实战化训练实施方法。  相似文献   

13.
Characteristically, a small subset of operational problems admit risk neutrality when contingent claims methodology were used in their analysis. That is, for the majority of manufacturing and production problems, operating cash flows are not directly linked to prices of traded assets. However, to the extent that correlations can be estimated, the methodology's applicability to a broader set of operational problems is supported. Our article addresses this issue with the objective of extending the use of contingent claims techniques to a larger set of operational problems. In broad terms, this objective entails a partial equilibrium approach to the problem of valuing uncertain cash flows. To this end, we assume risk aversion and cast our approach within Merton's intertemporal capital asset pricing model. In this context, we formulate a “generic” production valuation model that is framed as an exercise in stochastic optimal control. The model is versatile in its characterization and can easily be adapted to accommodate a wide‐ranging set of risk‐based operational problems where the underlying sources of uncertainty are not traded. To obtain results, the model is recast as a stochastic dynamic program to be solved numerically. The article addresses a number of fundamental issues in the analysis risk based decision problems in operations. First, in the approach provided, decisions are analyzed under a properly defined risk structure. Second, the process of analysis leads to suitably adjusted probability distributions through which, appropriately discounted expectations are derived. Third, through consolidating existing concepts into a standard and adaptable framework, we extend the applicability of contingent claims methodology to a broader set of operational problems. The approach is advantageous as it obviates the need for exogenously specifying utility functions or discount rates.© 2011 Wiley Periodicals, Inc. Naval Research Logistics, 2011  相似文献   

14.
This paper examines the (n, m) scheduling problem with n operations distributed among m machines. An algorithm for solving this problem is presented and, gives a good heuristic solution on a wide class of problems. Computational results are reported which demonstrate the efficiency of this approach.  相似文献   

15.
Motivated by some practical applications, we study a new integrated loading and transportation scheduling problem. Given a set of jobs, a single crane is available to load jobs, one by one, onto semitrailers with a given capacity. Loaded semitrailers are assigned to tractors for transportation tasks. Subject to limited resources (crane, semitrailers, and tractors), the problem is to determine (1) an assignment of jobs to semitrailers for loading tasks, (2) a sequence for the crane to load jobs onto semitrailers, (3) an assignment of loaded semitrailers to tractors for transportation tasks, and (4) a transportation schedule of assigned tractors such that the completion time of the last transportation task is minimized. We first formulate the problem as a mixed integer linear programming model (MILPM) and prove that the problem is strongly NP‐hard. Then, optimality properties are provided which are useful in establishing an improved MILPM and designing solution algorithms. We develop a constructive heuristic, two LP‐based heuristics, and a recovering beam search heuristic to solve this problem. An improved procedure for solutions by heuristics is also presented. Furthermore, two branch‐and‐bound (B&B) algorithms with two different lower bounds are developed to solve the problem to optimality. Finally, computational experiments using both real data and randomly generated data demonstrate that our heuristics are highly efficient and effective. In terms of computational time and the number of instances solved to optimality in a time limit, the B&B algorithms are better than solving the MILPM. © 2015 Wiley Periodicals, Inc. Naval Research Logistics 62: 416–433, 2015  相似文献   

16.
We study the problem of minimizing the makespan in no‐wait two‐machine open shops producing multiple products using lot streaming. In no‐wait open shop scheduling, sublot sizes are necessarily consistent; i.e., they remain the same over all machines. This intractable problem requires finding sublot sizes, a product sequence for each machine, and a machine sequence for each product. We develop a dynamic programming algorithm to generate all the dominant schedule profiles for each product that are required to formulate the open shop problem as a generalized traveling salesman problem. This problem is equivalent to a classical traveling salesman problem with a pseudopolynomial number of cities. We develop and test a computationally efficient heuristic for the open shop problem. Our results indicate that solutions can quickly be found for two machine open shops with up to 50 products. © 2005 Wiley Periodicals, Inc. Naval Research Logistics, 2005  相似文献   

17.
In this work, we examine port crane scheduling with spatial and separation constraints. Although common to most port operations, these constraints have not been previously studied. We assume that cranes cannot cross, there is a minimum distance between cranes and jobs cannot be done simultaneously. The objective is to find a crane‐to‐job matching which maximizes throughput under these constraints. We provide dynamic programming algorithms, a probabilistic tabu search, and a squeaky wheel optimization heuristic for solution. Experiments show the heuristics perform well compared with optimal solutions obtained by CPLEX for small scale instances where a squeaky wheel optimization with local search approach gives good results within short times. © 2004 Wiley Periodicals, Inc. Naval Research Logistics, 2004.  相似文献   

18.
In the classical EPQ model with continuous and constant demand, holding and setup costs are minimized when the production rate is no larger than the demand rate. However, the situation may change when demand is lumpy. We consider a firm that produces multiple products, each having a unique lumpy demand pattern. The decision involves determining both the lot size for each product and the allocation of resources for production rate improvements among the products. We find that each product's optimal production policy will take on only one of two forms: either continuous production or lot‐for‐lot production. The problem is then formulated as a nonlinear nonsmooth knapsack problem among products determined to be candidates for resource allocation. A heuristic procedure is developed to determine allocation amounts. The procedure decomposes the problem into a mixed integer program and a nonlinear convex resource allocation problem. Numerical tests suggest that the heuristic performs very well on average compared to the optimal solution. Both the model and the heuristic procedure can be extended to allow the company to simultaneously alter both the production rates and the incoming demand lot sizes through quantity discounts. Extensions can also be made to address the case where a single investment increases the production rate of multiple products. © 2004 Wiley Periodicals, Inc. Naval Research Logistics, 2004.  相似文献   

19.
当前装备供应保障系统中维修器材存在短缺、积压以及配送系统效率低下等问题,亟须对生产、库存和配送作业环节进行集成优化。为客观反映各个决策环节,将该问题公式化为一个混合整数线性规划模型,针对该模型多变量、多约束的特点,提出了一个基于数学规划的两阶启发式算法对其进行求解。结合算例,检验模型的可行性,并选取求解器CPLEX和一个类似的迭代算法与该算法在求解质量和运算时间方面进行对比与分析。结果表明,提出的模型是合理可行的,该算法在求解不同规模实例时表现出优异的性能。  相似文献   

20.
The scheduling problem addressed in this paper concerns a manufacturer who produces a variety of product types and operates in a make‐to‐order environment. Each customer order consists of known quantities of the different product types, and must be delivered as a single shipment. Periodically the manufacturer schedules the accumulated and unscheduled customer orders. Instances of this problem occur across industries in manufacturing as well as in service environments. In this paper we show that the problem of minimizing the weighted sum of customer order delivery times is unary NP‐hard. We characterize the optimal schedule, solve several special cases of the problem, derive tight lower bounds, and propose several heuristic solutions. We report the results of a set of computational experiments to evaluate the lower bounding procedures and the heuristics, and to determine optimal solutions. © 2005 Wiley Periodicals, Inc. Naval Research Logistics, 2005.  相似文献   

设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号