首页 | 本学科首页   官方微博 | 高级检索  
文章检索
  按 检索   检索词:      
出版年份:   被引次数:   他引次数: 提示:输入*表示无穷大
  收费全文   63篇
  免费   1篇
  2019年   4篇
  2018年   3篇
  2017年   4篇
  2016年   4篇
  2015年   2篇
  2014年   2篇
  2013年   21篇
  2012年   1篇
  2011年   2篇
  2007年   1篇
  2004年   1篇
  2003年   1篇
  2000年   1篇
  1997年   1篇
  1996年   3篇
  1994年   1篇
  1993年   2篇
  1992年   2篇
  1990年   1篇
  1989年   1篇
  1986年   1篇
  1985年   1篇
  1982年   2篇
  1981年   1篇
  1975年   1篇
排序方式: 共有64条查询结果,搜索用时 125 毫秒
31.
This paper presents several models for the location of facilities subject to congestion. Motivated by applications to locating servers in communication networks and automatic teller machines in bank systems, these models are developed for situations in which immobile service facilities are congested by stochastic demand originating from nearby customer locations. We consider this problem from three different perspectives, that of (i) the service provider (wishing to limit costs of setup and operating servers), (ii) the customers (wishing to limit costs of accessing and waiting for service), and (iii) both the service provider and the customers combined. In all cases, a minimum level of service quality is ensured by imposing an upper bound on the server utilization rate at a service facility. The latter two perspectives also incorporate queueing delay costs as part of the objective. Some cases are amenable to an optimal solution. For those cases that are more challenging, we either propose heuristic procedures to find good solutions or establish equivalence to other well‐studied facility location problems. © 2003 Wiley Periodicals, Inc. Naval Research Logistics, 2004.  相似文献   
32.
33.
34.
35.
It has been shown by G. Roodman that useful postoptimization capabilities for the 0-1 integer programming problem can be obtained from an implicit enumeration algorithm modified to classify and collect all fathomed partial solutions. This paper extends the the approach as follows: 1) Improved parameter ranging formulas are obtained by higher resolution classification criteria. 2) Parameters may be changed so as to tighten the original problem, in addition to relaxing it. 3) An efficient storage structure is presented to cope with difficult data collection task implicit in this approach. 4) Finally, computer implementation is facilitated by the elaboration of a unified set of algorithms.  相似文献   
36.
The greedy and balanced algorithms for the optimal assembly of arbitrary structure functions (not necessarily binary) are discussed. Conditions under which these algorithms yield optimal configurations are deduced. © 1992 John Wiley & Sons, Inc.  相似文献   
37.
38.
Washington's so-called Maritime Strategy, which sought to apply US naval might against Soviet vulnerabilities on its maritime flanks, came to full fruition during the 1980s. The strategy, which witnessed a major buildup of US naval forces and aggressive exercising in seas proximate to the USSR, also explicitly targeted Moscow”s strategic missile submarines with the aim of pressuring the Kremlin during crises or the early phases of global war. Relying on a variety of interviews and newly declassified documents, the authors assert that the Maritime Strategy represents one of the rare instances in history when intelligence helped lead a nation to completely revise its concept of military operations.  相似文献   
39.

The Soviet Union was able to develop a large military-industrial complex and become the world's second superpower despite deficiencies in its centrally planned economy because defence was given high priority status and special planning, rationing and administrative mechanisms were used to attain national security objectives. However, in the period 1976-85 the effectiveness of priority protection diminished and defence institutions experienced more of the problems typical of the shortage economic system. The heavy defence burden also created growing difficulties for the civilian economy. The attempts by the Gorbachev government to reform the defence sector and improve defence-economic relationships during perestroika (1985-91) uniformly failed. For most of the transition period, the Russian military-industrial complex has been adversely affected by its low priority status, cuts in defence spending, instability of the hybrid politico-economic system, and negative growth of the economy. The armed forces and defence industry have been reduced in size and their outputs of military services and equipment have fallen to low levels. Nevertheless, the Russian armed forces still have over one million troops, significant stocks of sophisticated conventional weapons, and a large nuclear arsenal. The government of President Putin has raised the priority of the defence sector, increased real defence spending, and adopted ambitious plans to revive Russian military power. It is likely, though, that tight resource constraints will hamper efforts to reform the armed forces and to upgrade weapons. By 2010 Russia will be an important, but not dominant, military power in Eurasia.  相似文献   
40.
Economic reconstruction typically takes place after the end of war. Yet recently, economic reconstruction has been viewed as a means to ‘win hearts and minds’ during ongoing conflict. Drawing on a variety of reconstruction experiences from Afghanistan and Iraq, we identify four ‘reconstruction traps’ that result from the incentives and constraints faced by actors involved in economic reconstruction during ongoing conflict. These traps include: 1. the credible commitment trap, 2. the knowledge trap, 3. the political economy trap, and 4. the bureaucracy trap. Avoiding these traps is critical for successful economic reconstruction; and we discuss potential strategies for doing so.  相似文献   
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号