首页 | 本学科首页   官方微博 | 高级检索  
相似文献
 共查询到20条相似文献,搜索用时 156 毫秒
1.
The paper considers the economic lot scheduling problem (ELSP) where production facility is assumed to deteriorate, owing to aging, with an increasing failure rate. The time to shift from an “in‐control” state to an “out‐of‐control” state is assumed to be normally distributed. The system is scheduled to be inspected at the end of each production lot. If the process is found to be in an “out‐of‐control” state, then corrective maintenance is performed to restore it to an “in‐control” state before the start of the next production run. Otherwise, preventive maintenance is carried out to enhance system reliability. The ELSP is formulated under the capacity constraint taking into account the quality related cost due to possible production of non‐conforming items, process inspection, and maintenance costs. In order to find a feasible production schedule, both the common cycle and time‐varying lot sizes approaches are utilized. © 2003 Wiley Periodicals, Inc. Naval Research Logistics 50: 650–661, 2003  相似文献   

2.
Many Naval systems, as well as other military and civilian systems, generate multiple missions. An outstanding problem in cost analysis is how to allocate the costs of such missions so that their true costs can be determined and resource allocation optimized. This paper presents a simple approach to handling this problem for single systems. The approach is based on the theory of peak-load pricing as developed by Marcel Boiteux. The basic principle is that the long-run marginal cost of a mission must be equal to its “price.” The implication of this is that if missions can cover their own marginal costs, they should also be allocated some of the marginal common costs. The proportion of costs to be allocated is shown to a function of not only the mission-specific marginal costs and the common marginal costs, but also of the “mission price.” Thus, it is shown that measures of effectiveness must be developed for rational cost allocation. The measurement of effectiveness has long been an intractable problem, however. Therefore, several possible means of getting around this problem are presented in the development of the concept of relative mission prices.  相似文献   

3.
Military Standard 105D has been almost universally adopted by government and private consumers for the lot-by-lot sampling inspection of product which may be inspected on a dichotomoun basis The plan specifies, for each lot size, a random sample size and set of acceptance numbers (maximum allowable number of defectives in each sample). The acceptance numbers are based upon the binomial distribution and depend upon the quality required by the purchaser. Where several consecutive lots are submitted, a shift to less severe (“reduced”) inspection or more severe (“tightened”) inspection is specified when the ongoing quality is very high or low. Further experience permits a return to normal sampling from either of these states This paper examines the long range costs of such a sampling scheme. The three inspection types are considered as three distinct Markov chains, with periodic transitions from chain to chain. The expected sample size and the expected proportion of rejected product are determined as a function of the two parameters under control of the manufacturer, lot size and product quality. Some numerical examples are given which illustrate how to compute the overall cost of sampling inspection. Suggestions are made concerning the choice of parameters to minimize this cost.  相似文献   

4.
This study combines inspection and lot‐sizing decisions. The issue is whether to INSPECT another unit or PRODUCE a new lot. A unit produced is either conforming or defective. Demand need to be satisfied in full, by conforming units only. The production process may switch from a “good” state to a “bad” state, at constant rate. The proportion of conforming units in the good state is higher than in the bad state. The true state is unobservable and can only be inferred from the quality of units inspected. We thus update, after each inspection, the probability that the unit, next candidate for inspection, was produced while the production process was in the good state. That “good‐state‐probability” is the basis for our decision to INSPECT or PRODUCE. We prove that the optimal policy has a simple form: INSPECT only if the good‐state‐probability exceeds a control limit. We provide a methodology to calculate the optimal lot size and the expected costs associated with INSPECT and PRODUCE. Surprisingly, we find that the control limit, as a function of the demand (and other problem parameters) is not necessarily monotone. Also, counter to intuition, it is possible that the optimal action is PRODUCE, after revealing a conforming unit. © 2007 Wiley Periodicals, Inc. Naval Research Logistics, 2007  相似文献   

5.
In this article, we define a scheduling/packing problem called the Job Splitting Problem, motivated by the practices in the printing industry. There are n types of items to be produced on an m‐slot machine. A particular assignment of the types to the slots is called a “run” configuration and requires a setup cost. Once a run begins, the production continues according to that configuration and the “length” of the run represents the quantity produced in each slot during that run. For each unit of production in excess of demand, there is a waste cost. Our goal is to construct a production plan, i.e., a set of runs, such that the total setup and waste cost is minimized. We show that the problem is strongly NP‐hard and propose two integer programming formulations, several preprocessing steps, and two heuristics. We also provide a worst‐case bound for one of the heuristics. Extensive tests on real‐world and randomly generated instances show that the heuristics are both fast and effective, finding near‐optimal solutions. © 2010 Wiley Periodicals, Inc. Naval Research Logistics, 2010  相似文献   

