首页 | 本学科首页   官方微博 | 高级检索  
文章检索
  按 检索   检索词:      
出版年份:   被引次数:   他引次数: 提示:输入*表示无穷大
  收费全文   30篇
  免费   20篇
  国内免费   1篇
  2020年   1篇
  2019年   2篇
  2018年   1篇
  2016年   4篇
  2015年   2篇
  2014年   3篇
  2013年   4篇
  2012年   1篇
  2011年   5篇
  2010年   5篇
  2008年   4篇
  2007年   2篇
  2006年   1篇
  2005年   1篇
  2004年   6篇
  2002年   2篇
  1998年   1篇
  1997年   1篇
  1994年   2篇
  1993年   2篇
  1990年   1篇
排序方式: 共有51条查询结果,搜索用时 468 毫秒
1.
The importance of subset selection in multiple regression has been recognized for more than 40 years and, not surprisingly, a variety of exact and heuristic procedures have been proposed for choosing subsets of variables. In the case of polynomial regression, the subset selection problem is complicated by two issues: (1) the substantial growth in the number of candidate predictors, and (2) the desire to obtain hierarchically well‐formulated subsets that facilitate proper interpretation of the regression parameter estimates. The first of these issues creates the need for heuristic methods that can provide solutions in reasonable computation time; whereas the second requires innovative neighborhood search approaches that accommodate the hierarchical constraints. We developed tabu search and variable neighborhood search heuristics for subset selection in polynomial regression. These heuristics are applied to a classic data set from the literature and, subsequently, evaluated in a simulation study using synthetic data sets. © 2009 Wiley Periodicals, Inc. Naval Research Logistics, 2010  相似文献   
2.
一类高次多项式系统极限环的讨论   总被引:1,自引:0,他引:1  
通过变换将一类高次多项式系统化为Lienard系统,利用Hopf分枝定理和张芷芬唯一性定理,证明了该类系统极限环的存在性与唯一性。  相似文献   
3.
We consider the problem of sequencing n jobs on a single machine, with each job having a processing time and a common due date. The common due date is assumed to be so large that all jobs can complete by the due date. It is known that there is an O(n log n)‐time algorithm for finding a schedule with minimum total earliness and tardiness. In this article, we consider finding a schedule with dual criteria. The primary goal is to minimize the total earliness and tardiness. The secondary goals are to minimize: (1) the maximum earliness and tardiness; (2) the sum of the maximum of the squares of earliness and tardiness; (3) the sum of the squares of earliness and tardiness. For the first two criteria, we show that the problems are NP‐hard and we give a fully polynomial time approximation scheme for both of them. For the last two criteria, we show that the ratio of the worst schedule versus the best schedule is no more than . © 2002 Wiley Periodicals, Inc. Naval Research Logistics 49: 422–431, 2002; Published online in Wiley InterScience (www.interscience.wiley.com). DOI 10.1002/nav.10020  相似文献   
4.
We consider the problem of scheduling a set of n jobs on a single batch machine, where several jobs can be processed simultaneously. Each job j has a processing time pj and a size sj. All jobs are available for processing at time 0. The batch machine has a capacity D. Several jobs can be batched together and processed simultaneously, provided that the total size of the jobs in the batch does not exceed D. The processing time of a batch is the largest processing time among all jobs in the batch. There is a single vehicle available for delivery of the finished products to the customer, and the vehicle has capacity K. We assume that K = rD, where and r is an integer. The travel time of the vehicle is T; that is, T is the time from the manufacturer to the customer. Our goal is to find a schedule of the jobs and a delivery plan so that the service span is minimized, where the service span is the time that the last job is delivered to the customer. We show that if the jobs have identical sizes, then we can find a schedule and delivery plan in time such that the service span is minimum. If the jobs have identical processing times, then we can find a schedule and delivery plan in time such that the service span is asymptotically at most 11/9 times the optimal service span. When the jobs have arbitrary processing times and arbitrary sizes, then we can find a schedule and delivery plan in time such that the service span is asymptotically at most twice the optimal service span. We also derive upper bounds of the absolute worst‐case ratios in both cases. © 2015 Wiley Periodicals, Inc. Naval Research Logistics 62: 470–482, 2015  相似文献   
5.
We show the existence of a unique analytic single parameter limiting survival function arising from the repeated composition of a coherent structure as the number of components tends to infinity. Examples include the repeated composition process of the bridge structure. © 2003 Wiley Periodicals, Inc. Naval Research Logistics, 2004.  相似文献   
6.
Extending Sastry's result on the uncapacitated two‐commodity network design problem, we completely characterize the optimal solution of the uncapacitated K‐commodity network design problem with zero flow costs for the case when K = 3. By solving a set of shortest‐path problems on related graphs, we show that the optimal solutions can be found in O(n3) time when K = 3, where n is the number of nodes in the network. The algorithm depends on identifying a list of “basic patterns”; the number of basic patterns grows exponentially with K. We also show that the uncapacitated K‐commodity network design problem can be solved in O(n3) time for general K if K is fixed; otherwise, the time for solving the problem is exponential. © 2004 Wiley Periodicals, Inc. Naval Research Logistics, 2004  相似文献   
7.
基于压力、速度和温度的原始变量为自变量的守恒形式的控制方程可应用于定常流动问题,但是在求解非定常问题,例如某一典型激波管问题时,激波后温度出现过冲现象,即使通过细化网格、提高空间格式精度或者换用其他通量格式仍不能消除,这表明误差可能来自该方法本身。采用一维Euler方程对该方法进行数值分析。分析结果表明,数值误差来自时间项。通过构造相应的双时间步方程,虚拟时间项采用原始变量,而物理时间项采用守恒变量,并在两个相邻物理时间步内作为定常问题求解,可以收敛到相应的守恒形式,消除上述误差,得到准确的非定常数值解。  相似文献   
8.
基于图元识别的OCR文本图像倾斜矫正快速算法   总被引:1,自引:0,他引:1  
提出了一种基于文本图元识别以跟踪字符中心线的高精度矫正OCR图像倾斜的快速算法,该算法思想虽然简单,却具有高效和高精度的特点,同时还具有高可靠性和良好的抗噪特征.实验表明,该方法完全满足实时应用的需要.  相似文献   
9.
一种RS码快速盲识别方法   总被引:1,自引:0,他引:1       下载免费PDF全文
为了获取数字通信中未知线路的纠错编码信息,提出了一种RS码快速盲识别方法.通过对RS码的二进制表示进行码根求解的方法来检测未知线路的RS码长、本原多项式阶数以及可能的本原多项式;进而遍历得到的本原多项式对RS序列进行伽罗华域的傅里叶变换(GFFT),通过连零位置和个数最终确定未知线路的真实本原多项式和生成多项式.实验验...  相似文献   
10.
讨论作业具有线性加工时间,作业间具有链约束的两台处理机流水作业排序问题,目标函数为极小化完工时间。在作业加工时间简单线性恶化下,提出作业的非负开始和停止延迟恶化率,构造了满足约束条件的复合作业。在此基础上,给出作业间具有平行链约束的两台处理机流水作业排序问题的最优多项式算法。  相似文献   
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号