首页 | 本学科首页   官方微博 | 高级检索  
文章检索
  按 检索   检索词:      
出版年份:   被引次数:   他引次数: 提示:输入*表示无穷大
  收费全文   88篇
  免费   1篇
  2019年   4篇
  2018年   4篇
  2017年   2篇
  2016年   6篇
  2015年   3篇
  2014年   1篇
  2013年   27篇
  2012年   1篇
  2011年   2篇
  2009年   1篇
  2008年   1篇
  2007年   5篇
  2006年   2篇
  2005年   5篇
  2004年   1篇
  2002年   3篇
  2001年   1篇
  1999年   2篇
  1998年   1篇
  1997年   2篇
  1995年   1篇
  1990年   1篇
  1986年   2篇
  1983年   1篇
  1979年   1篇
  1978年   2篇
  1977年   1篇
  1974年   2篇
  1973年   1篇
  1972年   2篇
  1966年   1篇
排序方式: 共有89条查询结果,搜索用时 531 毫秒
71.
Research and development activities in a business firm or government laboratory are portrayed as a multi-stage information generation and conversion process. A “basic research” phase generates opportunities, in the form of findings in a set of scientific disciplines, which are available for subsequent exploitation. It is assumed that increments to information in a subject area are stochastic, proportional to the amount of knowledge which already exists in the area, and have values which are randomly distributed. An “exploratory development” phase is viewed as a process of selecting a subset of alternative research opportunities, improving each opportunity in the direction of its applications, estimating the value of the improved opportunity and using these estimates to choose the exploratory development results to be implemented in engineering development. The “engineering development” phase makes the value of exploratory results realizable without changing value or risk. Engineering development costs are assumed to increase as value increases. If exploratory development is not successful, additional costs in engineering development must be incurred to bring the design up to a minimum desirable level. The model is intended as a step toward formulating and analyzing problems in management planning and control of the several interrelated stages of the research and development process.  相似文献   
72.
73.
This paper examines right-hand side sensitivity analysis in linear programming as a problem in optimal sampling. Specifically, the insensitivity point of a solution is defined as the point at which the expected gain from increased accuracy in the prediction of a resource level is equal to the expected cost of procuring the information. The problem is structured using the rudiments of optimal statistical decision theory.  相似文献   
74.
A major challenge in making supply meet demand is to coordinate transshipments across the supply chain to reduce costs and increase service levels in the face of demand fluctuations, short lead times, warehouse limitations, and transportation and inventory costs. In particular, transshipment through crossdocks, where just‐in‐time objectives prevail, requires precise scheduling between suppliers, crossdocks, and customers. In this work, we study the transshipment problem with supplier and customer time windows where flow is constrained by transportation schedules and warehouse capacities. Transportation is provided by fixed or flexible schedules and lot‐sizing is dealt with through multiple shipments. We develop polynomial‐time algorithms or, otherwise, provide the complexity of the problems studied. © 2005 Wiley Periodicals, Inc. Naval Research Logistics, 2005  相似文献   
75.
We consider the problem of placing sensors across some area of interest. The sensors must be placed so that they cover a fixed set of targets in the region, and should be deployed in a manner that allows sensors to communicate with one another. In particular, there exists a measure of communication effectiveness for each sensor pair, which is determined by a concave function of distance between the sensors. Complicating the sensor location problem are uncertainties related to sensor placement, for example, as caused by drifting due to air or water currents to which the sensors may be subjected. Our problem thus seeks to maximize a metric regarding intrasensor communication effectiveness, subject to the condition that all targets must be covered by some sensor, where sensor drift occurs according to a robust (worst‐case) mechanism. We formulate an approximation approach and develop a cutting‐plane algorithm to solve this problem, comparing the effectiveness of two different classes of inequalities. © 2015 Wiley Periodicals, Inc. Naval Research Logistics 62: 582–594, 2015  相似文献   
76.
Conventional wisdom seems to hold that under Barack Obama, the US ballistic missile defence programme has been pushed aside to allow for a refreshed domestic and international agenda. Proponents point to Obama's campaign thinking and rhetoric, the ballistic missile defence (BMD) budget cuts, the decision to end the Third Site in Europe, and the reset relations with Russia through the New Strategic Arms Reduction Treaty (New START) as evidence that the programme has undergone a significant period of change, retraction and rationalisation. This article argues instead that BMD has not fallen from prominence and that there is a change in focus rather than retraction of its strategic goal. Consequently, BMD continues to grow in importance as a component of US national security strategy.  相似文献   
77.
Acceptance sampling is often used to monitor the quality of raw materials and components when product testing is destructive, time-consuming, or expensive. In this paper we consider the effect of a buyer-imposed acceptance sampling policy on the optimal batch size and optimal quality level delivered by an expected cost minimizing supplier. We define quality as the supplier's process capability, i.e., the probability that a unit conforms to all product specifications, and we assume that unit cost is an increasing function of the quality level. We also assume that the supplier faces a known and constant “pass-through” cost, i.e., a fixed cost per defective unit passed on to the buyer. We show that the acceptance sampling plan has a significant impact on the supplier's optimal quality level, and we derive the conditions under which zero defects (100% conformance) is the policy that minimizes the supplier's expected annual cost. © 1997 John Wiley & Sons, Inc. Naval Research Logistics 44: 515–530, 1997  相似文献   
78.
This article generalizes the classical periodical replacement model with minimal repair by considering the effect of the overhaul, which is assumed to be able to rejuvenate the system. The generalization is based on the notion of the virtual age of a system introduced by Kijima, Morimura, and Suzuki [“Periodical Replacement Problem without Assuming Minimal Repair,” European Journal of Operational Research, 37 , 194–203 (1988)]. © 1995 John Wiley & Sons, Inc.  相似文献   
79.
ABSTRACT

While often held up as a model of successful American counterinsurgency, the Greek Civil War presents a unique case. Peculiar local conditions and geopolitics contributed to the defeat of communist forces in Greece. A firm British and later American commitment to combating communism stood in contrast to ambiguous support from the Soviet Union in an area they considered outside of their sphere of influence. Strong nationalist feeling among the Greek population buttressed support for the government and undermined the ‘internationalist’ concessions of communist forces. These characteristics make the extrapolation of broader lessons focused on victory through the application of overwhelming American resources and the financing of local forces problematic. If lessons are to be gleaned from this case, they should focus on the critical roles played by internal political dynamics and geopolitics in undermining the strength of the insurgent forces and how these provided a stable platform from which the counterinsurgents could operate.  相似文献   
80.
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号