6.
In many practical situations of production scheduling, it is either necessary or recommended to group a large number of jobs into a relatively small number of batches. A decision needs to be made regarding both the batching (i.e., determining the number and the size of the batches) and the sequencing (of batches and of jobs within batches). A setup cost is incurred whenever a batch begins processing on a given machine. This paper focuses on batch scheduling of identical processing‐time jobs, and machine‐ and sequence‐independent setup times on an m‐machine flow‐shop. The objective is to find an allocation to batches and their schedule in order to minimize flow‐time. We introduce a surprising and nonintuitive solution for the problem. © 2004 Wiley Periodicals, Inc. Naval Research Logistics, 2004  相似文献   

7.
We consider a dynamic lot‐sizing model with production time windows where each of n demands has earliest and latest production due dates and it must be satisfied during the given time window. For the case of nonspeculative cost structure, an O(nlogn) time procedure is developed and it is shown to run in O(n) when demands come in the order of latest production due dates. When the cost structure is somewhat general fixed plus linear that allows speculative motive, an optimal procedure with O(T4) is proposed where T is the length of a planning horizon. Finally, for the most general concave production cost structure, an optimal procedure with O(T5) is designed. © 2007 Wiley Periodicals, Inc. Naval Research Logistics, 2007  相似文献   

8.
This article deals with several items, including theoretical and applied results. Specific topics include (1) a discrete, economically based, attributes acceptance sampling model and its adaptations, (2) relevant costs, (3) relevant prior distributions, (4) comparison of single- and double-sampling results, and (5) reasons for marginal implementation success following excellent implementation efforts. The basic model used is one developed by Guthrie and Johns; adaptations include provisions for fixed costs as well as modifications to permit double sampling. Optimization is exact, rather than approximate. Costs incorporated into the model are for sampling inspection, lot acceptance, and lot rejection. For each of these three categories a fixed cost is included as well as two variable costs, one for each item and the other for each defective item. Discrete prior distributions for the number of defectives in a lot are used exclusively. These include the mixed binomial and Polya distributions. Single- and double-sampling results are compared. Double sampling regularly performs at only slightly lower cost per lot than single sampling. Also, some cost and prior distribution sensitivity results are presented. Comments are provided regarding actual implementation experiences in industry. Practical deficiencies with the Bayesian approach are described, and a recommendation for future research is offered.  相似文献   

9.
The Joint Replenishment Problem (JRP) involves production planning for a family of items. The items have a coordinated cost structure whereby a major setup cost is incurred whenever any item in the family is produced, and an item-specific minor setup cost is incurred whenever that item is produced. This paper investigates the performance of two types of cyclical production schedules for the JRP with dynamic demands over a finite planning horizon. The cyclical schedules considered are: (1) general cyclical schedules—schedules where the number of periods between successive production runs for any item is constant over the planning horizon—and (2) power-of-two schedules—a subset of cyclical schedules for which the number of periods between successive setups must be a power of 2. The paper evaluates the additional cost incurred by requiring schedules to be cyclical, and identifies problem characteristics that have a significant effect on this additional cost. © 1997 John Wiley & Sons, Inc. Naval Research Logistics 44: 577–589, 1997.  相似文献   

10.
This paper proposes the use of a set of simultaneous, modified Cobb-Douglas production functions to determine the “best” mix of aircraft inputs (men, spare parts, support equipment, etc.) to achieve certain levels of output. The simultaneous equations are “solved” by the use of proxy values in an iterative search process. Tests of this production function model indicate that real world data fits quite well (R2 ranges from 0.884 to 0.951) and the residuals do not appear to have any significant bias. The aircraft production functions for several types of aircraft (F-4, A-7, A-6, A-4) have been maximized for a fixed budget and specific constraints. A potential increase in output of up to 10 percent appears possible. In general the marginal value of spare parts surpasses the other inputs.  相似文献   

11.
Product quality is emerging as a major strategic instrument for competition. The purpose of this article is to assess the effects of quality control on sales, and, vice versa, the effects of the sales process on quality control. A model relating quality control and the sales process (advertising, repeat purchase, and word-of-mouth effects) is developed to evaluate the above relationships. Two special cases, with degenerate and beta distribution for defect items in the production lot, are analyzed in detail. In the former case, analytical results for the optimal quality control schemes are obtained, whereas in the latter, efficient bounds are derived to search for the optimal scheme. It is shown, analytically and numerically, that the sales parameters have significant impact on whether more “stringent” or “tighter” quality control is warranted. Future research directions are also discussed.  相似文献   

12.
In order‐quantity reorder‐point formulations for inventory items where backordering is allowed, some of the more common ways to prevent excessive stockouts in an optimal solution are to impose either a cost per unit short, a cost per stockout occasion, or a target fill rate. We show that these popular formulations, both exact and approximate, can become “degenerate” even with quite plausible parameters. By degeneracy we mean any situation in which the formulation either cannot be solved, leads to nonsensical “optimal” solutions, or becomes equivalent to something substantially simpler. We explain the reasons for the degeneracies, yielding new insight into these models, and we provide practical advice for inventory managers. © 2002 Wiley Periodicals, Inc. Naval Research Logistics 49: 686–705, 2002; Published online in Wiley InterScience (www.interscience.wiley.com). DOI 10.1002/nav.10037  相似文献   

13.
This paper does not present a new result, rather it is meant to illustrate the choice of modelling procedures available to an analyst in a typical inventory control problem. The same “average cost per unit time” expression is developed by three quite different procedures. This variety of approaches, as well as the recounting of the author's chronological efforts to solve the problem, should be of interest to the reader. The specific inventory problem studied is one where the controller of an item is faced with random opportunities for replenishment at a reduced setup cost; the problem is an integral component of the broader problem of inventory control of a group of items whose replenishments are coordinated to reduce the costs of production, procurement, and/or transportation.  相似文献   

14.
We consider the optimal control of a production inventory‐system with a single product and two customer classes where items are produced one unit at a time. Upon arrival, customer orders can be fulfilled from existing inventory, if there is any, backordered, or rejected. The two classes are differentiated by their backorder and lost sales costs. At each decision epoch, we must determine whether or not to produce an item and if so, whether to use this item to increase inventory or to reduce backlog. At each decision epoch, we must also determine whether or not to satisfy demand from a particular class (should one arise), backorder it, or reject it. In doing so, we must balance inventory holding costs against the costs of backordering and lost sales. We formulate the problem as a Markov decision process and use it to characterize the structure of the optimal policy. We show that the optimal policy can be described by three state‐dependent thresholds: a production base‐stock level and two order‐admission levels, one for each class. The production base‐stock level determines when production takes place and how to allocate items that are produced. This base‐stock level also determines when orders from the class with the lower shortage costs (Class 2) are backordered and not fulfilled from inventory. The order‐admission levels determine when orders should be rejected. We show that the threshold levels are monotonic (either nonincreasing or nondecreasing) in the backorder level of Class 2. We also characterize analytically the sensitivity of these thresholds to the various cost parameters. Using numerical results, we compare the performance of the optimal policy against several heuristics and show that those that do not allow for the possibility of both backordering and rejecting orders can perform poorly.© 2010 Wiley Periodicals, Inc. Naval Research Logistics 2010  相似文献   

15.
The problem of optimally coordinating the replenishments of the many items in stock with one another is dealt with in this article. Specifically, it considers this coordination based on classifying the items into a few groups with common order cycles for all the items in a particular group. Assuming that the cumulative distribution by value of the inventory can be characterized by a Pareto function of the type f(n) = n/(an + b), (a, b > 0), it establishes that the optimal boundaries of the groups can be obtained as closed-form expressions by solving a system of simultaneous equations. The composition of the successive groups thus obtained is found to equipartition the total cost and to follow geometric sequences in relation to the number of items, the value of items, and the lengths of the order cycles. Graphs have been proposed to aid the implementation of the grouping scheme. Simple iterative schemes are outlined within the framework of the Pareto function to handle other relevant costs.  相似文献   

16.
The construction of lot sizes usually depends upon factors influencing homogeneity. When these factors are not a function of lot quantity, it is possible to determine an optimal lot size. The optimization process balances the cost of sampling against the expected cost of lot rejection for some specified procurement quantity. The rationale for balancing the two costs is contingent upon the fact that rejection criteria waivers frequently occur when the lot size is large. This concept implies that the lot size should be as small as possible, whereas the cost of sampling drives the lot size up. Hence, trade-offs may be made. The formulation is termed a semieconomic one because it combines a pure economic objective function with a pure statistical constraint. This constraint is necessary because the nature of the items under study dictates that the cost of accepting defective material cannot be explicitly stated. The paper presents the formulation, describes when it should be used, derives a good analytical approximation under certain assumptions and gives various ramifications when it is used.  相似文献   

17.
We present a group testing model for items characterized by marker random variables. An item is defined to be good (defective) if its marker is below (above) a given threshold. The items can be tested in groups; the goal is to obtain a prespecified number of good items by testing them in optimally sized groups. Besides this group size, the controller has to select a threshold value for the group marker sums, and the target number of groups which by the tests are classified to consist only of good items. These decision variables have to be chosen so as to minimize a cost function, which is a linear combination of the expected number of group tests and an expected penalty for missing the desired number of good items, subject to constraints on the probabilities of misclassifications. We treat two models of this kind: the first one is based on an infinite population size, whereas the second one deals with the case of a finite number of available items. All performance measures are derived in closed form; approximations are also given. Furthermore, we prove monotonicity properties of the components of the objective function and of the constraints. In several examples, we study (i) the dependence of the cost function on the decision variables and (ii) the dependence of the optimal values of the decision variables (group size, group marker threshold, and stopping rule for groups classified as clean) and of the target functionals (optimal expected number of tests, optimal expected penalty, and minimal expected cost) on the system parameters.© 2011 Wiley Periodicals, Inc. Naval Research Logistics, 2011  相似文献   

18.
We study a selling practice that we refer to as locational tying (LT), which seems to be gaining wide popularity among retailers. Under this strategy, a retailer “locationally ties” two complementary items that we denote by “primary” and “secondary.” The retailer sells the primary item in an appropriate “department” of his or her store. To stimulate demand, the secondary item is offered in the primary item's department, where it is displayed in very close proximity to the primary item. We consider two variations of LT: In the multilocation tying strategy (LT‐M), the secondary item is offered in its appropriate department in addition to the primary item's department, whereas in the single‐location tying strategy (LT‐S), it is offered only in the primary item's location. We compare these LT strategies to the traditional independent components (IC) strategy, in which the two items are sold independently (each in its own department), but the pricing/inventory decisions can be centralized (IC‐C) or decentralized (IC‐D). Assuming ample inventory, we compare and provide a ranking of the optimal prices of the four strategies. The main insight from this comparison is that relative to IC‐D, LT decreases the price of the primary item and adjusts the price of the secondary item up or down depending on its popularity in the primary item's department. We also perform a comparative statics analysis on the effect of demand and cost parameters on the optimal prices of various strategies, and identify the conditions that favor one strategy over others in terms of profitability. Then we study inventory decisions in LT under exogenous pricing by developing a model that accounts for the effect of the primary item's stock‐outs on the secondary item's demand. We find that, relative to IC‐D, LT increases the inventory level of the primary item. We also link the profitability of different strategies to the trade‐off between the increase in demand volume of the secondary item as a result of LT and the potential increase in inventory costs due to decentralizing the inventory of the secondary item. © 2009 Wiley Periodicals, Inc. Naval Research Logistics 2009  相似文献   

19.
The “gold‐mining” decision problem is concerned with the efficient utilization of a delicate mining equipment working in a number of different mines. Richard Bellman was the first to consider this type of a problem. The solution found by Bellman for the finite‐horizon, continuous‐time version of the problem with two mines is not overly realistic since he assumed that fractional parts of the same mining equipment could be used in different mines and this fraction could change instantaneously. In this paper, we provide some extensions to this model in order to produce more operational and realistic solutions. Our first model is concerned with developing an operational policy where the equipment may be switched from one mine to the other at most once during a finite horizon. In the next extension we incorporate a cost component in the objective function and assume that the horizon length is not fixed but it is the second decision variable. Structural properties of the optimal solutions are obtained using nonlinear programming. Each model and its solution is illustrated with a numerical example. The models developed here may have potential applications in other areas including production of items requiring the same machine or choosing a sequence of activities requiring the same resource. © 2002 Wiley Periodicals, Inc. Naval Research Logistics 49: 186–203, 2002; DOI 10.1002/nav.10008  相似文献   

20.
An EMQ model with a production process subject to random deterioration is considered. The process can be monitored through inspections, and both the lot size and the inspection schedule are subject to control. The “in-control” periods are assumed to be generally distributed and the inspections are imperfect, i.e., the true state of the process is not necessarily revealed through an inspection. The objective is the joint determination of the lot size and the inspection schedule, minimizing the long-run expected average cost per unit time. Both discrete and continuous cases are examined. A dynamic programming formulation is considered in the case where the inspections can be performed only at discrete times, which is typical for the parts industry. In the continuous case, an optimum inspection schedule is obtained for a given production time and given number of inspections by solving a nonlinear programming problem. A two-dimensional search procedure can be used to find the optimal policy. In the exponential case, the structure of the optimal inspection policy is established using Lagrange's method, and it is shown that the optimal inspection times can be found by solving a nonlinear equation. Numerical studies indicate that the optimal policy performs much better than the optimal policy with periodic inspections considered previously in the literature. The case of perfect inspections is discussed, and an extension of the results obtained previously in the literature is presented. © 1998 John Wiley & Sons, Inc. Naval Research Logistics 45: 165–186, 1998  相似文献   

设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号